ENS 46710
ENS Event | |
---|---|
14:00 Mar 29, 2011 | |
Title | Completion of Isa Action Plan Conversion Milestone |
Event Description | In response to a Notice of Violation (NOV), Global Nuclear Fuels - America (GNFA) committed to perform a review of the existing Integrated Safety Analysis (ISA). An ISA Action Plan and schedule for performing the ISA review was described in GNF-A's response to the NOV and the first milestone (conversion) was scheduled for completion by January 31, 2011. This milestone was subsequently extended by approximately 60 days.
On 3/29/11, GNF-A completed the ISA review for the conversion area and has identified 87 existing safety controls that are now being designated as items relied on for safety (IROFS). Implementation of the revised safety basis, IROFS and application of management measures to the new IROFS will be completed within 90 days per the ISA Action Plan. Because the revised ISA has designated existing safety controls as additional IROFS, GNF-A is making a report of this completion pursuant to the reporting requirements of 10CFR70 Appendix A(b)(1) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Safety Significance of Events: There was no event or plant condition that resulted in a degraded safety condition. Safety Equipment Status: Existing conversion area safety controls have now been designated as IROFS per ISA Action Plan. Controls are available to perform their safety function. Status of Corrective Actions: Conversion Area milestone complete. ISA Action Plan continues. The licensee intends to discuss this issue further with the State of North Carolina, New Hanover County, and the NRC Region 2 office. |
Where | |
---|---|
Global Nuclear Fuel - Americas Wilmington, North Carolina (NRC Region 2) | |
License number: | SNM-1097 |
Reporting | |
Part 70 App A (B)(1) | |
Time - Person (Reporting Time:+19.12 h0.797 days <br />0.114 weeks <br />0.0262 months <br />) | |
Opened: | Scott Murray 09:07 Mar 30, 2011 |
NRC Officer: | Joe O'Hara |
Last Updated: | Mar 30, 2011 |
46710 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
Global Nuclear Fuel with Part 70 App A (B)(1) | |
WEEKMONTHYEARENS 528112017-06-16T21:00:00016 June 2017 21:00:00
[Table view]Part 70 App A (B)(1) Unanalyzed Condition Identified ENS 507502015-01-21T20:00:00021 January 2015 20:00:00 Part 70 App A (B)(1) Dry Conversion Process Improperly Analyzed in the Current Integrated Safety Analysis ENS 502762014-07-12T21:30:00012 July 2014 21:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Operations Not Meeting Requirements ENS 487092013-01-30T20:30:00030 January 2013 20:30:00 Part 70 App A (B)(1) Completion of Integrated Safety Analysis Action Plan Balance of Plant Milestone ENS 486952013-01-22T20:30:00022 January 2013 20:30:00 Part 70 App A (B)(1) Unanalyzed Condition - Based on Ongoing Integrated Analysis Review ENS 485542012-12-03T18:30:0003 December 2012 18:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Furnace Improperly Analyzed ENS 484972012-11-09T16:00:0009 November 2012 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - System As-Found Condition Not Fully Described in Isa ENS 477052012-02-27T19:30:00027 February 2012 19:30:00 Part 70 App A (B)(1) Unanalyzed Piping Configuration Discovered ENS 473252011-10-05T18:00:0005 October 2011 18:00:00 Part 70 App A (B)(1) Item Relied on for Safety Not as Described in the Integrated Safety Analysis ENS 467102011-03-29T14:00:00029 March 2011 14:00:00 Part 70 App A (B)(1) Completion of Isa Action Plan Conversion Milestone ENS 463052010-10-02T17:30:0002 October 2010 17:30:00 Part 70 App A (B)(1) Unanalyzed Condition When Fuel Pellet Boats Became Stacked ENS 462432010-09-09T18:30:0009 September 2010 18:30:00 Part 70 App A (B)(1) Accident Evaluation Improperly Analyzed in the Integrated Safety Analysis ENS 457172010-02-23T16:00:00023 February 2010 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary ENS 454912009-11-11T20:00:00011 November 2009 20:00:00 Part 70 App A (B)(1) Incomplete Documentation of Criticality Safety Controls in Integrated Safety Analysis Summary 2017-06-16T21:00:00 | |