ENS 48709
ENS Event | |
---|---|
20:30 Jan 30, 2013 | |
Title | Completion of Integrated Safety Analysis Action Plan Balance of Plant Milestone |
Event Description | In response to a Notice of Violation [NOV] (VIO 70-1113/2010-003), Global Nuclear Fuel Americas, LLC (GNF-A) committed to perform a review of the existing Integrated Safety Analysis (ISA). An ISA action plan and schedule for performing the ISA review was described in GNF-A's response to the NOV and the third milestone (balance of plant) was scheduled for completion by January 31, 2013.
On January 30, 2013, GNF-A completed the ISA reviews for the balance of plant and has identified an additional 110 items relied on for safety (IROFS) for these areas which were existing safety controls. Implementation of the revised safety basis, IROFS, and application of management measures to the IROFS will be completed by March 31, 2013 per the current ISA action plan schedule. Because the revised ISA has designated existing safety controls as additional IROFS, GNF-A is making a report of this completion pursuant to the reporting requirements of 10CFR70 Appendix A(b)(1) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. There was no event or plant condition that resulted in a degraded safety condition. Existing balance of plant area safety controls have been identified as IROFS per ISA action plan controls [continue to] perform their intended safety function. Balance of Plant Area milestone complete per ISA action plan. The licensee will notify the R2 NRC Inspector (Thomas), North Carolina Division of Radiation Protection, and New Hanover County. |
Where | |
---|---|
Global Nuclear Fuel - Americas Wilmington, North Carolina (NRC Region 2) | |
License number: | SNM-1097 |
Reporting | |
Part 70 App A (B)(1) | |
Time - Person (Reporting Time:+17.5 h0.729 days <br />0.104 weeks <br />0.024 months <br />) | |
Opened: | Scott Murray 14:00 Jan 31, 2013 |
NRC Officer: | John Shoemaker |
Last Updated: | Jan 31, 2013 |
48709 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48709\u003C/a\u003E - \u003Ca href=\"/Global_Nuclear_Fuel\" title=\"Global Nuclear Fuel\"\u003EGlobal Nuclear Fuel\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ECompletion of Integrated Safety Analysis Action Plan Balance of Plant Milestone\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48709 - Global Nuclear Fuel\n","link":"","lat":34.320930555555556,"lon":-77.92285,"icon":""}],"imageoverlays":null} | |
Global Nuclear Fuel with Part 70 App A (B)(1) | |
WEEKMONTHYEARENS 528112017-06-16T21:00:00016 June 2017 21:00:00
[Table view]Part 70 App A (B)(1) Unanalyzed Condition Identified ENS 507502015-01-21T20:00:00021 January 2015 20:00:00 Part 70 App A (B)(1) Dry Conversion Process Improperly Analyzed in the Current Integrated Safety Analysis ENS 502762014-07-12T21:30:00012 July 2014 21:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Operations Not Meeting Requirements ENS 487092013-01-30T20:30:00030 January 2013 20:30:00 Part 70 App A (B)(1) Completion of Integrated Safety Analysis Action Plan Balance of Plant Milestone ENS 486952013-01-22T20:30:00022 January 2013 20:30:00 Part 70 App A (B)(1) Unanalyzed Condition - Based on Ongoing Integrated Analysis Review ENS 485542012-12-03T18:30:0003 December 2012 18:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Furnace Improperly Analyzed ENS 484972012-11-09T16:00:0009 November 2012 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - System As-Found Condition Not Fully Described in Isa ENS 477052012-02-27T19:30:00027 February 2012 19:30:00 Part 70 App A (B)(1) Unanalyzed Piping Configuration Discovered ENS 473252011-10-05T18:00:0005 October 2011 18:00:00 Part 70 App A (B)(1) Item Relied on for Safety Not as Described in the Integrated Safety Analysis ENS 467102011-03-29T14:00:00029 March 2011 14:00:00 Part 70 App A (B)(1) Completion of Isa Action Plan Conversion Milestone ENS 463052010-10-02T17:30:0002 October 2010 17:30:00 Part 70 App A (B)(1) Unanalyzed Condition When Fuel Pellet Boats Became Stacked ENS 462432010-09-09T18:30:0009 September 2010 18:30:00 Part 70 App A (B)(1) Accident Evaluation Improperly Analyzed in the Integrated Safety Analysis ENS 457172010-02-23T16:00:00023 February 2010 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary ENS 454912009-11-11T20:00:00011 November 2009 20:00:00 Part 70 App A (B)(1) Incomplete Documentation of Criticality Safety Controls in Integrated Safety Analysis Summary 2017-06-16T21:00:00 | |