Title | Items Relied on for Safety Associated with the Dry Scrap Recycle Furnace Improperly Analyzed |
Event Description | During a [Global Nuclear Fuels] GNF-A review of the Fuel Manufacturing Operation (FMO) Integrated Safety Analysis (ISA), it was determined at 1:30 PM yesterday (12/3/12) that Items Relied on for Safety (IROFS) associated with the Dry Scrap Recycle furnace operation were improperly analyzed in the ISA. Although criticality controls associated with preventing moderation intrusion exist and these controls remained in place, they were not sufficiently independent to meet performance requirements.
At no time was an unsafe condition present. The affected equipment has been shut down. An investigation is continuing which will provide additional corrective actions and extent of condition. While this did not result in an unsafe condition, this event is being reported pursuant with the reporting requirements of 10CFR70 Appendix A (b)(1) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery. The licensee will notify state and local governmental agencies and has notified the onsite NRC Inspectors.
An extent of condition review determined there are three more areas with IROFS that are not sufficiently independent. These areas are vaporization/conversion of the Dry Conversion Process, an area used to pack material for recovery and a hood that is used to transition to a moderation restricted area in the gadolinia shop. The affected equipment in these areas has also been shut down and the investigation continues to identify additional corrective actions. The licensee notified the onsite NRC Inspectors. Notified R2DO (Blamey) and NMSS (Rahimi). |
Where | |
---|---|
Global Nuclear Fuel - Americas Wilmington, North Carolina (NRC Region 2) | |
License number: | SNM-1097 |
Reporting | |
Part 70 App A (B)(1) | |
Time - Person (Reporting Time:+18.55 h0.773 days <br />0.11 weeks <br />0.0254 months <br />) | |
Opened: | Scott Murray 13:03 Dec 4, 2012 |
NRC Officer: | Pete Snyder |
Last Updated: | Dec 5, 2012 |
48554 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
Global Nuclear Fuel with Part 70 App A (B)(1) | |
WEEKMONTHYEARENS 528112017-06-16T21:00:00016 June 2017 21:00:00
[Table view]Part 70 App A (B)(1) Unanalyzed Condition Identified ENS 507502015-01-21T20:00:00021 January 2015 20:00:00 Part 70 App A (B)(1) Dry Conversion Process Improperly Analyzed in the Current Integrated Safety Analysis ENS 502762014-07-12T21:30:00012 July 2014 21:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Operations Not Meeting Requirements ENS 487092013-01-30T20:30:00030 January 2013 20:30:00 Part 70 App A (B)(1) Completion of Integrated Safety Analysis Action Plan Balance of Plant Milestone ENS 486952013-01-22T20:30:00022 January 2013 20:30:00 Part 70 App A (B)(1) Unanalyzed Condition - Based on Ongoing Integrated Analysis Review ENS 485542012-12-03T18:30:0003 December 2012 18:30:00 Part 70 App A (B)(1) Items Relied on for Safety Associated with the Dry Scrap Recycle Furnace Improperly Analyzed ENS 484972012-11-09T16:00:0009 November 2012 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - System As-Found Condition Not Fully Described in Isa ENS 477052012-02-27T19:30:00027 February 2012 19:30:00 Part 70 App A (B)(1) Unanalyzed Piping Configuration Discovered ENS 473252011-10-05T18:00:0005 October 2011 18:00:00 Part 70 App A (B)(1) Item Relied on for Safety Not as Described in the Integrated Safety Analysis ENS 467102011-03-29T14:00:00029 March 2011 14:00:00 Part 70 App A (B)(1) Completion of Isa Action Plan Conversion Milestone ENS 463052010-10-02T17:30:0002 October 2010 17:30:00 Part 70 App A (B)(1) Unanalyzed Condition When Fuel Pellet Boats Became Stacked ENS 462432010-09-09T18:30:0009 September 2010 18:30:00 Part 70 App A (B)(1) Accident Evaluation Improperly Analyzed in the Integrated Safety Analysis ENS 457172010-02-23T16:00:00023 February 2010 16:00:00 Part 70 App A (B)(1) Unanalyzed Condition - Incomplete List of Safety Controls in Integrated Safety Analysis Summary ENS 454912009-11-11T20:00:00011 November 2009 20:00:00 Part 70 App A (B)(1) Incomplete Documentation of Criticality Safety Controls in Integrated Safety Analysis Summary 2017-06-16T21:00:00 | |