|
---|
Category:License-Operator
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] |
Text
2005 April SONGS NRC Written Exam Exam Item Analysis Question #3 Question #20 Question #21 Question #22 Question #32 Question #47 Question #50 50% failure rate This question was found to be technically valid. Two different distractors were selected, which would indicate a generic weakness in this topic area. Examinees will be provided with remedial training focused on Core Protection Calculators (CPCs).
50% failure rate This question was found to be technically valid.
Two different distractors were selected, which would indicate a generic weakness in this topic area. Examinees will be provided with remedial training focused on Pressurizer OPERABILITY and the applicable Technical Specifications.
50% failure rate This question was found to be technically valid.
One distractor was selected, which could indicate a common mis-conception in this topic area. Examinees will be provided with remedial training focused on instrumentation power supplies.
50% failure rate This question was found to be quite difficult, but technically valid.
Two different distractors were selected, which would indicate a generic weakness in this topic area. Examinees will be provided with remedial training focused on SGTR mitigation strategy.
100% initial failure rate
/ 0% failure rate after re-grade RE-GRADE:
This question was found to have some technical issues, and is being submitted for re-grade. Various references refer to 340°F as the maximum temperature. Refer to the attached documentation for justification for accepting A and B as correct answers.
The question will be modified prior to future use.
16.67% initial failure rate
/ 0% failure rate after re-grade RE-GRADE:
This question was found to have some technical issues, and is being submitted for re-grade.
Under certain conditions an EDG can be considered OPERABLE with starting air pressure as low as 136 psig. Refer to the attached documentation for justification for accepting A and B as correct answers.
The question will be modified prior to future use.
50% failure rate This question was found to be technically valid.
One distractor was selected, which could indicate a common mis-conception in this topic area. Examinees will be provided with remedial training focused on Emerpencv Diesel Drotection.
2005 April SONGS NRC Written Exam Exam Item Analysis Question #53 Question #54 Question #61 Question #65 Question #72 83.33% failure rate This question was found to be technically valid, but could have benefited from having a more clearly stated stem. Refer to the attached documentation for further discussion. This confusion led to two different distractors being selected.
The question will be modified prior to future use. 33.33% initial failure rate
/ 16.67% failure rate after re-grade RE-GRADE:
This question was found to have some technical issues, and is being submitted for re-grade. Containment stay times have not been evaluated for temperatures greater than 140°F. Refer to the attached documentation for justification for accepting A and B as correct answers.
The question will be modified prior to future use. 33.33% initial failure rate
/ 66.67% failure rate after re-grade RE-GRADE:
This question was found to have some technical issues, and is being submitted for re-grade.
The question refers to Turbine Control vice Turbine Protection. Turbine Control response to elevated turbine speed is different than that of Turbine Protection. This confusion led to one distractor being selected by several candidates.
Refer to the attached documentation for justification for accepting A as the correct answer.
The question will be modified prior to future use.
50% failure rate This question was found to be technically valid.
Two different distractors were selected, which would indicate a generic weakness in this topic area.
Examinees will be provided with remedial training focused on the Steam Bypass Control System (SBCS) operation.
100% failure rate This question was found to be technically valid, although the explanation of the question in the answer key has one major technical error: The threshold for Ehgh Contamination Areas is 2 150,000 dpm/100cm2 betdgamma.
All candidates chose the same distractor, which would indicate a generic weakness in this topic area. Examinees will be provided with remedial training focused on radiation limits and exposure control. SRO-only Question
- 84 100% failure rate Although technically accurate, the question would be better stated as having significantly lower leakage, and designated as Pressure Boundary Leakage. This would provide a much more stable plant condition, coupled with a Technical Specifications required shutdown.
Refer to the attached for further discussion. Examinees will be provided with remedial training focused on use of 10CFR50.54~.
The question will be modified prior to future use.