River Bend Station, Unit 1 - NRC Receipt of Licensee Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations (TAC No. MD1623)
ML061650386
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/16/2006
From: Bhalchandra Vaidya
NRC/NRR/ADRO/DORL/LPLIV
To: Hinnenkamp P D
Entergy Operations
vaidya B K, NRR/DLPM, 415-3308
References
GL-06-003, TAC MD1623
Download: ML061650386 (3)


Text

June16, 2006Mr. Paul D. HinnenkampVice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - NRC RECEIPT OF LICENSEE RESPONSETO GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC No. MD1623)

Dear Mr. Hinnenkamp:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response toGeneric Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." In the letter dated June 1, 2006, as supplemented by letter dated June 14, 2006, you stated, under oath or affirmation, that River Bend Station does not rely on either the Hemyc or MT fire barrier system and that the other 1 or 3-hour fire barrier (Thermo-Lag 330),

that separates redundant safe shutdown trains located within the same fire area, has been designed and installed in accordance with current NRC guidance. Based on your response, as supplemented, the basis for stating that the Thermo-Lag 330 fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.If you have any questions regarding this response, please contact me at (301) 415-3308.Sincerely,/RA/Bhalchandra Vaidya, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-458 cc: See next page June 16, 2006Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - NRC RECEIPT OF LICENSEE RESPONSETO GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC No. MD1623)

Dear Mr. Hinnenkamp:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your response toGeneric Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." In the letter dated June 1, 2006, as supplemented by letter dated June 14, 2006, you stated, under oath or affirmation, that River Bend Station does not rely on either the Hemyc or MT fire barrier system and that the other 1 or 3-hour fire barrier (Thermo-Lag 330),

that separates redundant safe shutdown trains located within the same fire area, has been designed and installed in accordance with current NRC guidance. Based on your response, as supplemented, the basis for stating that the Thermo-Lag 330 fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site, and will be subject to inspection during the normal NRC inspection process.If you have any questions regarding this response, please contact me at (301) 415-3308.Sincerely,/RA/Bhalchandra Vaidya, Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-458 cc: See next page DISTRIBUTION

PUBLIC LPLIV r/f RidsOgcRpRidsAcrsAcnwMailCenterRidsRgn4MailCenter (KKennedy)

RidsNrrDorlLpl4RidsNrrPMBVaidyaRidsNrrLALFeizollahi RidsNrrPMBSingalDFrumkin, DRAQNguyen, DPRACCESSION NO: ML061650386OFFICENRR/LPL4/PMNRR/LPL4/LAAFPB/BCNRR/LPL4/BCNAMEBVaidyaLFeizollahiSWeerakkodyDTeraoDATE6/15/066/15/066/15/066/16/06OFFICIAL RECORD COPY Bend Station cc:Winston & Strawn LLP 1700 K Street, N.W.

Washington, DC 20006Manager - LicensingEntergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775President of West FelicianaPolice Jury P. O. Box 1921 St. Francisville, LA 70775Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064Ms. H. Anne Plettinger3456 Villa Rose Drive Baton Rouge, LA 70806Wise, Carter, Child & CarawayP. O. Box 651 Jackson, MS 39205Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995General Manager - Plant OperationsEntergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director - Nuclear SafetyEntergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775Vice President - Operations SupportEntergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995Attorney GeneralState of Louisiana P. O. Box 94095 Baton Rouge, LA 70804-9095Brian AlmonPublic Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326Richard Penrod, Senior Environmental ScientistState Liaison Officer Office of Environmental Services Northwestern State University

Russsell Hall, Room 201 Natchitoches, LA 71497