|
---|
Category:E-Mail
MONTHYEARML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staff'S Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23080A1892023-03-20020 March 2023 RP Inspection Document Request ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds 2024-02-01
[Table view] |
Text
-.4't Subj: Re: Materials Date: 9/4/2003 9:21:26 AM Eastern Daylight Time From: ..David Vito"<DJV@nrc.qov>
To: .. "Eileen Neff' <EXNl @nrc.gov>, "Leanne Harrison"-.MII. .kplIpo.KP DO@nrc.gov2>, "Sharon Johnson" <S-LIkpo.KP DO@nrc.gov>
Sent from the Internet (Details)Dr. Harvin, Thanks for your prompt response.
All of the material was received successfully.
My supervisor will be discussing the receipt of your initial information with Region I management this morning, and I will be preparing a package of information today for distribution to appropriate staff for review. We anticipate the receipt of the additional specific information that you indicated y3u would be providing.
For your information, our process involves an initial discussion (within the xt two weeks) among cognizant staff to determine our initi .... irse of action.Following that meeting, a letter will be sent to you (within 30 days of our conversation yesterday) acknowledging our receipt of your concerns and providing a description of.your concerns, as we understand them.Regarding your visit to Region I, please select a date iuring the week of Septermber 22, .2003, that is convenient for you and con:act me or Sharon with that information.
Then we will be able to make the'appropriate arrangements (time, room, court reporter, etc). It is my hope that we will be able to incorporate the information presented during that meeting into our. lett.er to ydu which will relate our understanding of your concerns.
Also, since you have indicated that you may have been discriminated against for raising your concerns about the work environment at Artifical Island, we will.more than like.y ask someone from the NRC Office of Investigations(OI) to sit in on the discussic.i.
Also, I mentioned to you in our conversation yesterday.
- hat one part of our approach to the work environment issue may be to requesz a formal response from PSEG (without using your name), but I forgot to ask yot if you had a problem with that approach.
That is normally the first step that t *e NRC;' as an agency, takes for this type of issue (i.e., so that we can obtain a .itten statement from licensee management, which can be referred to later as Fdditional information is developed).
Please provide your response to this quest-on as soon as is convenient.4 Thanks again.David J. Vito Senior Allegation Coordinator NRC Region I.09/03/03 11:42PM >>>Dave, Sharon and Eileen, I am more grateful than I can express for our conversat...ons today. Thank you for listening intently, asking probing questions, and c.-ring about the concerns I voiced and the experiences I shared with yoL I am attaching some files and have faxed additional in: rmation. Please confirm receipt of the following:
via email attachment (1) verbatim comments from PSEG Nuclear's SCWE survey from 4Q2002-1Q2003 (distribi ed to the PSEG management team by the Employee Concerns manager);
(2) draft-of my civil 11
",. -,.~complaint which has NOT been filed as of yet; (3) my resume so you can see my background and assess my credibility.
Via fax I have sent (1) my letter of 3/25/03 (and allboss) and (2) letter from PSEG'Nuclear dated 7/17/03 (but n sent t unt~l 8/19/03) re. my allegations 7C expressed on 3/25/03 in my letter to I will be sending more specific and more technical information as welT- as additional SCWE documentation.
I am fully available, as I expressed today, to answer questions and support a thorough investigation.
I trust you and others way smarter than me will be able to determine the extent of the issues and appropriate actions..
I will tell you, as I did today, that from all that I have read, from the.conversations I have had with high-level nuclear executives from other facilities, from dialogues with industry experts committed to nuclear safety, and from my firsthand experiences at PSEG Nuclear, Duke Energy's Oconee, McGuire andCatawba Nuclear Stations, I consider PSEG Nuclear to be eeringly s imilar to Millstone and Davis Besse. Others who know PSEG Nuclear well have expressed a similar concern.I will call you tomorrow (Thursday).
Sincerely, Kymn N. Kymn Harvin, Ph.D.g ., #' q "lI I.^,~ , * -"* W -1ag~