MONTHYEARML0705903332007-02-27027 February 2007 Supplement to Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt-Welds Project stage: Request ML0708004492007-03-29029 March 2007 Confirmatory Action Letter (CAL No. NRR-07-023) Palisades Nuclear Plant Project stage: Other ML0734610172007-12-12012 December 2007 Day Post-Outage Report Per CAL No. NRR-07-023 Pressurizer Butt Weld Inspection Project stage: Other ML0803201532008-01-31031 January 2008 Supplement to 60-Day Post-Outage Report Per Cal No. NRR-07-023 Pressurizer Butt Weld Inspection Project stage: Request ML0811502432008-05-15015 May 2008 Completion of Actions for Confirmatory Action Letter NRR-07-023 (Tac No. MD4168) Project stage: Other ML0913502032009-05-14014 May 2009 Palisades - 60-Day Reports Per Bulletin 2004-01 and CAL NRR-07-023 Pressurizer Inspection Results Project stage: Other 2007-03-29
[Table View] |
|
---|
Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] |
Text
N Committed to Nuclear EXC Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 27,2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Supplement to Inspection and Mitigation of Alloy 6001821182 Pressurizer Butt-Welds By letter dated January 30, 2007, NMC submitted information regarding inspection and mitigation of Alloy 600/82/182 pressurizer butt-welds for the Palisades Nuclear Plant (PNP). On February 21, 2007, and February 23, 2007, conference calls with the NRC staff took place to discuss the January 30, 2007, letter.
It was determined that a supplement to the January 30,2007, letter was necessary.
In addition to the commitments listed in the January 30, 2007, letter, NMC is committing to six new commitments and revising two commitments for PNP. The commitments were discussed with the NRC staff and are listed below. Summaw of Commitments This letter contains six new commitments as follows: 1. NMC will determine unidentified leakage daily whenever the unit is in Mode 1, 2, or 3 steady state operations, until the completion of the 2007 refueling outage at PNP. NMC will implement this commitment no later than March 8, 2007. NMC will notify the NRC in writing, prior to making any changes to this commitment.
- 2. If the unidentified Primary Coolant System (PCS) leakage increases
0.1 gallons
per minute (gpm) over the previous daily reading and is sustained for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, NMC will take action to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, and perform a bare metal visual examination of the Alloy 6001821182 butt-weld locations, unless it can be confirmed the increase is not from these pressurizer welds, until the completion of the 2007 refueling outage at PNP. NMC will implement this commitment no later than March 8, 2007. NMC will notify the NRC in writing, prior to making any changes to this commitment.
27780 Blue Star Memorial Highway
- Covert, Michigan 49043-9530 Telephone: 269.764.2000 Document Control Desk Page 2 3. If unidentified PCS leakage increases 0.25 gpm above baseline (see item
- 4) and is sustained for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, NMC will take action to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, and perform a bare metal visual examination of the Alloy 600/82/182 butt-weld locations, unless it can be confirmed the increase is not from these pressurizer welds, until the completion of the 2007 refueling outage at PNP. NMC will implement this commitment no later than March 8, 2007. NMC will notify the NRC in writing, prior to making any changes to this commitment.
- 4. NMC will determine the baseline PCS leakage rate from data obtained during the first 7 days of steady state operation at approximately 100%
power, after the most recent bare metal visual examination of the pressurizer Alloy 600/82/182 butt-welds, until the completion of the 2007 refueling outage at PNP. NMC will implement this commitment no later than March 8, 2007. NMC will notify the NRC in writing, prior to making any changes to this commitment.
- 5. NMC will provide inspection results of any bare metal visual examinations performed as a result of these requirements to the NRC in a written report within 60 days of plant restart until the completion of the 2007 refueling outage at PNP. NMC will notify the NRC in writing, prior to making any changes to this commitment.
- 6. NMC will complete inspections of the pressurizer Alloy 600/82/182 butt-welds at PNP during the 2007 refueling outage per the industry guidance, MRP-139. NMC will notify the NRC in writing, prior to making any changes to this commitment. This letter contains two revised commitments as follows: Commitment made by letter dated January 30, 2007:
- 1. Until all Alloy 600/82/182 pressurizer butt-welds are either mitigated or replaced, all Alloy 600/82/182 pressurizer butt-welds will be examined per the industry guidance on Alloy 600/82/182 butt-welds (MRP-139). Revised commitment:
- 7. NMC will inspect the Alloy 600/82/182 pressurizer butt-welds per MRP-139, on a frequency of at least every four years, until the Alloy 600/82/182 pressurizer butt-welds are mitigated or removed at PNP. NMC will notify the NRC in writing, prior to making any changes to this commitment.
Document Control Desk Page 3 Commitment made by letter dated January 30, 2007: 2. Until all Alloy 600/82/182 pressurizer butt-welds are either mitigated or replaced, reports of future inspection results will be submitted to the NRC within 60 days of the end of the station refueling outage during which the inspection was performed. Revised commitment:
- 8. NMC will provide results of future inspections, including inspections on unmitigated welds and any corrective or mitigative actions taken on the pressurizer surge, spray, safety, or relief nozzle and safe end welds containing Alloy 600/82/182 material, within 60 days of the end of the station refueling outage during which the inspection was performed, until the Alloy 600/82/182 pressurizer butt-welds are mitigated or removed at PNP. NMC will notify the NRC in writing, prior to making any changes to this commitment.
n-3 r 7 Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Co., LLC cc: Administrator, Region Ill, USNRC Project Manager, Palisades Nuclear Plant, USNRC Resident Inspector, Palisades Nuclear Plant, USNRC