| Q | CCA | Title |
---|
05000341/FIN-2016001-10 | 2016Q1 | | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for Primary Containment Isolation Valve Actuations |
05000341/FIN-2016001-05 | 2016Q1 | | Failure to Satisfy 10 CFR 50.73 Reporting Requirements for a Condition Prohibited by the Plants Technical Specifications |
05000341/FIN-2016001-03 | 2016Q1 | | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for Loss of RPS Trip Safety Functions |
05000341/FIN-2016001-04 | 2016Q1 | P.4 | Failure to Incorporate Operating Experience into Preventive Maintenance Activities Associated with the TBCCW System |
05000341/FIN-2016001-09 | 2016Q1 | H.1 | Inadvertent Reactor Water Low Level Reactor Protection System Actuation Due to Operator Error |
05000341/FIN-2016001-08 | 2016Q1 | | Failure to Follow Apparent Cause Evaluation Procedure |
05000341/FIN-2016001-07 | 2016Q1 | | Inadequate Test Criteria in SGTS Flow/Heater Operability Surveillance Test |
05000341/FIN-2016001-06 | 2016Q1 | | Failure to Translate Design Requirements of the RHRHVAC System into Procedures |
05000341/FIN-2016001-02 | 2016Q1 | H.14 | Failure to Correctly Interpret and Implement TS Requirements for RPS Trip Functions |
05000341/FIN-2016001-01 | 2016Q1 | | Failure of the Plant-Referenced Simulator to Demonstrate Expected Plant Response for Safety Relief Valves |
05000341/FIN-2016002-02 | 2016Q2 | | Inadequate Test Procedure Used for Measuring and Determining Average Silt Levels in the Service Water Reservoir |
05000341/FIN-2016406-01 | 2016Q2 | H.13 | Security |
05000341/FIN-2016002-01 | 2016Q2 | H.12 | Failure to Control Combustible Materials |
05000341/FIN-2016002-03 | 2016Q2 | H.9 | Loss of Power Instrumentation TS 3.3.8.1 Applicability Following Bus 64C Potential Transformer Fuse Failures |
05000341/FIN-2016201-01 | 2016Q2 | | Security |
05000341/FIN-2016002-04 | 2016Q2 | P.2 | Failure to Control the Work Hours of Covered Workers |
05000341/FIN-2016002-05 | 2016Q2 | | Failure to Use Correct Material in a Feedwater Heater Level Control Valve Resulted in a Loss of Feedwater Heater Drains and a Reactor Recirculation System Runback |
05000341/FIN-2016002-06 | 2016Q2 | | Failure to Implement Adequate Preventive Maintenance on Spare Terminals in Safety-Related Motor Control Centers |
05000341/FIN-2016007-03 | 2016Q3 | H.4 | Failure to Verify the Ability to Manually Throttle Safety-Related MOVs during a DBA |
05000341/FIN-2016007-02 | 2016Q3 | P.6 | Failure to Verify the Adequacy of the Voltage Supplied to Transformer #64 Load Tap Changer |
05000341/FIN-2016007-07 | 2016Q3 | P.6 | Failure to Ensure that Protective Devices for the Loads Required at the Beginning of a LOCA Would Not Trip Under Degraded Voltage Conditions |
05000341/FIN-2016007-13 | 2016Q3 | P.2 | Failure to Identify a CAQ Associated with Over-Dutied 480V Safety-Related Switchgear Breakers |
05000341/FIN-2016003-01 | 2016Q3 | P.2 | Failure to Perform an Operability Determination for Division 1 RPV Reference Leg Backfill System Not Providing Adequate Flow |
05000341/FIN-2016003-02 | 2016Q3 | | Fluctuating Background Effect on Accident Range Noble Gas Monitor |
05000341/FIN-2016007-11 | 2016Q3 | H.6 | Failure to Apply Design Control Measures to a Design Change Associated with NIAS Accumulator Capability |
05000341/FIN-2016007-01 | 2016Q3 | | Inadequate Procedure for Addressing Non-Functional MDCT Fan Motor Brake System |
05000341/FIN-2016007-04 | 2016Q3 | | Failure to Periodically Test the EDG Capability to Start and Accelerate All of the Sequenced Loads Within the Applicable Limits |
05000341/FIN-2016007-05 | 2016Q3 | | Failure to Leak Test All Division 2 NIAS Boundary Isolation Valves |
05000341/FIN-2016007-06 | 2016Q3 | | Failure to Ensure that the MSIVs Would Close Within the TS Required Timeframe and as Described in the UFSAR |
05000341/FIN-2016007-08 | 2016Q3 | | Inadequate Containment Debris Inspections Acceptance Criteria |
05000341/FIN-2016007-09 | 2016Q3 | | Failure to Evaluate the Acceptability of Drywell Coatings with Respect to Potential ECCS Suction Strainer Blockage |
05000341/FIN-2016007-10 | 2016Q3 | | Non Conservative ECCS Suction Strainer Min-K Combined Generation and Transport Factors |
05000341/FIN-2016007-12 | 2016Q3 | H.4 | Failure to Identify an Out-of-Specification Pressure Reading on the Nitrogen Supply to the A MDCT Fan Motor Brake System |
05000341/FIN-2016007-14 | 2016Q3 | | Failure to Identify that an Inadequate Minimum MSIV Accumulator Air Pressure Setpoint Was CAQ |
05000341/FIN-2016007-15 | 2016Q3 | H.14 | Failure to Identify that a Non-Conservative Min-K Insulation Volume Calculation Error Was Nonconforming to the ECCS Suction Strainer Licensing Basis |
05000341/FIN-2016007-16 | 2016Q3 | H.13 | Failure to Timely Identify, Document, and Evaluate Conditions that Challenge Operability |
05000341/FIN-2016003-03 | 2016Q3 | H.8 | Failure to Follow Procedures During Concrete Placement of Flexible Storage Facility Buildings |
05000341/FIN-2016004-05 | 2016Q4 | H.12 | Failure to Lock an Area Meeting Locked High Radiation Area Conditions |
05000341/FIN-2016004-01 | 2016Q4 | | Inadequate Work Instructions for Maintenance on Flexible Couplings for EDGs |
05000341/FIN-2016004-02 | 2016Q4 | H.9 | Failure to Correctly Interpret and Implement TS Requirements for LOP Instrumentation and AC Electrical Power Functions |
05000341/FIN-2016004-03 | 2016Q4 | | Failure to Satisfy 10 CFR 50.73 Reporting Requirements for Loss of LOP Instrumentation and AC Electrical Power Safety Functions |
05000341/FIN-2016004-04 | 2016Q4 | | Inadequate Testing of SGTS Filters |