Emergency Action Level Flowpath. Sheet 10 of 10.No Rev Date
ML18022A752
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/05/1990
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18022A741 List:
References
PEP-101, NUDOCS 9001220012
Download: ML18022A752 (3)


Text

SHEARON HARRIS NUCLEAR PO'Uf'ER PLANT UNIT III REVISION APPROVAL E 2 NO DATE SIGNATURE TITL;PLANT GEN.MGR, 44 C4 w+gC SIDE 1 EAL TABLE 3 CAROLINA PQVER L LIGHT CQMPANY SHE(-")RQN HARRIS NUCLEAR PQVER PLANT DOSE PROJECTION MONITORS 1.CNMT HI I14NGE ACCIDENT HONITQRS 2, PLANT VENT STACK 01 VIDE R4NGE GAS HONI OR EFFLUENT CHANNEL 3.M4IN STEAM LINE MONITORS 4.STACK 05 MONITOR VIDE RANGE GAS MONI OR EFFLUENT CH4NNEL 5.STACK 854 HONITOR VIDE R4NGE GAS MONITOR Ef'f LUENT CHANNEL INDICATE CURRENT EAL ON EAL STATUS BOARD ATTACHMENT 1 EMERGENCY AC~I N L FVE Fl@PA H ANY RAD MON ON EAL NO TABLE 3 IN HIGH AL4RM MALFUNCTIQ RESULTING IN UNCONTROLABLE BORON DILUTIO Na EMERGENCY DOSE PROJECTIONS QR ENVIROMENT4L MONITORING RESULTS 4 VAIL ABLE YES YES PEP-101 REV.4 SHEET 10 QF 10 YES ANY YELLOV LIGHT ON TRIAXIAL NO RESPONSE SPECTRUM ANNUNCIATOR LIT NO PLANT IK MODE 6 EMERGENCY DOSE PRIIJECTION RESULTS 4V41LABLE Na YES DILUTION EVENT YES LASTING>15 HINs YES PERFORM DOSE PROJECTION PER PEP-343 OR PEP-341 ANY RED NP LIGHT ON TRIAXIA RESPONSE SPECTRUH ANNUNCIATOR LIT YES NO DILUTION EVENT LASTING>35 HINs Na PROJECTED DOSE RATE)1 REM/HR<VB)AT EAB ALERT EAL EXCEEDED ALERT EAL EXCEEDED YES YES YES RE-EVALUATE EALS AT ENTRY POINT Y VHEN DOSE PRO If'l'TTONC l OHPI f Tf"0 SITE EMERGENCY EAL EXCEEDED SITE EMERGENCY EAL EXCEE~CPD.

Nh PROJECTED DOSE RATE 5 REM/HR (THYROID)4T EAB YES ANY RAIDIOLOGICAL CONDITION VARRANTING RECQMMEND4TIDN Ta EVACUATE OR SHELTER THE PUBLIC DECLARE GENERAL EMERGENCY ADVERSE WEATHER NO EAL STATUS BOARD DECLARE GENERAL EMERGENCY MAKE NOTIFICATIONS Na YES GENERAL EMERGENCY SITE EMERGENCY RE-EVALUATE EALS 4S CONDITIONS V4RRANT TORNADO H43 HIT THE POWER BLOCK MAKE NOTIFICATIONS ALERT UNUSUAL EVENT L PROJECTED DOSE>1 REM<VB)AT EAB YES RE-EVALUATE EALS AS CONDITIONS WARRANT NO ANY PLANT CONDITION THAT IN THE JUDGEMENT OF THE SHIFT FOREMAN OR SITE EMERGENCY COORDINATOR ARRANTS A SITE EHERGENC DECLAR4TIDN PROJECTED OR MEASURED SUST4INED Na VIND SPEED*T 10 METERS>90 MPH NO NQ CONTINUING ACTION: TIME PROJECTED YES DOSE>5 REH (THYROID>AT EAB BEGAN(REQUIRED DURATION (MIN)EXPIRES CURRENT EAL AFFECTED YES YES Na Na SUSTAINED VIND SPEEDS AT 10 METERS 100 MPH SITE EHERGENCY EAL EXCEEDED USE ADVERSE MET ASSUMPTION (CHI/0=.000617 SEC/M3)F'R DETERMININ PROJECTED DOSE RATES ALERT EAL EXCEEDED YES AIRBORNE RAD LEVELS INDICATE SEVERE YES DEGRADATIQ(f IN R4DIOACTIVE MATERIAL CONTROL SITE EHERGENCY EAL EXCEEDED PROJECTED DOSE YES RATE>50 MREM/HR<VB>aT EAB NO NO ANY PLANT CONDITIO EXISTS TH4T IN THE JUDGEMENT OF THE SHIFT f'QRMAN OR SITE EMERGENCY COORDINATOR VARR4NTS AN ALERT DECELARATION AIRCR4f T CR4SH, MISSLE IMPACT OR Na UNPLANNED EXPLOSIO INSIDE PI3VER LOCK PROJECTED DOSE yES RATE>250 mREM/HR THYROID)AT EA YES ESTIH4TED DURATION Of RELEASE>30 HINs YES NO ALERT EAL EXCEEDED Na PLANT IN COLD SHUTDOVN NO HAS 4 SITE EMERG QR NQ ALERT BEEN EXCEEDED NO PROJECTED DOSE yES RATE>250 mREH/HR<VB)AT EAB SAFETY RELATE EQUIP OR STRUCTURE AFF ECTED EVALUATE AGAINST UNUSUAL EVENT MATRIX NO YES DECLARE HIGHEST EMERGENCY ON EAL STATUS BOARD NO ALERT EAL EXCEEDED YES PRQ JECTED DOSE yES RATE>2.5 REM/HR (THYROID)AT EA 4NY UNUSUAL EVENT N13 CONDITION IDENTIFI SITE EHERGENCY EAL EXCEEDED HAKE NOTIF1CATIQNS NQ EMERGENCY DECL4R4TIQN ESTIMATED DUR4TION Qf'ELEASE>2 MINs YES YES NO RE-EVALUATE E4LS 4S CONDITIONS V*RR4NT DECLARE UNUSUAL EVENT SITE EMERGENCY EAL EXCEEDED UNCONTROL'R UNPLANNED RELEASE OF TOXIC IIR FLAMMABLE GAS INTO POVER LOCK NO HAKE NOTIFICATIONS CONSULT AP-615 ERC-109,?L?-500, PLP-502 AND S?-017 FOR (ITHER REPORT aBIL IT Y REQUIRMENTS YES ENVIRONMENTAL MONITORING RESULTS AVAILABLE RE-EV4LUATE EALS AS CONDITIONS WARRANT RELEASE ENDANGERING PERSONNEL OR f3?ERABILITY OF ESF EQUIP RE-EVALUATE EALS AT ENTRY POINT Y VHEN ENVIRONHENT4L MQNITORIN RESULTS AVAILABLE YES LAL DE ARATION TIME YES HEASURED VHOLE BODY DOSE RATE>I R/HR AT EAB NQ PLANT IN COLD SHUTDQVN Na Ef-"fL TABLE 6 1-131 EQUIV CIINC>1.46E-6 uCl/cc AT EAB YES YES Rf-")DIATIQN MONITOR TAG NUMBERS DECLARE GENER4L EMERGENCY ALERT EAL EXCEEDED MONITOR DESCRIPTION INSTRUMENT TAG NQ.CNMT LEAK DETECTION REH-ILT-35024-34 MONITOR RM-11 CHANNEL ERF'IS POINT ID NQ.ID Na.Na 2GS303 RLT3502B SITE EMERGENCY EAL EXCEEDED MAKE NOTIFIC4TIQNS 2AX162 24X163 1EX817 RCR3589A RCR35904 R4 V3509H CNMT HI RANGE 4CCIDENT MONITORS RM-1CR-3589-SA RM-1CR-3590-SB PLANT VENT STACK ()I VIDE RANGE GAS MONITOR EFFLUENT CH4NNEL RM-21AV-3509-1SA RE-EVALUATE EALS AS CONDITIONS WARRANT TURBINE FAILUR RESULTING IN CASING PENETRATIO TURBINE BUILDING STACK 3A RM-1TV-3536-1 VIDE R4NGE GAS MONITOR EfFLUENT CHANNEL 2EX827 RTV3536D MEASURED VHQLE BQDY DasE YES RATE>50 mR/HR AT EAB MAIN STEAM LINE MONITORS RM-1MS-3591-SB RH-1MS-3592-SB RM-1MS-3593-SB 5*X164 5AX165 5AX166 RMS3591A RHS35924 RMS3593A YES ALERT EAL EXCEEDED F'UEL BREACH ARE4 RADIATIQN MONITQRSi VOLUME CONTROL TANK RM.CHARGING PUHP 1A ROOM CHARGING PUMP 1B RI3OM CHARGING PUMP 1C RI3QM RECYCLE EVAP.VLV.GAL, LETDOVN HX VALVE GAL.MQDER4TING HX VLV.GAL.RM-1RR-3595 RM-1RR-35994 RM-1RR-3599B RM-1RR-3599C RM-1RR-3600 RH-1RR-3601 RM-1RR-3602 144056 14A060 1AA061 1A4062 1AA063 1AA064 1AA065 RRR3595A RRR3599A RRR3599B RRR3599C RRR36004 RRR3601A RRR36024 MEASURED I-131 EQUIV CONC YES 7.31E-8 uCl/cc 4T EAB MEASURED YES LEVEL HAS EXISTED 30 MINs NO CONTROL ROOM EVAC REQUIRED QR ANTICIPATED STACK 45 MONITOR VIDE R4NGE G4S MONITOR EFFLUENT CH*NNEL RM-1VV-3546-1 4EX837 RVV3546D NO STACK 05A MONITOR VIDE RANGE GAS MONITOR EFFLUENT CHANNEL 4EX847 RM-1VV-3547-1 RVV3547D YES MEASURED WHOLE BODY DOSE YES RATE>500mR/HR AT EAB LIQUID Ef'f'LUENT MONITORS TREATED LAUNDRY 6 HOT SHOWER DISCHARGE AUX CONTROL PANEL<ACP)OPERATIONAL NO 4EE667 REM-21WL-3540 RVL3540B REM-21VS-3542 4EE687 RVS354ZB SECOND4RY VASTE SAHPLE TANK DISCHARGE WASTE MONITOR TANK DISCHARGE YES NO CONTROL ROOM EV4CUATED f'R>15 MINs Na 4EE677 REM-1VL-3541 RVL3541B ME4SURED 1-131 EQUIV CONC>7,31E-7 uCl/cc 4T EAB ALERT EAL EXCEEDED YES SITE EHERGENCY EAL EXCEEDED ME4SURED yES-.u puc-uac t XlcTLD FQR)2 MINs NO PO(w'ER BLOCK INCLUDES CONTAINMENT AND THE FO LO'wiNG BUILDINGS REACTOR AUXILLIARY, TURBINE, FUEL HANDLING, Im(A TE PROCESSING, TANK AREA, DIESEL, DIESEL FUEL OIL STORAGE, K, F E HOUSE, INTAKE STRUCTLIRES, AND DUCT BANKS SERVING THES BUILDINGS.

SITE EHERGENCY EAL EXCEEDED NO EAL TABLE 5 MONITOR IN EAL TABLE 5 READIN YES 10 TINES THE HIGH ALARM ET POINT EAL TABLE 4 SEISMIC EVENT SYMPTOMS EFFLUENT MONITORS 1.PLANT VENT STACK (II VIDE RANGE G4S MONITOR EfFLUENT CHANNEL 5.TREATED LAUNDRY 6 HOT SHOVER DISCH4RGE MONITO 6.SECONDARY V4STE S4MPLE TANK DISCHARGE MONITOR 7.WASTE MONITOR TANK DISCHARGE MONITOR ALERT EAL EXCEEDED 1.'SEISHIC HON SYS 13BE EXCEEDED'LARM (ALB 10-4-4)AND/OR'ALARM'IGHT ON THE SEISMIC SWITCH PANEL.NO 2.TURBINE BUILDING STACK 834 VIDE RANGE GAS MONITOR Ef'FLUENT CHANNEL 2.VHITE EVENT INDICATOR QN SMA CONTROL PANEL.3.ALARM AT TRIAXIAL RESPONSE SPECTRUM ANNUNCIATOR.

4.NOTICABLE TREMORS OR VIBRATII3N.

3.ST4CK 05 VIDE RANGE GAS HQNITOR EFFLUENT CH4NNEL 4.STACK l)5A VIDE RaNGE GAS MONITOR EFf LUENT CHANNEL ANY TVO INDICATIONS OF'SEISHIC EVENT LISTED 13N EAL T4BLE 4 YES NO SITE EMERGENCY COORDINATOR JUDGEMENTS OTHER EVENTS QR SPECIFIC LCOs EXCEEDED OTHER PLANT CONDITIONS EXIST TH4T VARR4NT INCREASED AWARENESS ON THE PART OF'HE PL4NT OPERATING ST4f'F, CHATHAM, H4RNETT, LEE, AND WAKE COUNTIES AND THE STATE Of NORTH CAROLINA 1)UNPLANNED ECCS DISCHARGE TQ VESSEL 2)INITI4TION QF ANY SHUTDOWN REQUIRED BY TECHNIC4L SPECIF ICATIQNS 3)CONTAHINATED OR POTENTIALLY CONTAMINATED INJURED INDIVIDU4L REQUIR-ING afrSITE HEDICaL TREATMENT 4)OTHER PLaNT CaNDITIQNS EXIST THAT INVOLVE OTHER THAN NORMAL CONTROLLED SHUTDOVN<E.G, COQLDOVN R4TE EXCEEDING TECHNIC4L SPECIT104TION LIMITS PIPE CRACKING FOUND DURING OPERATIDN)

GASEOUS OR LIQUID EFFLUENT<3)

EXCEEDING TECHNICAL SPECIF ICATIONS 1.VALID HIGH ALARM ON ANY Qf'HE HONITORS IN E4L TABLE 5 AND THE RELEASE HAS NOT BEEN TERHINATED f UEL DAMAGE INDICATION 1)GROSS FAILED FUEL DETECTOR INDICATES AN INCREASE GREATER THAN 2E4 CPH VITHIN 30 MINUTES 2)RCS SPECII IC 4CTIVITY EXCEEDS TECHNICAL SPECIFICATION 3.4.8 LOSS OF SECONDARY CQ13LANT OR COOLING 1)RAPID DEPRESSURIZA-

++TION OF SECONDARY SIDE 2)M4IN STEAM OR FEEDVATER BREAK 3)FAILURE OF'SG SAFETY OR PQRV TO f'ULLY RESET AFTER OPERATItIN 4)SG BLOVDOVN LINE BREAK (HQDES L?6 3)LOSS Qf REACTOR COOLANT 1)f 4ILURE gf A PRESSUR-IZER SAF-TY OR RELIEF VALVE TD CLOSE FOL-LOWING REDUCTION OF APPLICABLE PRESSURE 2)LOSS Of REACTOR COOL-ANT OR PRIHARY TQ SECONDARY SYSTEM LEAKAGE IN EXCESS OF TECHNICA SPECIF'ICA-TIQN 3.4.6.2 LINLISLII-'IL EVENT MATRiX LOSS Qf HETEORQLQGICAL DATA, ERFIS QR COMMUNICATIONS CAPABILITY SECURITY THREAT f IRE Loss af povER FIRE LASTING MORE THAN 10 HINUTES VITHIN THE PROTECTED AREA A SECURITY ALERT HAS BEEN DECLARED AS DEFINED IN THE SECURITY PLAN D LOSS Of ALL REPRESENT4TIVE METEQROLQGICaL DATA 2)INABILITY OF ERFIS TQ PERFORM ITS INTENDED FUNCTION FOR A CONTINUI3US PERIOD QF 4 HOURS VHILE IN MODES L?3, OR 4 4S DEFINED Byi A.FAILURE OF'OTH CPU'S B.FAILURE OF BOTH D4TA CONCENTRATORS C.FAILURE OF BOTH D4TA DISC D.INABILITY TO DISPLAY SPDS IN THE CONTROL ROOM E.INABILITY TO UPDATE CURRENT DATA DISPLAYS IN THE CONTROL ROOM<THIS IS NOT TO BE CONSTRUED AS A FAILURE OF'SINGLE VARIABLE OR SM4LL SUBSET OF DAT4 3)f AILURE Of BOTH SITE TELEPHONE AND EMERGENCY TELEPHONE SVITCHES 1)LOSS Qf ALL OFFSITE POVER, OR 2)LOSS OF BOTH EMERGENCY DIESEL GENERATORS NATURAL PHENOMENA AND OTHER PLANT HAZARDS 1)INDICATION OF'NY TVQ SEISMIC SYMPTOMS LISTED IN EAL TABLE 4 2)HURRICANE OR TORNADO CROSSING EAB 3)AIRCRAFT CRASH VITHIN EAB OR UNU-SUAL*IRCRAF'T ACTI-VITY OVER f'4CILITY 4)TRAIN DER4ILMENT VITHIN EAB 5)UNPLANNED EXPLOSION VITHIN EAB 6>UNPLANNED TOXIC OR FL4MMABLE GAS RE-LEASE GREATER THAN 10 POUNDS WITHIN EAB 7)TURBINE ROTATING COMPONENT FAILURE RESULTING IN 4 RE4CTOR TRIP 8)WATER LEVELS IN THE MAIN AND AUXILIARY RESERVOIRS>

MAIN>240.2 f T.205.7 f T.AUXILLIARY

>257,7 f'T.<250.0 F'T.

SID E 2 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 01 APPROVAL REVISION NO, DATE 4 e'a9 SIGNATURE TITL PLANT GEN.MGR.SQK I INDICATE CURRENT EAL tlt EAL ST4TUS DOARD AHY RAD HON ON EAL tot T4$LE 3 IN tQGH ALARH YES EHERGEMCY MSE PROJECTIQHS OR ENVIROHEHTAL HONITQRING RESULTS AV4ILADLE EAL TABLE 3 DOSE PROJECTION MONITORS I CNHT Hl RANGE ACCIDENT MONITORS 2.PLANT VENT STACK 01 VIDE RANGE GAS MONITOR EFFLUENT CHANNEL 3.HAIN STE4M LINE HONITORS 4.STACK 05 MONITQF!VIDE RANGE GAS HONITOR EFFLUENT CHANNEL 5 STACK 65A NQNITOR VIDE RANGE GIS MONITOR EFFLUENT CHANNEL NQ MAL FUNC RESULTING IN UNCDNTROLADLE DORON DILUTID YES CAROLINA POWER 8 LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT ATTACHME NT j.EHERGENL Y ACTIDN LEVEL I:LUVPATH PEP-101 REV, 4 SHEET 10 QF 10 PERFORM DOSE PROJECTION PER PEP"343 OR PEP-341 RE&VALUATE EALS AT ENTRY POINT Y VtKN DOSE PROJECTIDNS COHPLETED EMERGENCY DOSE PROJECTION RESULTS 4VAILADLE PROJECTED DOSE R4TE>I REH/HR (VD)AT ON YES ALERT EAL EXCEEDED I 4NY YELLOV LIGHT QN TRIAXIAL NO RESPONSE SPECTRUM SNNUNCI4TOR LIT YES 4NY RED UGHT ON TRI*RESsQNSE SPECTRUM ANNUNCIATOR LIT YES SITE EMERGENCY EAL EXCEEDED PL4MT IN MODE 6 YES NO DILUTION EVENT LASTING>35 lONs SITE EHERGENCY EAL EXCEEDED NO DILUTIQH EVENT YES LASTING>15 MINs ALERT EAL EXCEEDED PROJECTED MSE RATE>5 REM/HR CTNYROQl>AT EAll lECL4RE GENERAL ENERGENCY HAKE NOTIFICATIONS ADVERSE VE4TNER NQ YES ANY RADIOLOGICAL CONDITION VARRANTING RECOMMENDATIDN TO EV4CUATE QR SHELTER THE PUDLIC DECLARE GENERAL EHERGENCY EAL STATUS BOARD PROJECTED DINE>I REM<VN AT EAD PRO JECTED DOSE>5 REM CTHYRtQD)AT EAD USE ADVERSE HET ASSUMFTIQN

<cto/0-.000617 SEC/Hs)FOR DETERHINI PROJECTED DOSE R4TES YES RE-EVALUATE EALS AS CONDITIONS VARRANT ALERT EAL EXCEEDED TORNADO HAS HIT THE POVER DLQCK 4 NO PROJECTED OR HE*SURED SUSTAINED NO VIND SPEED 4T 10 METERS>90 NPH NO SUST*IHED VIND SPEEDS AT 10 HETERS>100 t0%t ANY PLANT CONDITION THAT IN THE JUDGEHENT OF THE Stttff FOREMAN OR SITE EMERGENCY COORDINATOR ARRANTS A SITE EMERGENC DECLARATION TES SITE EtKRGENCY EAL EXCEEDED MAKE NQTtftcaTIQMS REEVALUATE EALS AS CONDITIONS VARRANT GENERAL EMERGENCY SITE EMERGENCY ALERT UNUSUAL EVENT CONTINUING ACTION!BEGANF REQUIRED DURATION (MIN)EXPIRES!CURRENT CLASSIFICATION RETURN TO ENTRY POINT TIME PROJECTED DOSE II4TE>50 NREM/HR<VD)AT EAD SITE EMERGENCY EAL EXCEEDED 40NORNE RAD LEVELS INDICATE SEVERE YES DEGRADATIOM IN R*DIOACTIVE MATERI*L CONTROL PROJECTED MSE YES RATE>250 a!KM/NR ID)AT EA ESTIMATED DURATION OF 7 S RELEASE>30 HINs AIRCRAFT CRAS)6 MISSLE IMPACT OR UNPLANNED EXPLOSIO INSQK POVER K YES 4NY PLANT CONDITIO EXISTS THAT IH THE JUDGEMENT OF THE SHIFT FORMAN OR SITE EMERGENCY COORDINATOR V4RRINTS 4N ALERT DECLARA ALERT EAL EXCEEDED PROJECTED DOSE R4TE>250 HKN/HR<VD>AT EAD PROJECTED DOSE RATE>25 REH/tot<THYROID)AT EA ALERT EAL EXCEEDED PLANT IN COLD SHUTDOVN SAFETY RELATE EQUIP OR STRUCTURE AFFECTED YES SITE EHERGENCY EAL EXCEEDED HAS A SITE EHERG OR NO ALERT SEEN EXCEEDED 1)ECLARE HIGHEST ENERGENCY ON E4L STATUS MARD HAKE NOTIFICATIONS EVALUATE 4GAIMST UNUSUAL EVENT H*TRIX AMY UNUSUAL EV NQ CONDITION IDENTI REEVALUATE EALS 4T ENTRY POINT Y VNEN ENVIRONMENTAL HONITORIN RESULTS AV4ILADLE FNVGtQNMF NTAL HONITORING RESULTS 4vaILADLE YES MEASURED VHOLE DQDY DOSE RATE>1 R/HR AT EAD ESTIMATED DURATION OF YES RELEISE>2 MINs SITE EMERGENCY EAL EXCEEDED ONTROL'R UNPL4NNED RELE*SE OF TDXIC OR FL4MMADLE GAS INTO POVER OCK Yco RELEASE ENDANGERING PERSONNEL OR OPERADILITY OF ESF EQUIP NO PL4NT IN COLD SHUTDQVN NO RE-EVALUATE EALS AS CONDITIONS VARRAMT YES DECLARE UNUSUAL EVENT HAKE MOTIF ICATIDHS RE-EVALUATE EALS AS CONDITIOI@

VARRANT EAL DECLARATION NQ EMERGENCY DECL*RATION CONSULT If&Is)RC-I09PLP-500, PLP-502 AND SP-017 FOR OTHER REPDRTADILITY REQUIRHENTS TIME 1-131 EQUIV CONC>1,462-6 uCVcc AT EAD MEASURED VFNLE DODY MSE YES RATE>50 nR/HR AT EAD YES DECLARE GEFKRAL EMERGENCY MAKE NOTIFICATIONS RE-EVALUATE EALS*S COHDITIONS VARRANT SITE ENERGENCY EAL EXCEEDED YES ALERT EAL EXCEEDOl TURDINE FAILUR RESULTING IN CASING PENETRATI YES EAL TABLE 6 HOFQTOR DESCRIPTION CMHT LEAK DETECTION>KM IT OR CNMT IQ RANGE ACCIDENT MOFQTORS PLANT VENT STACK 01 VQIE RANGE GAS H(IOTOR EFFLUENT CttAHNEL TURDINE WILDING STAQK 34 VIDE RANGE GAS HOHITOR EFFLUENT CHANNEL MAIN STEAH LINE HOHITQRS INSTRUMENT TAG HIL REH-ILT-3502A-SA RM-1CR-3509-SA RH-ICR-3590-Sl RM-21A V-3509-1SA RN-I TV-3536-1 RN-11 CHANNEL ERFIS PDQIT 1$NQ ID NO.RLT3502l DAX162 2AX163 IEX017 RCR3509A RCR3590*RAV3509H 2EX027 RTV3536$RADIATIQN MONITCIR TAG NUMBERS MEASURED 1-131 EQUIV CONC YES>7312M uCt/cc AT EAl MEASURED YES LEVEL HAS EXISTED>30 MIMs COHTROL RQDM EV4C REQUIRED OR ANTICIPATED ALERT EAL EXCEEDED RM-IHS-3591-Sl RM-I MS-3592-S 3 RH-IHS-3593-SD RM-IRR-3595 RH-1RR-3599A RH-iRR-3599$

RN-IRR" 3599C RN-IRR-3600 RH"1RR-3601 RH-IRR-3602 STACK 05 HONITOR VIDE RANGE GAS MONITOR EFFLUENT CHANNEL RH 1VV-3546 I FUEL DRE4CH AREA RADIATiON MONITORS VOLUME CONTROL T4NK RN.CHARGING PUHP 1A ROON CHARGING PUNP 1$ROON CHARGING PUHP 1C ROON RECYCLE EVAP.VLV, GAL.LETDOVN HX VALVE GAL HODERATING HX VLV.GAL 5AX164 5AX165 5*X166 1AA056 IAA 060 1*A061 1AA 062 1AA 063 IAA064 1AA 065 RMS3591A RMS35924 RHS3593A RRR3595A RRR3599A RRR3599$RRR3599C RRR3600A RRR3601A RRR36024 RVV3946$YES STACK 05A HONITOR VIDE RANGE GAS HONITOR EFFLUENT CHANNEL RM-IVV-3547-1 4EXQ47 RVV3547$HE4SURED VHOLE DODY MSE YES RATE>50042/HR AT EAD MEASURED I"131 EQ<QV CONC YES>731E-7 uCl/cc 4T EAD AUX CONTROL P4NEL<ACP)OPERATIONAL YES ALERT EAL EXCEEDED CONTROL ROOM EVACUATED FOR>15 HINs LICIIID EFFLUENT HONITORS TREATED LAUNDRY 0 HOT SHOVER DISCHARGE SECDNDARY VASTE SAHPLE TANK DISCHARGE VASTE HONITOR TANK DISCHARGE REH-21VL-3540 REH-21VS-3542 IKM-lVL-3541 4EE667 4EE687 4EE677 RVL3540$RVS3542$RVL3541$MEASURED LEVEL HAS EXISTED FOR>2 HINs SITE EMERGENCY EAL EXCEEDED SITE EHERGEMCY EAL EXCEEDED POWER BLOCK INCLUDES CONTAINMENT AND THE FOLLOWING BUILDINGS REACTOR AUXILLIARY, TURBINE, FUEL HANDLING, WASTE PROCESSING, TANK AREA, DIESEL, DIESEL FUEL OIL STORAGE, K, F IRE HOUSE, INTAKE STRUCTURES, AND DUCT BANKS SERVING THESE BUILDINGS, MOMTOR IN EAL TADLE 5 READ>10 TINES TtK HIGH ALARH T POINT ANY TVO INDICATIONS OF A SEISMIC EVENT LISTED ON E TABLE 4 NO ALERT EAL EXCEEDED EAL TABLE 4 SEISMIC EVENT SYMPTOMS L sSEISMIC HOH SYS ODE EXCEEDED'LARM (ALD 10-4-4>AMD/QR ALARH'IGHT ON THE SEISMIC SVITCH PANEL 2.VHITE EVENT D<DICATOR QN SMA CONTROL PANEL.3.ALARM AT TRIAVIL RESPONSE SPECTRUH ANNUNCIATOtL 4.NOTICADLE TREHORS OR VIDRATIOFC EAL TABLE 5 EFFLUENT MONITORS 5, TREATED LAUNDRY I HOT SHQVER DISCHARGE HONI 6.SECONDARY VASTE SA>0'LE TAto(DISCHARGE HOHITOR 7.VASTE HONITOR TANK llSCHARGE HONITOR 1.PL4NT VENT STACK 01 VIDE RANGE GAS NONITOR EFFLUENT CHANNEL 2 TURDIME DUIUIING STACK DSA VtlE RANGE GAS MONITOR EFFLUEHT CHANNEL 3, STACK$5 VIDE RANGE GAS HONITOR EFFLUENT CHANNEL 4 STACK 054 VIDE RANGE GAS NONITIDI EFFLUEHT CHANNEL GASEOUS OR LIQUID EFFLUENT<0)

EXCEEDING TECHNICAL SPECIFICATIONS FUEL DAHAGE INDICATION LOSS OF SECONDARY COOLANT OR COOUNG LOSS OF REACTOR COOLANT LOSS OF POVER LOSS OF'ETEOROLOGICAL DATI, ERFIS OR COMMUNICATIONS CAP4$ILITY FIRE UNUSUAL EVENT MATRIX SECURITY THREAT HATURAL PHENOMENA AND OTHER PLANT HAZARDS SITE EHERGENCY CMRDINATIN JUDGEHENTS OTHER EVENTS OR SPECIFIC LCOs EXCEEDED 1.VALID NIGH ALARN ON ANY 7 OF THE HQNITORS IH EAL TADLE 5 4ND TME RELE4SE HAS NQT SEEN TERMINATED 1)GROSS FAILED FUEL DETECTOR INDICATES AN INCREASE GREATER THAN 2E4 CPM VITHQt 30 MIHUTES 2)RCS SPECIFIC ACTIVITY EXCEEDS TECFDQCAL SPECIFICATION 33 Jt I)RAPID DEPRESSURIZ*

TION OF'ECONDARY SIDE 2)H*IN STEAH OR FEEDVITER DtKAK 3>ratLURE Qr I sG SAFETY OR PORV TD FULLY RESET AFTER OPERATION 4>SG DLQVMVN LINE DREAK (MODES IA I 3>1)F4ILURE OF*PRESSUR-IZER SAFETY OR RELIEF VALVE TO CLOSE FDL-LOVING REDUCTION OF APPLICADLE PRESSURE 2)LOSS QF REACTOR COOL-ANT OR PRIHARY TO SECONDARY SYSTEH LEAKAGE IN EXCESS OF TECHNICAL SPECIFICA-TION 3462 I>LOSS OF ALL OFFSITE POVOD DR 2)LOSS OF DOTH EHERGEMCY DKSEL GENER4TORS

]P>LOSS Of ALL REPIKSENTATIVE METEOROLOGIC4L DATA 2)QIADILITY OF ERFIS TO PERFQRH ITS INTENDED FUNCTION FDR I CONTINUOUS PERIOD OF 4 HOURS VtQLE IH MODES L23, QR 4 AS DEFINED DYi 4.F4ILURE OF DOTH CPU'S L FAILURE Of MTH DATA CONCENTRATDRS Q FAILURE OF$0!TH DATA DISC D.INADILITY TO DISPLAY SPDS IN THE CONTROL ROOM E, IN4$ILITY TO UPDATE CURRENT DATA DISPLAYS IH THE COICTROL ROON (TFQS IS NOT TO DE CONSTRUED AS A FAILURE OF I SINGLE VARIADLE OR SHALL SVDSET OF DATA 3)f4ILURE OF MTN SITE TELEPHONE AND EHERGENCY TELEPtKINE SVITCHES FIRE LASTING HORE THAM 10 NINUTES VITHIN THE PROTECTED AREA A SECURITY ALERT HAS SEEN DECL4RED AS DEFINED IN THE SECURITY PLAN I)IMDICATIDN OF ANY TVO VALID SEISMIC SYHPTOMS LISTED IN EAL TASLE 4 2)HURRICANE OR TORNADO CROSSING EAD 3)AIRCRAFT CRASH VITFON EAD OR UNU-SUAL AIRCRAFT ACTI-VITY OVER FACILITY 4)TRAIN DER*ILNENT VITHQl EAD 5>UNPLANNED EXPLOSION VITHIM EAD 6>UNPLANNED TOXIC OR FLAMHADLE GAS RE-LEASE GREATER THAN 10 POUNDS VITHIN EAD 7>TURDINE ROTaTING COHPONENT FAILURE RESULTING IN*REACTDR TRIP 8>VATER LEVELS IN THE M4IN 4ND AUXILIARY RESERVQIRSi M4IN>2402 FT.<205.7 FT.AUXILLIARY

>257.7 FT,<250$FT.OTHER PLANT CONDITIONS EXIST THAT V4RRANT INCRE4SED AVARENESS OH THE PART QF THE PLANT OPER*TING STAFF, CHAT>II>6 HARNETT, LEF AND VAKE COUNTIES AMD TFK STATE OF HQRTH CAROLINA I)!X<PLANNED ECCS DISCHARGE TD VESSEL 2)INITIATIOH DF ANY SHUTDOVN REQUIRED DY TECHNICAL SPECIFICATIOHS 3>CONTAHINATED OR POTENTIALLY COtlTIHIHATED g INJNtED INDIVIDUAL REQIQR-ING OFFSITE tKDICAL TREATHENT 4>OTHER PLANT CONDITIQHS EXIST THAT INVOLVE OTHER THAN NORMAL CONTROLLED SFItTMVN (E,G, CQOLDOVN RATE EXCEEDING TECHNICAL SPECIFICATION LIMITS, PIPE CRACKING FOUND DURING IFERATION)

SHEARQN HARRIS NUCLEAR POWER PLANT UNIT¹I APPROVAL REVISION NO.DATE 4 RZ'a9y SIDE 2 SIGNATURE ittit PLANT GFN, MGR, SIDE 1 EAL TABLE 3 DOSE PROJECTION MONITORS CAROLINA PO'Yv'ER L LIGHT COMPANY SHEARON HARRIS NUCLEAR PDVER PLANT L CNMT Hl R4NGE ACCIDENT NONITDRS PPL4NT VENT STACK 01 VIDE RANGE GAS NONITQR EFFLUENT CHANNEL 3.MAIN STE4M LINE HONITORS 4, STACK 05 HONLTOR VIDE RANGE GAS HONITQR EFFLUENT CH4NNEL 5.STACK 0SA MONITOR VIDE RANGE GAS NONITOR EFFLUENT CHANNEL INDICATE CURRENT EAL GN EAL ST4TUS BOARD I'-I~TAt HMENT 1 EMERC)ENC.

ACTI N EVEi L Wpr'-I TH 4NY RAD MON ON EAL NQ TABLE 3 IN)QGH ALARH HALFUNCTIO RESULTING IN UNCONTRQL4BLE BORON DILUTIO NQ EHERGENCY DOSE PROJECTIONS QR ENVIROHENTAL MONITORING RESULTS 4VAILABLE YES PEP-101 REV,+SHEET 10 OF 10 YES ANY YELLav LIGH" ON TR14XIAL RESPONSE SPECTRUM ANNUNCIATOR LIT YES~NO Na PL4NT IN NODE 6 EMERGENCY DOSE PROJECTION RESULTS AVAtLABLE DILUTION EVENT LASTING>35 HI~Ms DILUTION EVENT L4STIHG)15 MIHs YES (PERFORH DOSE PROJECTION PER PEP 343 OR PEP-341 NV RED LIGHT ON TRIAXIAL RESPO)iSE SPECTRUM 4NHJHCIATOR PROJECTED DOSE RATE>I REM/HR (VB)AT EAB LIT ALERT E4L EXCEEDED YES ALERT E*L EXCEEDED SITE'EMERGENCY EALi EXCEEDED RE-EVALU4TE EALS AT ENTRY POINT Y VHEN DOSE PROJECTIONS COHPLETED SITE EHERGENCY EAL EXCEEDED PROJECTED DOSE R*TE>5 REN/HR CTHYROQl)4T EAB YES ANY R*DIOLOGICAL CONDITION V4RR4NTIHG RECOMMENDATION TO EVACU4TE QR SHEL1ER THE PUBLIC DECLARE GENERAL ENERGENCY ADVERSE VE4THER YES HO HAKE NOTIFIC*TIQHS EAL STATUS BIjARD DECL4RE GENERAL I YES GENERAL EMERGENCY SITE EMERGENCY ALERT UNUSUAL EVENT RE&VALUATE EALS AS CONDITIONS VARRAHT TORNADO HAS HIT ME POVER BLOCK s HAKE NOTIFICATIONS PROJECTED YES DOSE>I REH<VB)41 EAB RE-EvALUATE EaLS AS CONDITIONS VARRANT NI3 ANY PLANT CONDITION TH4T IN THE JUDGEHENT QF THE SHIFT FOREH4N OR SITE EMERGENCY COORDIN4TOR 4RRANTS 4 SITE EMERGENC DECLARaTtatt PROJECTED QR MEASURED SUST4INED%l VIND SPEED AT 10 METERS>90 HPH NO CONTINUING ACTIONi PROJECTED DOSE>5 REM (THYRIQD)AT E4$BEGANt REQUIRED DURATION (MIN)EXPIRESi CURRENT CLASSIFICATION RETURN TO ENTRY POINT YES NO Na SUST*INED V IND SPEEDS AT 10 HETERS>100 NPH SITE EHERGENCY E4L EXCEEDED USE 4DVERSE MET ASSUMPTION (CHI/Q.000617 SEC/H")FOR DETERNININ PROJECTED DI3SE RATES ALE'RT EAL EXCEEDED YES AONORNE RAD LEVELS INDIC4TE SEVERE YES DEGR4DATIOM IN R*DI04CTIVE M4TERI4L CONT((OL SITE EMERGENCY E4L EXCEEDED PROJECTED DOSE YES RATE>50 MREH/HR<VB>4T EAB HO MO AIRCR4F1 CRASH, MISSLE IMP4CT OR UMPL4NNED EXPLOSIO INSIDE POVER K 4NY PL4NT CONDITIO EXISTS TH4T IH THE JUDGEMENT QF THE SHIFT FQRMAN OR SITE EHERGENCY COORDINATOR VARRANTS 4N ALERT DECL)UV 1 PROJECTED DOSE R4TE>250 aREHIHR MYROID>AT EAB YES ESTIMATED DUR4TIQN OF YES RELEASE>30 tQNs NQ YES NO YES PLANT IN COLD SHUTDOVN NO H4$*SITE EHERG OR Na 4LERT BEEN EXCEEDED NO PRI3JECTED DOSE R4TE>250 MREM/HR<VB)AT EAll SAFETY RELATE EQUIP OR STRUCTURE 4FFECTED EV4LUATE AGAINST UNUSUAL EVENT MATRIX HO YES DECL4RE HIGHEST EMERGENCY ON E4L ST*TUS BOARD ALERT EAL EXCEEDED YES ANY UNUSUAL EVEHT NO CONDITION IDENTIF I NO EMERGENCY---.::-*g m m 8 SC ll ifR ii fftc RE-EVALUATE I.ALS PROJECTED NlSE YES RATE>2.5 REH/HR CTHYROLD)AT EA H4KE HOTIFIC*TIONS SITE EMERGENCY EAL EXCEEDED ESTIMATED DUR4TMN OF YES RELEASE>P.HINs RE-EVALUATE E4LS AS CONDITIONS V4RRANT SITE EHERGENCY EAL EXCEEDED HO CONTROL OR UNPLANNED RELEASE QF TOXIC OR FL*MM4BLE 04$INTO POVER OCK ENVIRONMENTAL HI3NITORING RESULTS AV AILallLE YES~REL1'ASE EHDAt40ERING PERSONNEL OR OPERAS/LITT OF ESF EQUIP AS CONDITIONS VARRANT RE"EVALUATE EALS AT ENTRY POINT Y VHEN ENVIRONMENT4L HONITORIN RESULTS AVAILABLE YES EAL DECLARATION YES TIME ME4$URED VHOLE BODY DOSE RATE>I R/HR AT EAB NO PL4NT IN COLD SHUTlDOVH NO EA TABLE 6 1-131 EQUIV CONC>136E-6 uct/cc 4T E4$YES RADIATIHN MDNITIjR TAIJ NUMBERS DECLARE GENERAL EMERGENCY 4LI.RT E4L EXCEEDED MONITOR DESCRIPTION INSTRUMENT TAG NO.REN-ILT-3502*-S4 RM-11 CHANNEL ERFIS POINT ID NO.ID NO.CNNT LEAK DETECTION HONITOR CNHT Hl RANGE ACCIDENT HQMITORS RLT3502$2G$303 SITE EMERGENCY EAL EXCEEDED M4KE HOTIFIC4TIQNS RCR3589A RCR35904 R4V3509H 2*X162 2 A X 163 IEX817 RM-1CR-3589-$

4 RM-ICR-3590-$

$PLANT VENT STACK 01 VIDE R4HGE GAS MONITOR EFFLUENT CHANNEL RM-214V-3509-1S*

RE-EVALUATE E4LS 4S CONDITIONS V4RRAHT TURBINE F4ILUR RESULTING IN CASING PENETRATIO TURBIHE t)UILDIMG$14CK 3A VIDE RAHGE G*$MONITOR EFFLUEN1 CHANNEL R N-1 TV-3536-1 REX827 RTV3536D MEASURED VHQLE Baav Dass YES RATE)50 aR/HR 4T EAB HAIN STEAM LINE MONITORS RM-LMS-3591-SB RM-IMS-3592-$

$RM-1MS-3593-SB 54X164 5AX165 54X166 RM$35914 RM$3592*RM$35934 TES ALLRT EAL EXCEEDED FUEL BRE4CH 4RE4 RADIATION HOHLTDRSi VOLUHE COHTROL T4t<K RM.CH4RGING PUHP 1A RQOH CHARGING PUMP IB ROOM CHARGING PUHP 1C ROOH RECYCLE EV4P.VLV.GAL.LETDQVN HX VALVE GAL HODER*TING HX VLV.GAL.RM-1RR-3595 RM-1RR-3599A RM-LRR-3599$

RH-IRR-3599C RH-IRR-3600 RH-LRR-3601 RM-1RR-3602 RRR359S*RRR3599A RRR35990 RRR3599C RRR36004 RRR36014 RRR3602*144056 LAA060 1**061 LAA062 1*A 063 IAA064 IAA06'5 HE4SURED 1-131 ECtUIV CONC YES 7.31E-Q VCt/cc AT EAB MEASURED LEVEL HAS EXISTED>30 MINs CONTROL ROOM EVAC REQUIRED OR ANTICIP4TED NO STACK 05 MONITOR VIDE RANGE GAS MONITOR EFFLUEHT CHANNEL RH-LVV-3546-1 4EX837 RVV3546D TES STACK 05A HQNITOR VIDE RANGE GAS MONITOR EFFLUENT CH4NNEL RN-1VV-3547-1 4EX847 RVV3547D HE4$URED VHOLE BODY DOSE YES RATE)500ttR/HR AT EAB*UX CONTROL P4NEL (4CP)OPER*TIONAL LICIUID EFFLUENT MONITDRS TRE4TED LAUNDRY I HOT SHOVER DISCHARGE NO 4EE667 RVL3540$REN-21 VL-3540 iYES REM-21VS-3542 SECDNDARY V4STE$4HPLE TA)0(DISCH4RGE 4EE687 RV$3542$NO CONTROL ROOM EV4CU4TED FOR>15 HINs RVL3541$L VASTE MONITOR TANK DISCHARGE 4EE677 REM-LVL-3541 ME4SURED 1-131 EQUIV CONC>7312-7 uCt/cc AT EAB ALERT EAL EXCEEDED YES SITE EHERGENCY EAL EXCEEDED HE4SURED LEVEL HAS EXISTED FOR>2 HINs NO POWER BLOCK INCLUDES CONTAINMENT AND THE FOLLOWING BUILDINGS REACTOR AUXILLIARY, TURBINE;FUEL HANDLING, WASTE PROCESSING, TANK AREA, DIESEL, DIESEL FUEL OIL STORAGE, K, FIRE HOUSEINTAKE STRUCTURES, AND DUCT BANKS SERVING THESE BUILDINGS, SITE EMERGENCY E4L EXCEEDED NO EAL TABLE 5 Ht3NITQR IN E4L T4$LE 5 READIH YES>10 TIHES THE HIGH 4LARH ET POINT EAL TABLE 4 SEISMIC EVENT SYMPTOMS EFFLUENT MONITORS 1.PLANT VENT STACK 01 VIDE RANGE G4S MONITOR EFFLUENT CHANNEL 5 TRE*TED L*UNDRY I, HOT SHOVER DISCHARGE l(ONITO 6.SECONDARY VASTE SAHPLE TAN<DISCHARGE MONITOR 7.VAS1E MONITOR TANK DISCHARGE HONITOR ALERT EAL EXCEEDED)1'SEIS)QC HON SYS OBE EXCEEDED'L4RM (ALB 10-4-4)AHD/OR'ALARM'IGHT ON THE SELSHIC SVITCH PANEL 2.TURBINE BUILDING STACK 03A VIDE R4NGE GAS MONITOR EFFLUEHT CHANNEL 2.VHITE EVENT INDIC410R ON SH4 CONTROL P4NEL.3.4LARM 4T TRIAXI*L RESPONSE SPECTRUM 4NNUNCIATOR.

4.NOTIC4$LE TREMORS OR VIBRATmt(3.STACK 05 VIDE RANGE GAS MONITOR EFFLUENT CHAHNEL 4, S1ACK 05A VQIE RANGE G4S MONITOR EFFLUENT CHANNEL AHY TVO INDIC4TIONS tIF 4 SEIS)QC EVENT LISTED ON EAL T4$LE 4 NO UNUSUI-')L LOSS QF RE*CTOR COOLANT LOSS OF METEOROLOGICAL DATA ERFLS OR CONMUHIC4TIONS CAP4BILI'TY SECURITY THREAT LOSS OF POVER NATURAL PHENOMEN4 AND OTHER PLaHT H4ZARDS FUEL DAMAGE INDLC4TION LOSS OF SECONDARY COQLAH1 OR COO(JNG FIRE SITE EMERGENCY COQRDIN*TOM JUDGEHENTS GASEOUS QR LIQUID EFFLUENT($

)EXCEEDING TECHNICAL SPECIFICATIONS OTHER EVENTS OR$PECIFIC LCas EXCEEDED l,t)LOSS OF ALL REPRESENT*TIVE METEOROLQGIC4L 04TA 2)tNABILITY OF ERFIS TO PERFORN ITS INTENDED FUNCTION FOR*CONTINUOUS PERIOD OF 4 HOURS VHILE IN NODES LP3, OR 4 AS DEFINED BYi A.F4ILURE OF BOTH CPU'S 8 FAILURE DF BOTH DAT4 CONCENTRATDRS C.F4ILURE OF BOTH DATA DISC D.INaBrt.tvv m DrspLav spas IM THE CONTROL RODH E.INABILITY TO UPD4TE CURRENT D4T*DISPLAYS IN THE Cal(TROL RQQH (THIS IS NOT Ta BE CONSTRUED*S A FAILURE OF 4 SINGLE VARlaBLE OR SHALL SUBSET OF D4TA 3)F4ILURE OF LRITH RITE TELEPHONE AND EMERGENCY TELEPHONE SVITCHES I)LOSS OF ALL OFFSITE POVER, OR 2)LOSS OF BOTH EHERGENCY DIESEL GENERATORS I)RAPID DEPRESSURIZA-TIOH OF SECOND4RY SIDE 2>M*IN S1EAM QR FEEDVATER BREAK 3)F4ILURE QF A SG SAFETY OR PORV TO FULLY RESET AFTER OPER4TION 4>SG BLQVDOVN LINE BREAK atODES L2, 0 3)I)F4ILURE OF*PRESSUR-IZER SAFETY QR RELIEF VALVE TO CLOSE FOL-LOVING REDUCTION OF APPLIC4$LE PRESSURE 2)LOSS OF REACTOR COOL-4NT OR PRIM4RY Ta SECONDARY SYSTEH'T LEAK4GE IN EXCESS OF TECHNICAL SPECIFIC*-

TIQN 3.4.6.2 FIRE LASTING HORE M4H 10 MINUTES VITHIN THE PROTECTED AREA A SECURITY ALERT H4$SEEN DECL4RED AS DEFINED IH THE SECURITY PLAN I)IHDIC4TION OF ANY TVO VALID SEISMIC SYMPTOMS LISTED IN E*L T*BLE 4 2)HURRICANE OR TORNADO CROSSING EAB 3)41RCRAFT CRASH VITHIN E4B QR UNU-SU4L AIRCRAFT ACTI-VITY OVER FACILITY 4)TRAIN DER41LMENT VITHIN E4B 5)UNPL4NNED EXPLOSION VITHIN EAB 6)UNPLANNED TOXIC OR FLAMMABLE GAS RE-LEASE GREATER THAN 10 POUNDS VITHIN EAD 7)TURBINE ROTATING CQHPONENT FAILURE RESULTING IH*REACTDR TRIP 8)VATER LEVELS IN THE MAIN 4ND AUXIL14RY RESERVOLRsi MAIN)2402 FT.<205,7 I'.AUXLLLIARY

)257,7 FT.OTHER PL4NT CONDITIONS EXIST THAT VARRANT INCREASED 4VAREHESS ON THE PART DF THE PLANT OPER*TING STAF'F, CHATHAH, HARNETT, LEE, AND VAKE COUNTIES AND T>$: STATE OF NORTH CAROLIN4 I)GROSS F4ILED FUEL DETEC10R INDIC4TES AN INCRE4SE GRE4TER THAM 2E4 CPH VITHIN 30 I)UNPLANNED ECCS DISCHARGE Ta VESSEL 2)IMITI41IOH OF 4HY SHUTDOVH C REQUIRED BY TECHNICAL ff'PECIFICATIONS 3>CONTA)ORATED OR POTENTIALLY COMT4HINATED g INJURED INDIVIDUAL REQUIR-IHG QFFSITE HEDLCAL TREATHEHT 4>OTHER PLANT CONDITIOHS EXIST THAT INVOLVE, OTHER THAN NORMAL CONTROLLED S)6)TDQVN (E.G, COOLDOVN RATE EXCEEDING TECHNICAL SPECIFIC*TION LIHITS, PIPE CRACKING Ft3UHD DURING CPERATIOH)

L VALQI HIGH ALARM ON ANY 7 OF THE HQNITORS IN EAL T4$LE 5 4ND ME RELE4SE HAS NOT SEEN TERMINATED HINUTES 2)RCS SPECIFIC ACTIVITY+EXCEEDS TECHNICAL SPECIFICATION 3.431<2SOll FT.L.VE NT M('-3TRLX