ML20264C907
From kanterella
Jump to navigation
Jump to search
ML20264C907 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 05/10/1983 |
From: | EBASCO SERVICES, INC. |
To: | CAROLINA POWER & LIGHT CO. |
Shared Package | |
ML18018B719 | List: |
References | |
SK-668S17, NUDOCS 8407190402 | |
Download: ML20264C907 (1) | |
Similar Documents at Harris | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20264C9261983-05-10010 May 1983
[Table view]Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 190,Unit 1. Actual Drawing NUMBER:CAR-SH SK-668S06 ML20264C9281983-05-10010 May 1983 Emergency Service Wtr - Intake Str (Main Reservoir):Safe Shutdown Analysis in Case of Fire,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S27 ML20264C9011983-05-10010 May 1983 Containment Buildings:Safe Shutdown Analysis in Case of Fire El 236 Ft,Unit 1. Actual Drawing NUMBER:CAR-SH SK-668S02 ML20264C9021983-05-10010 May 1983 Containment Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Actual Drawing NUMBER:CAR-SH SK-668S03 ML20264C9041983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 305 Ft,Unit 1. Sheet 1. Acutal Drawing NUMBER:CAR-SH SK-668S20 ML20264C9051983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286 Ft,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-66S18 ML20264C9071983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S17 ML20264C9091983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286 & El 305,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S16 ML20264C9111983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 4. Actual Drawing NUMBER:CAR-SH SK-668S15 ML20264C9151983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S13 ML20264C9161983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S12 ML20264C9181983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 336,Unit 1. Sheet 4. Actual Drawing NUMBER:CAR-SH SK-668S11 ML20264C9201983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-668S10 ML20264C9211983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S09 ML20264C9231983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S08 ML20264C9241983-05-10010 May 1983 Rector Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 216 Ft,Unit 1. Actual Drawing NUMBER:CAR-SH SK-668S07 ML20264C9131983-05-10010 May 1983 Reactor Auxiliary Buildings:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-668S14 ML20262K8681981-05-0101 May 1981 Marked-up General Arrangement:Fuel Handling Building Plans - Units 1,2,3 & 4. Sheet 1 ML20262K8701981-05-0101 May 1981 Marked-up General Arrangement:Fuel Handling Building Plans - Units 1,2,3 & 4. Sheet 2 ML20262K8631980-12-23023 December 1980 Marked-up General Arrangement:Reactor Auxiliary Building Plan El 261.00 Ft,Unit 1 ML20262K8651980-12-23023 December 1980 Marked-up General Arrangement:Reactor Auxiliary Building Plan El 286.00 Ft,Unit 1 ML20262K8601980-12-23023 December 1980 Marked-up General Arrangement:Reactor Auxiliary Building Plan El 236.00 Ft,Unit 1 ML20262K9031980-07-15015 July 1980 Marked-up Containment Bldg Equip Rml Str Crane Clearance Diag,Units 1 & 2 ML20262K8401980-04-0909 April 1980 Marked-up General Arrangement:Turbine Building Ground Floor Plan,Unit 1 ML20262K8571980-03-18018 March 1980 Marked-up General Arrangement:Containment Building Sections,Unit 1. Sheet 1 ML20262K8501980-03-18018 March 1980 Marked-up General Arrangement:Containment Building Plan El 261.00 Ft & 286.00 Ft,Unit 1 ML20262K8451980-03-18018 March 1980 Marked-up General Arrangement:Containment Building Plan El 221.00 Ft & 236.00 Ft,Unit 1 ML20262K8331980-03-10010 March 1980 Marked-up Plot Plan,Units 1,2,3 & 4 ML20262K8771980-03-0606 March 1980 Marked-up Diesel Generator Building Crane Clearance Diag, Units 1,2,3 & 4 ML20262K9081979-06-26026 June 1979 Containment Building - Unit 1 Crane Clearance Diagram ML20262K9101979-06-18018 June 1979 Marked-up Turbine Building,Units 1 & 2 Crane Clearance Diagram ML20262K8881979-02-28028 February 1979 Marked-up Fuel Handling Bldg Cask Crane Clearance Diagram ML20262K9001979-02-28028 February 1979 Marked-up Fuel Handling Bldg Aux Crane Clearance Diag. Actual Drawing Number CAR-2168 B-130-S05 ML20262K8761978-10-12012 October 1978 Marked-up Containment Building Equipment Laydown Area,Units 1 & 2 1983-05-10 Category:DRAWINGS MONTHYEARML18016A9531999-03-0505 March 1999
[Table view]Fuel Handling Building Piping Spent Fuel Pool Cooling System Component Cooling Water Return.Actual Drawing Number: 5-G-0412. 5-G-0127 ML18016A9541999-03-0505 March 1999 Fuel Handling Building Piping Spent Fuel Pool Cooling System Component Cooling Water Supply.Actual Drawing number:5-G-0127.5-G-0412 ML18016A9521999-03-0505 March 1999 Fuel Handling Building Piping Spent Fuel Pool Cooling System Component Cooling Water Misc Details. Actual Drawing number:5-G-0412.5-G-0127 ML18016A9561999-03-0505 March 1999 Fuel Handling Building Piping Component Cooling Water System Fuel Pool Ht Exchgr Drains.Actual Drawing Number: S-CC-005 ML18016A6311998-09-28028 September 1998 Illegible Rev Date.Miscellaneous Drainage Piping Reactor Auxiliary Building Unit 1 ML18016A6381998-09-28028 September 1998 Illegible Rev Date.Service 8 Cooling Water Piping Containment Building Plan Unit 1 ML18016A6351997-12-0101 December 1997 Sampling Systems Cont.Bldg & R.A.B. Instr.Location Arrg'T Unit NO.1 EL236'-0 & 261'-0.Actual Drawing Number: CAR-2166 G-551S01 ML18016A6301996-03-19019 March 1996 Miscellaneous Piping Containment Building Sheet 1 Unit 1. Actual Drawing number:CAR-2165 G-180S01 ML18016A6331995-03-31031 March 1995 RHR 8 Safety Injection Piping Reactor Auxiliary Building Plan El 236.00 Unit 1 ML18012A5031993-10-0606 October 1993 Flow Diagram Diesel Fuel Oil System Unit 1 ML18016A6371993-07-29029 July 1993 Reactor Auxiliary Building Misc 2 and Under Non Seismic Piping Unit 1.Actual Drawing number:CAR-2165 G-125S01 ML18016A6361993-07-13013 July 1993 Miscellaneous Piping Containment Building Sheet 2 Unit 1. Actual Drawing number:CAR-2165 G-180S02 ML18012A5021993-03-30030 March 1993 Flow Diagram Diesel Generator Systems ML18010A9831992-12-22022 December 1992 Emergency Action Level Flow Path.Side 1.Attachment 1.Sheet 9 of 10 ML18010A9851992-12-22022 December 1992 Emergency Action Level Flow Path.Side 2.Attachment 2.Sheet 10 of 10 ML18016A6391992-11-10010 November 1992 Service 8 Cooling Water Piping Reactor Auxiliary Building Plans Unit 1 ML18010A8651992-10-12012 October 1992 Min Flow Orifice Ass'Y ML18022A9071992-10-12012 October 1992 Chem & Vol Control ISO Revisions.Sheet 1 of 1 ML18010A8641992-10-12012 October 1992 Si/Charging Pumps Mini Flow Recirc Strainer.Sheet 1 of 1 ML18010A8611992-10-0909 October 1992 Reactor Aux Bldg CS Piping from Anchor 293 to Anchor 7421 Stress Isometric.Sheet 1 of 1 ML18010A8591992-10-0909 October 1992 Reactor Aux Bldg - Unit 1 CS Piping Stress Isometric.Sheet 1 of 1 ML18010A8901991-09-16016 September 1991 Carolina Power & Light Shearon Harris Nuclear Plant 1,2,3 & 4 Reactor Coolant Pressure Process Control Block Diagram. Sheet 29 ML18009A7321990-08-0303 August 1990 Emergency Action Level Flowpath. Sheet 9 of 10 ML18010A4941990-08-0303 August 1990 Emergency Action Level Flowpath.Sheet 10 of 10 ML18022A7521990-01-0505 January 1990 Emergency Action Level Flowpath. Sheet 10 of 10.No Rev Date ML18022A7501990-01-0505 January 1990 Emergency Action Level Flowpath. Sheet 9 of 10.No Rev Date ML18016A6341989-10-0101 October 1989 Sampling System Containment Building Instr Location Arrg'T Unit NO.1 Partial Plan EL.236'-0 Plan El 261'-0. Actual Drawing number:CAR-2166 G-551S02 ML18022A7291988-11-0303 November 1988 Emergency Action Level Flowpath. Sheet 9 of 10 ML18005B0581988-11-0303 November 1988 Emergency Action Level Flowpath. Sheet 10 of 10 ML18005B0561988-11-0303 November 1988 Emergency Action Level Flowpath. Sheet 9 of 10 ML18005A5871988-09-0808 September 1988 Emergency Action Level Flowpath. No Rev Date ML18016A6281986-09-0505 September 1986 Waste Processing Piping Containment Building Partial Plans 8 Sections Unit 1 ML18004A3881986-05-0606 May 1986 Simplified Flow Diagram:Chemical & Volume Control System. Sheet 4 ML18016A6321986-04-30030 April 1986 RHR 8 Safety Injection Piping Containment Building Plan Sheet 1 Unit 1 ML18019A5901986-02-14014 February 1986 Emergency Action Level Network. Sheet 9 of 12.No Rev Date ML18019A3081985-07-26026 July 1985 Emergency Action Level Network. Page 8a of 15 ML18018B7881984-06-28028 June 1984 Door Schedule Special Doors,Watertight Wire Mesh & Metal Partition, as-built ML18016A6291984-04-23023 April 1984 Miscellaneous Piping Mechanical Penetration Area Reactor Auxiliary Building Unit 1 ML18018B7891984-02-21021 February 1984 Fuel Handling Bldg Misc Steel Unit 1 & 2. Sheet 2 ML20264C9091983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286 & El 305,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S16 ML20264C9071983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S17 ML20264C9041983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 305 Ft,Unit 1. Sheet 1. Acutal Drawing NUMBER:CAR-SH SK-668S20 ML20264C9231983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S08 ML20264C9201983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 236,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-668S10 ML20264C9161983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S12 ML20264C9281983-05-10010 May 1983 Emergency Service Wtr - Intake Str (Main Reservoir):Safe Shutdown Analysis in Case of Fire,Unit 1. Sheet 1. Actual Drawing NUMBER:CAR-SH SK-668S27 ML20264C9051983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 286 Ft,Unit 1. Sheet 3. Actual Drawing NUMBER:CAR-SH SK-66S18 ML20264C9151983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Sheet 2. Actual Drawing NUMBER:CAR-SH SK-668S13 ML20264C9181983-05-10010 May 1983 Reactor Auxiliary Building:Safe Shutdown Analysis in Case of Fire El 336,Unit 1. Sheet 4. Actual Drawing NUMBER:CAR-SH SK-668S11 ML20264C9021983-05-10010 May 1983 Containment Building:Safe Shutdown Analysis in Case of Fire El 261 Ft,Unit 1. Actual Drawing NUMBER:CAR-SH SK-668S03 1999-03-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20264C907&oldid=3123673"