05000530/FIN-2018002-03
Jump to navigation
Jump to search
Site: | Palo Verde |
---|---|
Report | IR 05000530/2018002 Section 4OA2 |
Date counted | Jun 30, 2018 (2018Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | C Peabody D Reinert D You W Sifre L Carson W Cullum J Melfi C Scott N O'Keefe |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |