| Title | Reactor Trip due to Pressurizer Spray Valve Failing Open due to Volume Booster Internals Not Environmentally Qualified for Anticipated Ambient Operating Temperatures |
| Description | The inspectors reviewed a self-revealed, Green, non-cited violation of Technical Specification 5.4.1.a Procedures, for the licensees failure to follow station procedure 73DP-0EE05, Engineering Preventive Maintenance Program. The licensee did not consult design basis resources and operating experience when changing the preventive maintenance frequency of the pressurizer spray valve air-operated volume boosters. The valve internals were not rated for ambient operating temperature conditions, as a result a pressurizer spray valve failed open, requiring operators to trip the reactor. The licensee entered this condition into their corrective action program as Condition Report 16-14219. The licensees corrective actions included replacing the affected pneumatic volume boosters with high temperature qualified soft parts and by revising procedure 73DP-0EE05 to ensure a more thorough engineering management oversight of the equipment reliability engineering template process. The inspectors determined that the failure to follow station procedure 73DP-0EE05, Engineering Preventive Maintenance Program, Revision 6, Step 3.4.7, to consult design basis information including internal operating experience resources when determining a required preventive maintenance frequency is a performance deficiency. The performance deficiency is more than minor, and therefore a finding, because it was associated with the design control attribute of the Initiating Events Cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, the pressurizer spray valve failed open requiring the operators to trip the reactor. The inspectors evaluated the significance of the issue under the Significance Determination Process, as defined in Inspection Manual Chapter 0609.04, Initial Characterization of Findings, and Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the finding was of very low safety significance (Green) because the finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition. Specifically after the reactor trip, control room operators were able to regain pressure control by securing the reactor coolant pumps driving pressurizer spray, and initiating auxiliary spray through the charging system. The inspectors determined this finding had a cross-cutting aspect in the area of human performance, consistent process, in that the licensee failed to use a systematic approach to make decisions including incorporating risk insights. Specifically, the pressurizer spray valves are designated as critical components and single point vulnerabilities in 73DP-0EE05, which requires a technical basis to allow for a preventive maintenance frequency change. The licensee did not document the technical basis to increase the service life from one to four cycles [H.13]. |
| Site: | Palo Verde |
|---|---|
| Report | IR 05000530/2017003 Section 4OA3 |
| Date counted | Sep 30, 2017 (2017Q3) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | C Peabody D Reinert D You G Miller |
| Violation of: | Technical Specification |
| CCA | H.13, Consistent Process |
| INPO aspect | DM.1 |
| ' | |