ML081060297

From kanterella
Revision as of 07:54, 30 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Columbia Generating Station - License Page 3 and Technical Specification Page 10 for Amendment No. 206 Eliminate Condition 2.F
ML081060297
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/15/2008
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Lyon, C F, NRR/DLPM, 415-2296
Shared Package
ML080800388 List:
References
TAC MD7278
Download: ML081060297 (2)


Text

(3) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material

as sealed neutron sources for reactor startup, sealed sources for reactor

instrumentation and radiation monitoring equipment calibration, and as

fission detectors in amounts as required; (4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source of special nuclear

material without restriction to chemical or physical form, for sample

analysis or instrument calibration or associated with radioactive

apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be

produced by the operation of the facility. (6) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to store byproduct, source and special nuclear materials not intended for use at Columbia

Generating Station. The materials shall be no more than 9 sealed

neutron radiation sources designed for insertion into pressurized water

reactors and no more than 40 sealed beta radiation sources designed for

use in area radiation monitors. The total inventory shall not exceed 24

microcuries of strontium-90, 20 microcuries of uranium-235, 30 curies of

plutonium-238, and 3 curies of americium-241. C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to

all applicable provisions of the Act and to the rules, regulations, and orders of the

Commission now or hereafter in effect; and is subject to the additional conditions

specified or incorporated below: (1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power (3486 megawatts thermal). Items in shall be completed as specified. Attachment 1 is hereby

incorporated into this license. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 206 and the Environmental Protection Plan contained in

Appendix B, are hereby incorporated in the license. The licensee shall

operate the facility in accordance with the Technical Specifications and

the Environmental Protection Plan. a. For Surveillance Requirements (SRs) not previously performed by existing SRs or other plant tests, the requirement will be

considered met on the implementation date and the next required

test will be at the interval specified in the Technical Specifications

as revised in Amendment No. 149.

Amendment No. 206 206