Pages that link to "05000302/LER-1979-001"
Jump to navigation
Jump to search
The following pages link to 05000302/LER-1979-001:
Displayed 50 items.
- 05000302/LER-1982-074, Forwards LER 82-074/03L-0 (← links)
- 05000302/LER-1982-071, Forwards LER 82-071/03L-0 (← links)
- 05000302/LER-1982-070, Forwards LER 82-070/03L-0.Detailed Event Analysis Encl (← links)
- 05000302/LER-1982-072, Forwards LER 82-072/03L-0 (← links)
- 05000302/LER-1982-073, Forwards LER 82-073/04T-0 (← links)
- 05000302/LER-1983-013, Forwards LER 83-013/03L-0 (← links)
- 05000302/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000302/LER-1983-015, Forwards LER 83-015/03L-0 (← links)
- 05000302/LER-1983-014, Forwards LER 83-014/03L-0 (← links)
- 05000302/LER-1982-058, Forwards LER 82-058/01T-0 (← links)
- 05000302/LER-1983-007, Forwards LER 83-007/03L-0 (← links)
- 05000302/LER-1983-008, Forwards LER 83-008/03L-0 (← links)
- 05000302/LER-1982-004, Forwards LER 82-004/01T-0 (← links)
- 05000302/LER-1982-003, Forwards LER 82-003/01T-0 (← links)
- 05000302/LER-1981-026, Forwards LER 81-026/03L-1 (← links)
- 05000302/LER-1981-073, Forwards LER 81-073/03L-0 (← links)
- 05000302/LER-1981-074, Forwards LER 81-074/03L-0.Detailed Event Analysis Encl (← links)
- 05000302/LER-1983-006, Forwards LER 83-006/03L-0 (← links)
- 05000302/LER-1990-015, Provides Info on LER 90-015 Re Decay Heat Valve Encls as- Built Not Matching FSAR Description as Revised in June 1990. FSAR Being Revised to Reflect Correct Description of Encls (← links)
- 05000302/LER-1982-069, Forwards LER 82-069/03L-0 (← links)
- 05000302/LER-1982-067, Forwards LER 82-067/03L-0 (← links)
- 05000302/LER-1982-068, Forwards LER 82-068/03L-0 (← links)
- 05000302/LER-1982-065, Forwards LER 82-065/03L-0 (← links)
- 05000302/LER-1982-066, Forwards LER 82-066/03L-0 (← links)
- 05000302/LER-1982-064, Forwards LER 82-064/01T-0 (← links)
- 05000302/LER-1981-031, Updated LER 81-031/01T-1:on 810624,Henry Pratt Co Notified That Containment Purge Valves AHV-1A,1B,1C & 1D Could Fail During Loca.Cause Unknown.Valves Modified on 810701.Mods Resolved 10CFR100 Dose Rate Excess Identified on 821 (← links)
- 05000302/LER-1982-060, Forwards LER 82-060/03L-0 (← links)
- 05000302/LER-1982-062, Forwards LER 82-062/01T-0 (← links)
- 05000302/LER-1983-058, Updated LER 83-058/03L-1:on 831103,while Performing Maint on 120-volt Ac Vital Bus Transfer Switch,Fuse Blew,Rendering Inverter 3A Inoperable.Caused by Personnel Inadvertently Shorting Out Lamp Base.Inverter repaired.W/840106 L (← links)
- 05000302/LER-1983-053, Updated LER 83-053/03L-1:on 831109,safety-related Hydraulic Snubber MSH-252 Declared Inoperable When Lack of Oil Level Indication Noted in Sightglass.Caused by Loose jam-nut on Stationary End of Snubber,Allowing rotation.W/8401 (← links)
- 05000302/LER-1983-023, Updated LER 83-023/01T-1:on 830613,fire Damper Discovered Missing.Approx 55 Addl Dampers & Chase Connecting Control Complex 108 & 165 Ft Elevations Degraded Due to Incorrect Fire Rating.Caused by Personnel Error (← links)
- 05000302/LER-1995-007, Forwards LER 95-007 Re Delay in Performance of Surveillance Resulting in Violation of TSs (← links)
- 05000302/LER-1983-003, Forwards LER 83-003/03L-0 (← links)
- 05000302/LER-1982-077, Forwards LER 82-077/03L-0 (← links)
- 05000302/LER-1983-001, Forwards LER 83-001/01T-0 (← links)
- 05000302/LER-1982-076, Forwards LER 82-076/03L-0 (← links)
- 05000302/LER-1983-039, Informs That Engineering Investigation of 12 Process Instruments Discovered Out of Calibr During Surveillance Testing & Reported in LER 83-039 Nearing Completion.Next Rept Expected by 840127 (← links)
- 05000302/LER-1983-045, Rev 1 to LER 83-045/03X-1:on 831016,1104 & 08,175-ft Wind Speed Instrumentation & on 831028 & 1102,33-ft Wind Direction Instrumentation Discovered Inoperable.Caused by Severe Weather Damage & Component Failure (← links)
- 05000302/LER-1995-004, Forwards LER 95-004-00,per 10CFR50.73.FPC Also Providing Related Correspondence (3F0495-10) in Parallel.C/A Closely Related,But Correspondence (3F0495-10) Deals More Directly W/Plans to Change TS (← links)
- 05000302/LER-1995-001, Forwards LER 95-001-00.LER Delayed Due to Util Evaluation of Design/Licensing Basis of Habitability Envelope (← links)
- 05000302/LER-1983-017, Forwards LER 83-017/01T-0.Detailed Event Analysis Encl (← links)
- 05000302/LER-1983-005, Forwards LER 83-005/03L-0 (← links)
- 05000302/LER-1983-031, Supplementary LER 83-031/03L-1:on 830725,containment Isolation Valve CAV-6 & -7 Would Not Close Under Sys Pressure of 1,000 Psi.Caused by Insufficient Design &/Or Inadequate Maint Procedures (← links)
- 05000302/LER-1983-018, Updated LER 83-018/01T-1:on 830413,preliminary Repts Received from B&W Indicated 51 of 120 Upper Core Barrel Bolts W/Ultrasonic Flaw Indications.Caused by Intergranular Stress Corrosion Cracking.Bolts Replaced (← links)
- 05000302/LER-1983-019, Forwards LER 83-019/03L-0 (← links)
- 05000302/LER-1995-014, Forwards LER 95-014-01.Suppl Provides Recision of 10CFR50.72 on H non-emergency Rept Associated W/Condition,Conversion of LER to Voluntary Ler,As Well as Rev of Cause & Corrective Actions (← links)
- 05000302/LER-1993-002, Forwards LER 93-002,Suppl 2,providing Revised Corrective Actions Completion Date for Work Re New Trenches & Cables (← links)
- 05000302/LER-1984-001, Updated LER 84-001-01:on 840113,end Cap on Reactor Bldg Side of Spare Penetration 3531 Mistakenly Cut Off.Caused by Personnel Failure to Follow Applicable Engineering Procedures.Personnel Retrained (← links)
- 05000302/LER-1996-012, Forwards Suppl to LER 96-012-01 to Reflect Decision by FPC to Increase Total Number of Battery Chargers Tested by Mfg by One Addl Battery Charger (← links)
- 05000302/LER-1983-011, Forwards LER 83-011/03L-0 (← links)