Pages that link to "CPSES-200700606, Decommissioning Report"
Jump to navigation
Jump to search
The following pages link to CPSES-200700606, Decommissioning Report:
Displayed 50 items.
- CPSES-200700422, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports (← links)
- CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval) (← links)
- CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating. (← links)
- CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program. (← links)
- CPSES-200602341, License Amendment Request (LAR) 06-006, Revision to Technical Specification (TS) 5.5.8, Inservice Testing Program (← links)
- CPSES-200700401, Supplement to License Amendment Request (LAR) 06-011 to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (← links)
- CPSES-200700391, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds (← links)
- CPSES-200700346, Guarantees of Payment of Deferred Premiums, Submits Form 10-Q for the Period Ending September 30, 2006 (← links)
- CPSES-200700229, Comanche, Response to Request for Additional Information, Relief Request B-6 for the Unit 1 Inservice Inspection (ISI) Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date.. (← links)
- CPSES-200700147, Response to Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (← links)
- CPSES-200700169, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds (← links)
- CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) (← links)
- CPSES-200700146, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits (← links)
- CPSES-200700130, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators (← links)
- CPSES-200602162, Transmittal of Report on Txu Power Sponsored Coatings Letter (← links)
- CPSES-200700099, Annual Report of Changes in Peak Cladding Temperature (← links)
- CPSES-200602475, Response to Request for Additional Information Related to License Amendment Request 05-08, Revision to Technical Specifications for Nominal Trip Setpoints and Allowable Value Setpoints for SG Water Level Low-Low and High-High (← links)
- CPSES-200602416, Updated Response to Requested Information Part 2 of NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. (← links)
- CPSES-200602392, License Amendment Request 05-005, Supplement 1, Additional Information Regarding Revision to FSAR Chapters 1, 6, & 15, New Methods & Assumptions for Evaluating Radiological Consequences. (← links)
- CPSES-200602332, Planned Licensing Actions for Accident Analysis Methodologies and Power Uprate (← links)
- CPSES-200602072, Response to Request for Additional Information, 2RF08 Steam Generator Tube Inservice Inspection Report (← links)
- CPSES-200602078, License Amendment Request (LAR) 06-007, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Offsite Circuits (← links)
- CPSES-200602137, Submittal of Unit 2, Cycle 10 Core Operating Limits Report (← links)
- CPSES-200601634, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators (← links)
- CPSES-200601983, Relief Request B-6 to Unit 1 Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval) (← links)
- CPSES-200601971, Submittal of Additional Information Related to License Amendment Request 05-007, Revision to Technical Specification 5.6.6 Regarding Pressure and Temperature Limits Report (← links)
- CPSES-200601944, Operator Licensing Examination Data (← links)
- CPSES-200601951, Supplement to License Amendment Request (LAR) 05-010 and Response to Request for Information (← links)
- CPSES-200601897, License Amendment Request (LAR) 05-005, Revision to Technical Specification 3.7.10, Control Room Emergency Filtration/Pressurization System (Crefs). (← links)
- CPSES-200601880, Response to RAI Relief Request A-1 for the Unit 2 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds. (← links)
- CPSES-200601797, Response to Request for Additional Information Related to License Amendment Request 05-08, Revision to Technical Specification for Nominal Trip Setpoints and Allowable Value Setpoints for SG Water Level Low-Low and High-High (← links)
- CPSES-200601660, Withdrawal of Relief Request A-6 to the Unit 1 Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI Through 2000 Addenda (Interval Start Date August 13, 2000, Second Interval) (← links)
- CPSES-200601743, Supplement to License Amendment Request (LAR) 05-010 and Response to Request for Information (← links)
- CPSES-200601738, Transmittal of First-Half 2006 Fitness-For-Duty Program Performance Data (← links)
- CPSES-200601734, Response to Request for Additional Information Related to License Amendment Request 05-007, Revision to Technical Specification 5.6.6 Regarding Pressure and Temperature Limits Report (← links)
- CPSES-200601676, Revised Response to Request for Additional Information, Relief Request A-1 for Unit 2 Inservice Inspection for Application of Alternative to ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 & 2 Pip (← links)
- CPSES-200600154, Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 2 (← links)
- CPSES-200601335, Groundwater Protection - Data Collection Questionnaire (← links)
- CPSES-200601350, Response to Request for Additional Information Related to Txu Power'S Request for Review of Previously Submitted Topical Reports (← links)
- CPSES-200601296, Response to RAI, Relief Request A-1 for the Unit 2 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds.. (← links)
- CPSES-200601299, Supplement to Relief Request P-1 to the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) (← links)
- CPSES-200601160, Revised Response to the 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. (← links)
- CPSES-200601177, Supplement to License Amendment Request (LAR) 05-010 Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System. (← links)
- CPSES-200601101, Relaxation Request for NRC Issuance of First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors (← links)
- CPSES-200601155, Response to Request for Additional Information Re 2005 Steam Generator Tube Inspections (← links)
- CPSES-200601056, Response to Request for Additional Information Related to License Amendment Request (LAR) 2004-010 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (← links)
- CPSES-200601043, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations (← links)
- CPSES-200601004, Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Power (← links)
- CPSES-200600994, Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval) (← links)
- CPSES-200600904, Submittal of the Annual Non-Radiological Environmental Operating Report for 2005 (← links)