Pages that link to "CNL-21-095, Submittal of Application to Revise Sequoyah Nuclear Plant, Units 1 and 2, 10 CFR 50.90 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Software Dedication Report 16-01 - Update ."
Jump to navigation
Jump to search
The following pages link to CNL-21-095, Submittal of Application to Revise Sequoyah Nuclear Plant, Units 1 and 2, 10 CFR 50.90 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis - Software Dedication Report 16-01 - Update .:
Displayed 50 items.
- CNL-15-059, Response to NRC Request for Additional Information Regarding the Review Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink, Including Enclosures 1 and 2, Pp. 1 Through 206 (← links)
- CNL-17-011, Submittal Letter for Revision 15 to the Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program (← links)
- CNL-15-095, Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule for License Renewal (← links)
- CNL-15-020, Supplement to the Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) and Response to NRC Requests for Additional Information (← links)
- CNL-15-042, Flood Hazard Reevaluation Report for Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review. (← links)
- CNL-15-038, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- CNL-15-037, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- CNL-14-229, American Society of Mechanical Engineers Request for Relief RP-07 (← links)
- CNL-14-211, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima. (← links)
- CNL-14-231, Notification of Intent to Use Code Case N-716-1 (← links)
- CNL-14-221, Response to NRC Request for Additional Information Regarding Review of License Renewal Application, Set 23, B.1.34-9.d (Follow Up) (← links)
- CNL-14-176, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (← links)
- CNL-14-133, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)(TAC Nos.. (← links)
- CNL-14-094, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, 2.5-4, 3.0.3-1-3 Request 4c, and B.1.13-4a (← links)
- CNL-14-114, Resolution of Generic Safety Issue (GSI)-191 (← links)
- CNL-14-102, Resolution of Generic Safety Issue (GSI)-191 - Commitment Change (← links)
- CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 3 (← links)
- CNL-14-033, Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- CNL-14-021, Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482) (← links)
- CNL-14-024, Transmittal of Corrected Figure for Application to Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (SQN-TS-12-02) (← links)
- CNL-14-018, Response to NRC Request for Additional Information Re Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) Tac Nos MF2446... (← links)
- CNL-14-013, Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding... (← links)
- CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1.. (← links)
- CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report (← links)
- CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a) (← links)
- CNL-13-104, Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87) (← links)
- CNL-19-016, Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report (← links)
- CNL-19-002, Response to Request for Additional Information Regarding Application to Modify Sequoyah Nuclear Plant Units 1 and 2, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures,. (← links)
- CNL-19-005, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SQN-TS-19-01) (← links)
- CNL-15-218, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03) (TAC Nos. MF5366 and MF5367), Supplement to Response to Request for Additional Information (← links)
- CNL-15-188, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Correction to ITS 3.3.7, Control Room Emergency Ventilation System (CREVS) Actuation Instrumentation. (← links)
- CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions (← links)
- CNL-18-103, Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041,. (← links)
- CNL-14-234, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 1 (← links)
- CNL-19-012, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISI-1 (← links)
- CNL-17-057, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Inservice Inspection (ISI) Program, Third Ten Year Interval Request for Relief for 17-ISI-1 (← links)
- CNL-14-073, 151-1 and 13-151-2 Relief Request Interval Applicability Clarification (← links)
- CNL-19-057, Response to Request for Additional Information Regarding American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISl-1 (← links)
- CNL-19-072, Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable - Exigent Amendment (SQN-TS-2019-03) (← links)
- CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 (← links)
- CNL-19-116, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) (← links)
- CNL-19-119, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Unit 1 Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-19-05) (← links)
- CNL-19-066, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) (← links)
- EPID:L-2020-LLA-0004 (← links)
- CNL-20-026, Supplement to Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) (← links)
- CNL-19-061, Seismic Probabilistic Risk Assessment for Sequoyah Nuclear Plant, Units 1 and 2 - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task (← links)
- ML20054B553 (← links)
- CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System (← links)
- CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant (← links)
- CNL-14-029, Second Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant (← links)