Pages that link to "ML20116N131"
Jump to navigation
Jump to search
The following pages link to ML20116N131:
Displayed 43 items.
- ML20203M883 (← links)
- ML20207R870 (← links)
- ML20207N774 (← links)
- ML20207N513 (← links)
- ML20212Q798 (← links)
- ML20248C648 (← links)
- ML20248B234 (← links)
- ML20247E751 (← links)
- ML20247D055 (← links)
- ML20246P245 (← links)
- ML20246N038 (← links)
- ML20245G098 (← links)
- ML20236G838 (← links)
- ML20236A535 (← links)
- ML20236A120 (← links)
- ML20235Y461 (← links)
- ML20235Y387 (← links)
- ML20235Q795 (← links)
- ML20235A586 (← links)
- L-98-431, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl (← links)
- L-98-613, Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability (← links)
- ML20210Q490 (← links)
- NPL-99-0565, TS Change Request 201 to Licenses DPR-24 & DPR-27,revising Tech Specs 15.3.1.A.3,15.3.3..A & 15.3.3.C for Consistency (← links)
- NPL-98-0431, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS to Provide Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses.Rev 1 to Calculation 9334281-01 Re RCP Internal Voltage Decay,Encl (← links)
- NPL-98-0303, TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles (← links)
- NPL-98-0613, Application for Amends to Licenses DPR-24 & DPR-27, Incorporating Changes to TSs to More Clearly Define Requirements for Svc Water Sys Operability (← links)
- NPL-99-0446, Application for Amends to Licenses DPR-24 & DPR-27,removing Word Plasma from TS 15.3.5 Re Discussion of Type of Display Monitor for sub-cooling Info in CR & Removing Discussion from TS 15.3.7 Re EDG Inoperability (← links)
- NPL-97-0484, TS Change Request 199,consisting of Application for Amends to Licenses DPR-24 & DPR-27,removing Requirement in TS to Perform Containment Integrated Leak Rate 60-months from Previous Test (← links)
- NPL-99-0405, Suppl 2 to TS Change Request 211,transmitting Text That Will Be Relocated to Pbnp FSAR with Respect to Manager Supervisory Staff Requirements.Suppl Provided Based on Comments Fromqa Branch of NRC (← links)
- NPL-99-0386, Application for Amends to Licenses DPR-24 & DPR-27, Respectively,Removing Ifba Enrichment Curve Methodology (← links)
- NPL-99-0206, TS Change Request 212 to Licenses DPR-24 & DPR-27,updating References in TS to Reflect Relocation of Referenced Info in UFSAR (← links)
- NPL-98-0146, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Sections 15.3.6, Containment Sys Bases, 15.3.12, CR Emergency Filtration Including bases,15.4.4, Containment Tests bases,15.4.11, CR Emergency... (← links)
- NPL-99-0057, Application for Amends to Licenses DPR-24 & DPR-27,revising TS 15.6 & 15.7 to Reflect Proposed Administrative Control Changes (← links)
- NPL-99-0369, Application for Amends to Licenses DPR-24 & DPR-27 to Reflect Required Changes to TS as Result of Using Upgraded Fuel at plant.Non-proprietary,WCAP-14788 & Proprietary WCAP- WCAP-14787 Repts Encl.Proprietary Rept Withheld (← links)
- NPL-99-0337, to TS Change Request 211,reflecting Administrative Changes in Sections 15.6 & 15.7 by Changing Titles,Increasing Min Operating Crew Shift Staffing & Deleting Duty & Call Superintendent Function (← links)
- NPL-98-0586, Application for Amends to Licenses DPR-24 & DPR-27,modifying TS Section 15.4.1 by Removing Requirement to Check Environ Monitors on Monthly Basis (← links)
- NPL-98-0766, Application for Amends to Licenses DPR-24 & DPR-27,revising TS to Ensure 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility (← links)
- NPL-98-0768, Application for Amends to Licenses DPR-24 & DPR-27,adding Notation Definition Contained in TS Table 15.4.1-1, Min Frequencies for Checks,Calibrations & Tests of Instrument Channels, Per NUREG-1431 (← links)
- NPL-98-0759, Tech Spec Change Request 209,amending Licenses DPR-24 & DPR-27,removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers).' (← links)
- NPL-97-0249, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 (← links)
- NPL-97-0166, Application for Amends to Licenses DPR-24 & DPR-27,changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President-Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c (← links)
- NPL-97-0167, Application for Amends to Licenses DPR-24 & DPR-27, Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP (← links)
- NPL-97-0315, Suppl to TS Change Request 192 to Licenses DPR-24 & DPR-27, Modifying TS Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 (← links)