Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML11046049815 February 2011Offsite Notification of a Dead Sea Turtle Recovery
ML11055001124 February 2011EPU - Request for Additional Information (I&C)Power change
ML11056027310 March 2011Request for Additional Information, Regarding License Amendment Request for Approval of Cyber Security PlanCyber Security
ML1105906639 March 2011Acceptance for Review of License Amendment Request for Extended Power Uprate
ML1106104277 March 2011Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold
ML11062008526 February 2011E-mail St. Luciie Logbook Entry for 2/26/2011
ML1106301304 March 2011Annual Assessment Letter For St. Lucie Nuclear Plant, Units 1 And 2 - (NRC Inspection Report Nos. 05000335/2011001 and 05000389/2011001)Condition Adverse to Quality
ML1106301414 March 2011Inspection/Activity Plan, Report 22
ML1106606533 March 2011Monthly Turtle Removal Summary for February 2011
ML1106606583 March 2011Marine Turtle Removals St. Lucie Plant Intake Canal February 2011
ML1106606603 March 2011Monthly Report Notes Regarding St. Lucie, Marine Turtle Removals
ML1106606613 March 2011FPL, St. Lucie Turtle Capture Summary February 2011
ML11067041128 February 2011St. Lucie, Units 1 and 2 - 2010 Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ML11067041528 February 2011St. Lucie, Units 1 and 2 - Annual Radioactive Effluent Release Report - January 1, 2010 Through December 31, 2010Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML1106800459 March 2011EPU - Request for Additional Information (Performance and Testing)
ML1106803739 March 2011EPU - Request for Additional Information (I & C)
ML11073011625 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate
ML11073028225 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 2; Supplemental Environmental ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
License Renewal
Environmental Justice
Power Uprate
ML11073028325 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 1; Description and Technical Justifications for the Renewed Facility Operating License Technical Specifications and Licensing Basis ChangesBoric Acid
Shutdown Margin
Stroke time
Fuel cladding
ML11073028425 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean PagesBoric Acid
Shutdown Margin
Packing leak
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Offsite Circuit
Power change
ML11073029825 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases MarkupsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Fuel cladding
Power change
ML11073029925 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Licensing Report
ML11073030025 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report ComplianceBoric Acid
Hydrostatic
Fuel cladding
ML11073030125 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B Additional Codes and Methods
ML11073030325 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5, Appendix C, Grid Stability Analysis and System Impact Study for St. Lucie Plant with Proposed EPU
ML11073030425 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key AcronymsEarthquake
ML11073030525 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems
ML11073030625 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix F, Camereron Ultrasonics Engineering Reports, Cover
ML11073030725 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU
ML11073031025 February 2011St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 7; Summary of Regulatory Commitments
ML1107304008 March 2011Operator Licensing Written Examination Approval 05000335/11-301 and 0500038911-301
ML11075040216 March 2011Notice of Public Meeting with St. Lucie Nuclear Plant to Discuss the NRC Reactor Oversight Process Annual Assessment
ML11077034922 March 20113/22/11 PRE-Application Meeting Slides Regarding NFPA 805 License Amendment RequestInternal Flooding
Multiple Spurious Operation
ML11080053618 March 2011Comment (7) of Larry Nicholson, on Behalf of Nextera Energy, on Draft Regulatory Issue Summary, Adequacy of Station Electric Distribution System Voltages.Safe Shutdown
Anticipated operational occurrence
ML11082069922 March 20113/22/11 Revised Pre-application Meeting Slides Regarding NFPA 805 License Amendment RequestInternal Flooding
Multiple Spurious Operation
ML11087134030 March 2011Request for Additional Information Regarding Relief Request PR-9
ML11090053631 March 2011Falsification of Electronic Dosimeter Alarm Records by a Health Physics Crew Leader
ML11097014630 March 2011Units I and 2, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual ReportFuel cladding
ML11109021624 March 2011Initial Exam 2011-301 Post Exam CommentsJob Performance Measure
ML11154008224 March 2011Initial Exam 2011-301 General CorrespondenceJob Performance Measure
ML19092A10611 February 2011FPL to FDEP, St. Lucie Plant Condition IX.C.1 Marine Turtle Authorizations, Monthly Summary for January 2011
Press Release-II-11-002, NRC Schedules Meeting to Discuss Safety Culture at Fpl'S Nuclear Plants5 January 2011Press Release-II-11-002: NRC Schedules Meeting to Discuss Safety Culture at Fpl'S Nuclear Plants
TAC:ME350131 January 2011
TAC:ME519030 March 2011
TAC:ME58273 March 2011
TAC:ME61183 March 2011