Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML12156A4114 June 2012Intervenors' Motion to Amend and Supplement Proposed Contention No. 5 (Shield Building Cracking)Coatings
Aging Management
Moisture barrier
Earthquake
ML12170A87718 June 2012Petition to Suspend Final Decisions in All Pending Reactor Licensing Proceedings Pending Completion of Remanded Waste Confidence Proceedings
ML12188A7926 July 2012Intervenors' Combined Reply to FENOC and NRC Staff Opposition to 'Motion to Amend and Supplement Proposed Contention No. 5 (Shield Building Cracking)'Aging Management
ML12189A0017 July 2012Intervenors' Report of 10CFR2.323(b) Consultation Prior to Filing of February 2012 Intervenors Motion to Amend Motion for Admission of Contention No. 5
ML12191A4219 July 2012Intervenors' Motion for Leave to File a New Contention Concerning Temporary Storage and Ultimate Disposal of Nuclear Waste at Davis-Besse Nuclear Power Station
ML12193A26011 July 2012Intervenors' Revised Report of 10 CFR Section 2.323 (B) Consultation to Filing of February 2012 Intervenors Motion to Amend Motion for Admission of Contention No. 5
ML12198A56116 July 2012Intervenors' Third Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking)High winds
Aging Management
Moisture barrier
Earthquake
ML12205A50723 July 2012Intervenors' Fourth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking)High winds
Finite Element Analysis
Aging Management
Earthquake
Grace period
ML12208A43126 July 2012Firstenergy'S Motion for Summary Disposition of Contention 4 (SAMA Analysis Soure Terms)Probabilistic Risk Assessment
License Renewal
Affidavit
ML12229A58416 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking)Safe Shutdown
Unanalyzed Condition
Boric Acid
High winds
Tornado Missile
Safe Shutdown Earthquake
Aging Management
Earthquake
ML12229A58516 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix I: NRC FOIA Responses (Mailing Envelope, Index, B-1 Through B-4 (Partial))
ML12229A58616 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix II: NRC FOIA Responses (B-4 (Partial) Through B-23)
ML12229A58716 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix III: NRC FOIA Responses (B-24 Through B-26)
ML12229A58816 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix II: NRC FOIA Responses (B-27 Through B-32)
ML12230A00017 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Response (B-33 Through B-38)
ML12230A00117 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-39 Through B-43)
ML12230A00217 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-44 Through B-48)
ML12230A00317 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-49 Through B-50)
ML12237B19724 August 2012Intervenors' Combined Reply to NRC and FENOC Answers to Inervenors' Third and Fourth Motions to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking)Aging Management
Moisture barrier
Earthquake
ML12258A77714 September 2012Intervenors' Reply in Opposition to 'Firstenergy'S Motion for Summary Disposition of Contention 4 (Sama Analysis - Source Terms).'Boric Acid
Probabilistic Risk Assessment
Moisture barrier
Environment Report
ML12268A37624 September 2012Fenoc'S Motion to Strike Intervenors' Reply in Opposition to Firstenergy'S Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms).
ML12278A0404 October 2012Intervenors' Response in Opposition to Fenoc'S Motion to Strike 'Intervenors' Reply in Opposition to Firstenergy'S Motion for Summary Disposition of Contention 4 (SAMA Analysis - Source Terms).'Earthquake
ML12297A35322 October 2012Intervenors' Motion for Reconsideration of ASLB Order Granting Fenoc'S Motion to Strike Intervenors' Reply in Opposition to Firstenergy'S Motion for Summary Disposition of Contention 4 (SAMA Analysis-Source Terms)
ML12304A06530 October 2012Motion to File Intervenors' Motion for Reconsideration of ASLB Order Granting Fenoc'S Motion to Strike Nunc Pro Tunc
ML12334A26029 November 2012Joint Proposed Corrections to the Transcript of the Oral Argument Held on November 5-6, 2012Probabilistic Risk Assessment
Aging Management
ML13173A00121 June 2013Petitioners' Reply in Support of Petition to Intervene and for an Adjudicatory Public Hearing of FENOC License Amendment RequestIncorporated by reference
ML13179A40328 June 2013Firstenergy Nuclear Operating Company'S Motion to Strike Portions of Petitioners' ReplyIncorporated by reference
ML13182A4791 July 2013NRC Staff Motion to Strike Portions of Joint Petitioners Reply or, in the Alternative, for Leave to Reply
ML13190A2168 July 2013Petitioners' Reply in Opposition to FENOC 'Motion to Strike'
ML13192A28411 July 2013Firstenergy Nuclear Operating Company'S Answer Supporting the NRC Staff'S Motion to Strike Portions of Petitioners Reply
ML13192A50511 July 2013Petitioners' Reply in Opposition to NRC Staff Motion to Strike
ML13266A43223 September 2013Fenoc'S Petition for Certification of Waste Confidence-Related Question to the Commission Pursuant to 10 C.F.R. Section 2.32.(f)(2)
ML13277A7253 October 2013Intervenors' Memorandum in Opposition to 'Fenoc'S Petition for Certification of Waste Confidence-Related Question to the Commission Pursuant to 10CFR2.323(f)(2).'
ML14058A68227 February 2014Certificate of Service of Petition to Suspend
ML14058A68327 February 2014Petition to Suspend Reactor Licensing Decisions and Reactor Re-Licensing Decisions Pending Completion of Rulemaking Proceeding Regarding Environmental Impacts of High-Density Pool Storage of Spent Fuel and Mitigation MeasuresProbabilistic Risk Assessment
Incorporated by reference
Large early release frequency
License Renewal
Earthquake
Fuel cladding
Environmental Justice
Backfit
ML14112A00315 February 2014Exhibit 2 - Toledo Blade Article, Davis-Besse Had Air Gap in Shield Building, February 15, 2014
ML14112A00420 September 2013Exhibit 6 - Preliminary Notice of Event or Occurrence, September 20, 2013
ML14112A00529 October 2002Exhibit 5 - Minutes of Internal Meeting of Davis-Besse Oversight Panel, October 29, 2002Boric Acid
Tornado Missile Protection
ML14112A00620 May 2013Exhibit 8 - Expert Witness Report of Arnold Gundersen, 50-246-LA
ML14112A00721 April 2014Motion for Admission of Contention No. 6 on Shield Building Concrete Void, Cracking and Broken Rebar ProblemsSafe Shutdown
Aging Management
Significance Determination Process
License Renewal
Earthquake
Affidavit
ML14112A00815 April 2014Exhibit 7 - Request for Additional Information (Rai), April 15, 2014
ML14112A00919 February 2014Exhibit 1 - Preliminary Notice of Event or Occurrence, February 19, 2014
ML14113A00114 April 2014Exhibit 3 - Declaration of Victoria Clemons
ML14144A00023 May 2014Intervenors' Reply in Support of Motion for Admission of Contention No. 6 on Shield Building Concrete Void, Cracking and Broken Rebar ProblemsAging Management
Earthquake
ML14245A6562 September 2014Intervenors' Motion for Admission of Contention No. 7 on Worsening Shield Building Cracking and Inadequate Amps in Shield Building Monitoring ProgramSafe Shutdown
Nondestructive Examination
Aging Management
Moisture barrier
Earthquake
ML14251A6098 September 2014Intervenors Motion to Amend and Supplement Contention No. 7 on Worsening Shield Building Cracking and Inadequate AMPs in Shield Building Monitoring ProgramAging Management
Moisture barrier
ML14251A6108 May 2012Riley E-mail Re Current Licensing BasisTornado Generated Missile
ML14252A8989 September 2014Unopposed Motion to Establish Consolidated Briefing Schedule for Proposed Contention 7 Admissibility Filings
ML14255A03012 September 2014Erratum to Intervenors' Motion to Amend and Supplement Contention No. 7 on Worsening Shield Building Cracking and Inadequate AMPs in Shield Monitoring Program
ML14311A9897 November 2014Petitioners and Intervenors Consolidated Reply to Answers to Petitions to Suspend Final Reactor Licensing Decisions, Motions to Admit a New Contention, and Motions to Reopen the Record