A05394, Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1 | 27 June 1988 | Forwards Final Summary Rept Addressing IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures. No Addl Work W/ Respect to Bulletin Suppl Necessary for Millstone Unit 1 | Boric Acid Stroke time |
A05442, Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 | 18 February 1986 | Submits Addl Info Re Compliance W/Atws Rule Schedule,Per 10CFR50.62,in Context of Isap.Isap Review Will Be Submitted by 860625.Request for Permanent Exemption Will Be Submitted by 860530 | Exemption Request |
A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl | 13 June 1986 | Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl | Reactor Vessel Water Level Ultimate heat sink Fuel cladding Power change |
A05836, Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | 3 July 1986 | Responds to IE Info Notice 86-047, Erratic Behavior of Static O-Ring Differential Pressure Switches. Based on Util Investigations,Switches Not Used in Integrated Safety Application.Issue Inapplicable to Plants | |
A05911, Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | 25 July 1986 | Responds to IE Bulletin 86-002, Static O-Ring Differential Pressure Switches. Switches Will Not Be Used in safety- Related Applications,Per 860703 Response to IE Info Notice 86-047, Erratic Behavior of Static O-Ring.. | |
A05959, Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | 12 March 1987 | Forwards Draft Version of Spec for Insp,Evaluation & Repair of Cracks in Safety-Related Concrete Masonry Walls, Per IE Bulletin 80-11.Spec Should Be Incorporated Into Plant Procedures by Jul 1987 | High Radiation Area |
A06023, Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | 1 October 1986 | Forwards Estimated Schedules for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14 | |
A06150, Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | 20 November 1986 | Responds to IE Bulletin 86-003, Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-Operated Valve in Min Flow Recirculation Line. Safety Concerns Inapplicable to Plants | |
A06244, Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | 7 January 1987 | Ack Receipt of Invoices for Second Installment of Annual Fees,Per 10CFR171.Fee Will Be Wire Transferred on 870130 in Payment of Invoices.Invoices & Procedures for Electronic Transfer of Funds Encl | |
A06447, Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices | 24 April 1987 | Advises That Third Quarterly Installment of FY87 Annual Fee Per 10CFR171 Will Be Transferred on 870430 in Payment of Encl Invoices | |
A06518, Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A | 18 May 1987 | Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A | |
A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 | 29 May 1987 | Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170 | |
A06584, Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002 | 30 July 1987 | Responds to NRC 870527,0602 & 25 Requests for Addl Info Re Util Responses to Generic Ltr 83-28,Item 2.2.Util Will Perform Generic Review of Issue for Haddam Neck & Millstone Units 1,2 & 3 & Submit Addl Info by 871002 | |
A06595, Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests | 25 September 1987 | Forwards Addl Info Re Generic Ltr 83-28,Item 2.2,per NRC 870527,0602 & 25 Requests | |
A06635, Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl | 14 July 1987 | Advises That Fourth Quarterly Installment of 1987 Annual Fee Will Be Wire Transferred on 870731.Invoices F1269,F1302, F1303 & F1304 Encl | |
A06665, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Util Intends to Meet NUMARC Guidelines on Pipe Wall Thinning in high-energy Piping Sys | 11 September 1987 | Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Util Intends to Meet NUMARC Guidelines on Pipe Wall Thinning in high-energy Piping Sys | |
A06692, Informs of Payment to Ofc of Resource Mgt for Encl Invoices 1507A,1511A,1527A & 1532A | 14 August 1987 | Informs of Payment to Ofc of Resource Mgt for Encl Invoices 1507A,1511A,1527A & 1532A | |
A06779, Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined | 8 October 1987 | Informs That Util Will Provide Response to NRC 870824,0903 & 04 Requests for Addl Info Re Generic Ltr 83-28,Item 4.2 or Schedule for Addressing Requests by 871215,once Scope of Work Properly Defined | |
A06818, Notifies That Payment of Fees for Recent Insps of Plants Being Sent,Based on Listed Invoices | 26 October 1987 | Notifies That Payment of Fees for Recent Insps of Plants Being Sent,Based on Listed Invoices | |
A06822, Ack Receipt of Invoices G0029,G0063,G0064 & G0065 for First Quarterly Installment of 1988 Annual Fee,Per 10CFR171. Understands That Fee Will Be wire-transferred on 871030 in Payment of Invoices | 26 October 1987 | Ack Receipt of Invoices G0029,G0063,G0064 & G0065 for First Quarterly Installment of 1988 Annual Fee,Per 10CFR171. Understands That Fee Will Be wire-transferred on 871030 in Payment of Invoices | |
A06902, Advises That Utils in Receipt of Listed Invoices for Costs Incurred in Review of Submittals for Plants.Payment of Invoices Sent to J Rodriquez,Ofc of Resource Mgt | 4 December 1987 | Advises That Utils in Receipt of Listed Invoices for Costs Incurred in Review of Submittals for Plants.Payment of Invoices Sent to J Rodriquez,Ofc of Resource Mgt | |
A06911, Responds to NRC Compliance Bulletin 87-002 Re Adequacy of Fasteners Used in Nuclear Power Plants.Insps of Fasteners Conducted in Accordance w/QSD-3.08 & QSD-3.07.Test Results & Info on Procurement Levels & Testing Discrepancies Encl | 12 January 1988 | Responds to NRC Compliance Bulletin 87-002 Re Adequacy of Fasteners Used in Nuclear Power Plants.Insps of Fasteners Conducted in Accordance w/QSD-3.08 & QSD-3.07.Test Results & Info on Procurement Levels & Testing Discrepancies Encl | Liquid penetrant |
A06980, Ack Receipt of Invoices G0369,G0403,G0404 & G0405 for Second Quarterly Installment of 1988 Annual Fee.Payment for Invoices Will Be Transferred on 880129,per Instructions | 18 January 1988 | Ack Receipt of Invoices G0369,G0403,G0404 & G0405 for Second Quarterly Installment of 1988 Annual Fee.Payment for Invoices Will Be Transferred on 880129,per Instructions | |
A07028, Responds to Generic Ltr 88-02 Re Isap Ii.Util Will Continue to Participate in Isap & Will Submit Proposed License Conditions Endorsing Isap for Utils.Proposal Made in Generic Ltr 88-02 for Isap II Endorsed | 19 February 1988 | Responds to Generic Ltr 88-02 Re Isap Ii.Util Will Continue to Participate in Isap & Will Submit Proposed License Conditions Endorsing Isap for Utils.Proposal Made in Generic Ltr 88-02 for Isap II Endorsed | |
A07106, Informs That Listed Plants Use GE HFA-type Latching Relays Per NRC Bulletin 88-03.All Plants Will Be Inspected During Next Refueling Outage in 1989 | 6 July 1988 | Informs That Listed Plants Use GE HFA-type Latching Relays Per NRC Bulletin 88-03.All Plants Will Be Inspected During Next Refueling Outage in 1989 | |
A07132, Informs That Payment of Third Quarterly Installment of 1988 Annual Fee Per 10CFR171 Will Be Wire Transferred on 880429 | 18 April 1988 | Informs That Payment of Third Quarterly Installment of 1988 Annual Fee Per 10CFR171 Will Be Wire Transferred on 880429 | |
A07141, Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. Source of RCS Leakage Determined by Insp to Be at Reactor Vessel Head O-Ring | 27 May 1988 | Responds to Generic Ltr 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants. Source of RCS Leakage Determined by Insp to Be at Reactor Vessel Head O-Ring | Boric Acid Coatings |
A07182, Informs That Listing of All nonsafety-related Suppliers & Matl Specs Required in Response to NRC Bulletin 87-002,Suppl 1, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Would Consume Many Man Hours & Not Feasible | 13 June 1988 | Informs That Listing of All nonsafety-related Suppliers & Matl Specs Required in Response to NRC Bulletin 87-002,Suppl 1, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Would Consume Many Man Hours & Not Feasible | |
A07218, Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Data Collected to Date Continues to Support Conclusions Included in Util Stating That Problems Do Not Exist at Plants | 3 May 1989 | Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Data Collected to Date Continues to Support Conclusions Included in Util Stating That Problems Do Not Exist at Plants | Boric Acid Packing leak |
A07234, Forwards Response to NRC Bulletin 88-005, Nonconforming Matls Supplied by Pipings Supplies,Inc. at Folsom,Nj & West Jersey Mfg Co at Williamstown,Nj. No Significant Deficiencies Discovered & No Matl Replaced | 2 September 1988 | Forwards Response to NRC Bulletin 88-005, Nonconforming Matls Supplied by Pipings Supplies,Inc. at Folsom,Nj & West Jersey Mfg Co at Williamstown,Nj. No Significant Deficiencies Discovered & No Matl Replaced | |
A07306, Informs That Utils Do Not Possess,Use or Transport Model Spec 2-T Radiographic Exposure Devices,Per Bulletin 88-006 | 29 June 1988 | Informs That Utils Do Not Possess,Use or Transport Model Spec 2-T Radiographic Exposure Devices,Per Bulletin 88-006 | |
A07343, Notifies of Receipt of Invoices G0999,G1035,G1036 & G1037 for Fourth Quarterly Installment of 1988 Annual Fee | 21 July 1988 | Notifies of Receipt of Invoices G0999,G1035,G1036 & G1037 for Fourth Quarterly Installment of 1988 Annual Fee | |
A07397, Responds to Generic Ltr 88-11 Re Methods Described in Rev 2 to Reg Guide 1.99 to Predict Effect of Neutron Radiation on Reactor Vessel Matls.Rcpb for Plants Should Behave in Nonbrittle Manner.Calculated Adjusted Ref Temp Values Encl | 1 November 1988 | Responds to Generic Ltr 88-11 Re Methods Described in Rev 2 to Reg Guide 1.99 to Predict Effect of Neutron Radiation on Reactor Vessel Matls.Rcpb for Plants Should Behave in Nonbrittle Manner.Calculated Adjusted Ref Temp Values Encl | |
A07413, Forwards Specific Emergency Operating Procedures for Use During Incident Response Ctr Activation | 7 October 1988 | Forwards Specific Emergency Operating Procedures for Use During Incident Response Ctr Activation | |
A07483, Forwards Updated Schedules for Operator Licensing Exams for FY89-92 in Response to Generic Ltr 88-13 | 16 September 1988 | Forwards Updated Schedules for Operator Licensing Exams for FY89-92 in Response to Generic Ltr 88-13 | |
A07666, Forwards Response to NRC Bulletin 88-010 Re Nonconforming Molded Case Circuit Breakers.Nontraceable Breakers at Plant Will Be Replaced or Tested No Later than Next Refueling Outage,Currently Scheduled to Start 900825 & 890902 | 16 June 1989 | Forwards Response to NRC Bulletin 88-010 Re Nonconforming Molded Case Circuit Breakers.Nontraceable Breakers at Plant Will Be Replaced or Tested No Later than Next Refueling Outage,Currently Scheduled to Start 900825 & 890902 | |
A07693, Outlines General Approach Which Util Intends to Utilize in Responding to Generic Ltr 88-20, Individual Plant Exams for Severe Accident Vulnerabilities & Summarizes Key Points of Past Involvement in Field of PRA & Accident Mgt | 27 July 1989 | Outlines General Approach Which Util Intends to Utilize in Responding to Generic Ltr 88-20, Individual Plant Exams for Severe Accident Vulnerabilities & Summarizes Key Points of Past Involvement in Field of PRA & Accident Mgt | High winds Internal Flooding Probabilistic Risk Assessment Backfit |
A07937, Submits Responses to AEOD Survey on NRC Backfitting Process. Table Listing Costs of Imposed Backfits in 1988 Encl | 8 June 1989 | Submits Responses to AEOD Survey on NRC Backfitting Process. Table Listing Costs of Imposed Backfits in 1988 Encl | Systematic Assessment of Licensee Performance Backfit |
A07951, Responds to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Issue Represents No Problem at Any Millstone Unit.Haddam Neck Valves Will Be Inspected for Leakage During Upcoming Refueling Outage | 30 June 1989 | Responds to Suppl 3 to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Issue Represents No Problem at Any Millstone Unit.Haddam Neck Valves Will Be Inspected for Leakage During Upcoming Refueling Outage | Nondestructive Examination |
A07974, Advises That No Agreements Restricting Employees to Inform NRC of Potential Safety Issues Exist,Per V Stello | 31 July 1989 | Advises That No Agreements Restricting Employees to Inform NRC of Potential Safety Issues Exist,Per V Stello | |
A08007, Requests Extension of Deadline for Response to Generic Ltr 89-06, Task Action Plan Item I.D.2-SPDS-10CFR50.54(f), to No Later than 890721.Addl Time Needed to Allow for Completion of Thorough Internal Review of Response | 12 July 1989 | Requests Extension of Deadline for Response to Generic Ltr 89-06, Task Action Plan Item I.D.2-SPDS-10CFR50.54(f), to No Later than 890721.Addl Time Needed to Allow for Completion of Thorough Internal Review of Response | |
A08037, Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Plants Have Programs & Procedures in Place to Monitor Erosion/Corrosion for Both single-phase & two-phase Flow Sys | 13 July 1989 | Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Plants Have Programs & Procedures in Place to Monitor Erosion/Corrosion for Both single-phase & two-phase Flow Sys | Nondestructive Examination |
A08050, Advises That No Electrical Components or Parts Procured from Planned Maint Sys for Use in Nuclear Plants,Per NRC Info Notice 88-019 | 16 June 1989 | Advises That No Electrical Components or Parts Procured from Planned Maint Sys for Use in Nuclear Plants,Per NRC Info Notice 88-019 | |
A08093, Advises That Fourth Quarterly Installment of 1989 Annual Fees Will Be Wire Transferred on 890731 in Payment of Invoices H1146,H1222,H1190 & H1151,per 10CFR171 | 7 July 1989 | Advises That Fourth Quarterly Installment of 1989 Annual Fees Will Be Wire Transferred on 890731 in Payment of Invoices H1146,H1222,H1190 & H1151,per 10CFR171 | |
A08111, Advises That Payment for 10CFR170 Fee Sent to Jm Rodriquez Re NRC Review of Rev 11 to QA Topical Rept | 7 July 1989 | Advises That Payment for 10CFR170 Fee Sent to Jm Rodriquez Re NRC Review of Rev 11 to QA Topical Rept | |
A08153, Advises That Payment for Invoices H1386,H1387,H1410 & H1411 Will Be wire-transferred on 890810,per NRC Instructions | 1 August 1989 | Advises That Payment for Invoices H1386,H1387,H1410 & H1411 Will Be wire-transferred on 890810,per NRC Instructions | |
A08170, Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-03 | 30 August 1989 | Forwards Updated Schedules for Operator Licensing & Requalification Exams for Plants,Per Generic Ltrs 89-12 & 89-03 | |
A08186, Ack Receipt of Listed Invoices for Cost Incurred During Insps.Funds Will Be wire-transferred on 890824 | 8 August 1989 | Ack Receipt of Listed Invoices for Cost Incurred During Insps.Funds Will Be wire-transferred on 890824 | |
A08211, Ack Receipt of Listed Invoices for Cost Incurred During Routine Insps at Plants.Payment Will Be Made on 890906 | 22 August 1989 | Ack Receipt of Listed Invoices for Cost Incurred During Routine Insps at Plants.Payment Will Be Made on 890906 | |
A08237, Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps | 28 August 1989 | Confirms Receipt of Listed Invoices for Costs Incurred During Routine Insps | |