BVY-92-139, Forwards Amend to License DPR-28,consisting of Proposed Change Number 166,revising TS Section 3.5.H.1,by Allowing one-time Extension of Seven Day LCO to Fourteen Days During Current Operating Cycle 16 to Permit Extensive Maintenance | 15 December 1992 | Forwards Amend to License DPR-28,consisting of Proposed Change Number 166,revising TS Section 3.5.H.1,by Allowing one-time Extension of Seven Day LCO to Fourteen Days During Current Operating Cycle 16 to Permit Extensive Maintenance | |
BVY-92-140, Forwards Amend to License DPR-28,consisting of Proposed Change Number 167,revising TS Calibration Requirements in Table 4.2.5,to Reflect That No Meaningful Calibration of Startup Range Monitor & IRM Detector Not Fully Inserted | 15 December 1992 | Forwards Amend to License DPR-28,consisting of Proposed Change Number 167,revising TS Calibration Requirements in Table 4.2.5,to Reflect That No Meaningful Calibration of Startup Range Monitor & IRM Detector Not Fully Inserted | |
BVY-93-002, Forwards non-certified License Applications & Medical Certificates for Sp Aprea,Md Harris,Wf Paul & Cj Wamser,Per NUREG 1021 ES-202,Rev 6.Exams for Listed Applicants Scheduled for Wk of 930215.W/o Encl | 13 January 1993 | Forwards non-certified License Applications & Medical Certificates for Sp Aprea,Md Harris,Wf Paul & Cj Wamser,Per NUREG 1021 ES-202,Rev 6.Exams for Listed Applicants Scheduled for Wk of 930215.W/o Encl | |
BVY-93-006, Forwards Ltr Dtd 930113,submitting non-certified License Applications & Medical Certificates for Four Employees. Requests That Attachments to Subj Ltr Be Withheld (Ref 10CFR2.790(a)(6)) | 21 January 1993 | Forwards Ltr Dtd 930113,submitting non-certified License Applications & Medical Certificates for Four Employees. Requests That Attachments to Subj Ltr Be Withheld (Ref 10CFR2.790(a)(6)) | |
BVY-93-008, Informs That Rev 7 to NUREG-1021 Have Been Reviewed & Will Be Used to Conduct SRO Exams to Be Administered in Feb | 26 January 1993 | Informs That Rev 7 to NUREG-1021 Have Been Reviewed & Will Be Used to Conduct SRO Exams to Be Administered in Feb | |
BVY-93-015, Responds to NRC Bulletin 90-001 Supplement 1, Loss of Fill Oil in Transmitters Manufactured by Rosemount | 16 February 1993 | Responds to NRC Bulletin 90-001 Supplement 1, Loss of Fill Oil in Transmitters Manufactured by Rosemount | |
BVY-93-084, Responds to Insp Rept 50-271/93-12 on 930604 Re Unresolved Items Identified in Sections 3.2 & 3.3 | 13 August 1993 | Responds to Insp Rept 50-271/93-12 on 930604 Re Unresolved Items Identified in Sections 3.2 & 3.3 | |
BVY-93-100, Retracts 930827 Request That Condition Be Removed from LP Amirault License SOP-10859,per Determination That Already Sent & Amend to Subj License Issued.Proprietary Documentation Encl.Documentation Withheld | 17 September 1993 | Retracts 930827 Request That Condition Be Removed from LP Amirault License SOP-10859,per Determination That Already Sent & Amend to Subj License Issued.Proprietary Documentation Encl.Documentation Withheld | |
BVY-93-101, Requests That NRC Consider Deferring Schedule for NRC SWS Operational Performance Insp Until Later in 1993 & Opportunity to Make Proposal Re Performing Self Assessment of SWS Operational Performance During Wk of 931018 | 14 September 1993 | Requests That NRC Consider Deferring Schedule for NRC SWS Operational Performance Insp Until Later in 1993 & Opportunity to Make Proposal Re Performing Self Assessment of SWS Operational Performance During Wk of 931018 | |
BVY-93-104, Discusses Followup Visit to Plant on Status of Licensees NUREG-1220 Audit Progress Sent to NRC for Review | 17 September 1993 | Discusses Followup Visit to Plant on Status of Licensees NUREG-1220 Audit Progress Sent to NRC for Review | |
BVY-93-105, Summarizes Findings & Corrective Actions That Will Be Implemented Prior to Resuming Fuel Handling Activities,As Followup to Recent Discussions W/Nrc Region I Re Two Fuel Incidents on 930903 & 09 | 20 September 1993 | Summarizes Findings & Corrective Actions That Will Be Implemented Prior to Resuming Fuel Handling Activities,As Followup to Recent Discussions W/Nrc Region I Re Two Fuel Incidents on 930903 & 09 | |
BVY-93-106, Forwards Util Corrective Action Plans to Prevent Recurrence of Refueling Incidents Occurring in Sept 1993 at Plant | 22 September 1993 | Forwards Util Corrective Action Plans to Prevent Recurrence of Refueling Incidents Occurring in Sept 1993 at Plant | Temporary Modification |
BVY-93-108, Responds to Violations Noted in Insp Rept 50-271/93-14. Corrective Actions:Nonconforming Matls Removed & Independent Insp of Remaining Scaffolding & Temporary Matls within Reactor Bldg Performed | 27 September 1993 | Responds to Violations Noted in Insp Rept 50-271/93-14. Corrective Actions:Nonconforming Matls Removed & Independent Insp of Remaining Scaffolding & Temporary Matls within Reactor Bldg Performed | Fitness for Duty Temporary Modification Scaffolding |
BVY-93-109, Notification of Licensees Plans to Implement Optical Disk Technology for Purposes of Storage & Retrieval of Plant Records,Including QA Records | 28 September 1993 | Notification of Licensees Plans to Implement Optical Disk Technology for Purposes of Storage & Retrieval of Plant Records,Including QA Records | |
BVY-93-111, Responds to GL 89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment | 5 October 1993 | Responds to GL 89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment | |
BVY-93-112, Provides Results of Insp Activities During 1993 Refueling Outage W/Regard to Rv Cladding & Plans for Future Insps,As Requested in NRC .Indications in Areas of Cladding Inside Rv Head Discovered | 6 October 1993 | Provides Results of Insp Activities During 1993 Refueling Outage W/Regard to Rv Cladding & Plans for Future Insps,As Requested in NRC .Indications in Areas of Cladding Inside Rv Head Discovered | |
BVY-93-114, Submits Results of 930823 Telcon on Behalf of Licensee Re Treatment of Varying Axial Power Distribution Effects in Reload Analyses | 8 October 1993 | Submits Results of 930823 Telcon on Behalf of Licensee Re Treatment of Varying Axial Power Distribution Effects in Reload Analyses | |
BVY-93-115, Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 17 COLR & Rept YAEC-1867, Vermont Yankee Cycle 17 Core Performance Analysis Rept | 8 October 1993 | Forwards Rev 0 to Vermont Yankee Nuclear Power Station Cycle 17 COLR & Rept YAEC-1867, Vermont Yankee Cycle 17 Core Performance Analysis Rept | |
BVY-93-116, Provides Updated Status & Schedule for Completion of Remaining MOV Activities,Per GL 89-10.Informs That Revised PMT Procedure Has Been Drafted & Presently Under Review. Procedure Rev Will Formalize Current MOV PMT Practices | 12 October 1993 | Provides Updated Status & Schedule for Completion of Remaining MOV Activities,Per GL 89-10.Informs That Revised PMT Procedure Has Been Drafted & Presently Under Review. Procedure Rev Will Formalize Current MOV PMT Practices | |
BVY-93-119, Forwards Updated TS Pages to Accompany Proposed Change 147 Re ATWS Rule 10CFR50.62,as Requested.Pages Reflect Changes Being Proposed,As Well as All Amend Activity Since 890512 Submittal | 22 October 1993 | Forwards Updated TS Pages to Accompany Proposed Change 147 Re ATWS Rule 10CFR50.62,as Requested.Pages Reflect Changes Being Proposed,As Well as All Amend Activity Since 890512 Submittal | |
BVY-93-121, Forwards Proposed Vermont Yankee Self-Assessment Plan, Service Water Operational Performance Insp, in Response to GL 89-13.Some Features of Plan Clarified or Specifically Stated,Since 931020 Presentation of Draft Plan to Region I | 28 October 1993 | Forwards Proposed Vermont Yankee Self-Assessment Plan, Service Water Operational Performance Insp, in Response to GL 89-13.Some Features of Plan Clarified or Specifically Stated,Since 931020 Presentation of Draft Plan to Region I | |
BVY-93-123, Responds to Hardware Mod Requested in Ieb 93-003, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in Bwrs | 8 November 1993 | Responds to Hardware Mod Requested in Ieb 93-003, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in Bwrs | Reactor Vessel Water Level |
BVY-93-124, Frowards Preliminary Intended Rev to FSAR Figure 2.2-5. Proposed Change 170 Submitted to NRC to Update Licensee Tech Specs W/Recent Changes to 10CFR20 | 9 November 1993 | Frowards Preliminary Intended Rev to FSAR Figure 2.2-5. Proposed Change 170 Submitted to NRC to Update Licensee Tech Specs W/Recent Changes to 10CFR20 | |
BVY-93-126, Responds to Violation Noted in Insp Rept 50-271/93-08 Re Operational Safety Team Insp at Plant on 930607 & 0702. Corrective Actions:Leadership Training Utilizing Case Studies to Improve Mgt Effectiveness for Section of Staff | 12 November 1993 | Responds to Violation Noted in Insp Rept 50-271/93-08 Re Operational Safety Team Insp at Plant on 930607 & 0702. Corrective Actions:Leadership Training Utilizing Case Studies to Improve Mgt Effectiveness for Section of Staff | Temporary Modification |
BVY-93-128, Responds to NRC Re Violations Noted in Safety Insp Rept 50-271/93-22 on 930920-24.Corrective Actions: Interpretation Problem Associated Drywell Personnel Entrance & Problem Associated W/Barrier at Torus Sump Area Corrected | 19 November 1993 | Responds to NRC Re Violations Noted in Safety Insp Rept 50-271/93-22 on 930920-24.Corrective Actions: Interpretation Problem Associated Drywell Personnel Entrance & Problem Associated W/Barrier at Torus Sump Area Corrected | |
BVY-93-129, Forwards Annual Cashflow Statements for Licensee Nine Sponser Companies for Yr 1993 | 22 November 1993 | Forwards Annual Cashflow Statements for Licensee Nine Sponser Companies for Yr 1993 | |
BVY-93-130, Provides Addl Info W/Regard to Recent Response to NRC Bulletin 93-002 Re Debris Plugging of ECCS Strainers & Info Obtained During Recently Completed 1993 Refueling Outage, in Response to Iein 93-034 | 24 November 1993 | Provides Addl Info W/Regard to Recent Response to NRC Bulletin 93-002 Re Debris Plugging of ECCS Strainers & Info Obtained During Recently Completed 1993 Refueling Outage, in Response to Iein 93-034 | |
BVY-93-132, Informs That Code Repairs to SW Piping Immediately Downstream of Valve V70-92D & Weld Connecting SW Piping Upstream of Valve V70-130B Successfully Implemented During 1993 Refueling Outage,Per Util 930918 & 20 Ltrs | 30 November 1993 | Informs That Code Repairs to SW Piping Immediately Downstream of Valve V70-92D & Weld Connecting SW Piping Upstream of Valve V70-130B Successfully Implemented During 1993 Refueling Outage,Per Util 930918 & 20 Ltrs | |
BVY-93-133, Provides Results of Reg Guide 1.97 Re Boiling Water Reactor Neutron Flux Monitoring | 1 December 1993 | Provides Results of Reg Guide 1.97 Re Boiling Water Reactor Neutron Flux Monitoring | |
BVY-93-137, Forwards Vermont Yankee Nuclear Power Corp Third Interval ISI Program 930901-030831, Rev 0 | 3 December 1993 | Forwards Vermont Yankee Nuclear Power Corp Third Interval ISI Program 930901-030831, Rev 0 | |
BVY-93-142, Forwards Updated Schedule for Addressing Unresolved Items Noted in Electrical Distribution Sys Function Insp Rept 50-271/92-81,per Util 921207 Response | 16 December 1993 | Forwards Updated Schedule for Addressing Unresolved Items Noted in Electrical Distribution Sys Function Insp Rept 50-271/92-81,per Util 921207 Response | |
BVY-93-143, Provides Addl Info Re Plant Alternate Cooling Sys to Provide Assurance That Sys Fully Operable,In Response to NRC Request During 931202 Enforcement Conference | 16 December 1993 | Provides Addl Info Re Plant Alternate Cooling Sys to Provide Assurance That Sys Fully Operable,In Response to NRC Request During 931202 Enforcement Conference | |
BVY-93-144, Forwards Applications & Medical Certificates Required for Renewal of SRO Licenses for Lj Cantrell & Le Doane,Per 10CFR55.57.Medical Certificates Withheld | 23 December 1993 | Forwards Applications & Medical Certificates Required for Renewal of SRO Licenses for Lj Cantrell & Le Doane,Per 10CFR55.57.Medical Certificates Withheld | |
BVY-93-146, Discusses Addl Info Re GL 92-01, Reactor Pressure Vessel Structural Integrity, Submitted Via Util | 21 December 1993 | Discusses Addl Info Re GL 92-01, Reactor Pressure Vessel Structural Integrity, Submitted Via Util | Finite Element Analysis |
BVY-93-148, Presents Current Status of TS Surveillance Evaluation Initiated in Sept 1993 in Response to Concerns Identified by NRC & Util Re Implementing Procedures for TS Required Surveillances | 30 December 1993 | Presents Current Status of TS Surveillance Evaluation Initiated in Sept 1993 in Response to Concerns Identified by NRC & Util Re Implementing Procedures for TS Required Surveillances | |
BVY-93-149, Submits Response to Request for Addl Info Re Atmospheric Release Advisory Capability | 30 December 1993 | Submits Response to Request for Addl Info Re Atmospheric Release Advisory Capability | Met Tower |
BVY-94-008, Forwards Clarifications to Rev 24 to YOQAP-I-A, QA Program, Consisting of Clarification to Yankee Rowe & Vermont Yankee Nsar Committees & Editorial Changes to Ensure Agreement W/Ynps TS | 21 January 1994 | Forwards Clarifications to Rev 24 to YOQAP-I-A, QA Program, Consisting of Clarification to Yankee Rowe & Vermont Yankee Nsar Committees & Editorial Changes to Ensure Agreement W/Ynps TS | |
BVY-94-100, Transmits Summary Rept Related to 10CFR50,App R Lighting Issue Recently Discovered at Plant.Related Procedures Reviewed & Concluded That Existing Procedures & Training Adequate to Achieve Safe Shutdown in Event of Fire | 11 October 1994 | Transmits Summary Rept Related to 10CFR50,App R Lighting Issue Recently Discovered at Plant.Related Procedures Reviewed & Concluded That Existing Procedures & Training Adequate to Achieve Safe Shutdown in Event of Fire | Safe Shutdown Emergency Lighting |
BVY-94-104, Responds to Operational Safeguards Response Evaluation Conducted at VT Yankee Nuclear Power Station.Util Purchasing Several Reinforced Concrete Structures (Planters) to Be Strategically Placed in Area Identified in Listed Issue | 4 November 1994 | Responds to Operational Safeguards Response Evaluation Conducted at VT Yankee Nuclear Power Station.Util Purchasing Several Reinforced Concrete Structures (Planters) to Be Strategically Placed in Area Identified in Listed Issue | |
BVY-94-110, Transmits Addl Info Concerning Fracture Mechanics Evaluations Performed to Support Alternative Insp Interval Re Feedwater Nozzle | 8 November 1994 | Transmits Addl Info Concerning Fracture Mechanics Evaluations Performed to Support Alternative Insp Interval Re Feedwater Nozzle | Liquid penetrant |
BVY-94-114, Responds to NRC Re Violation Noted in Insp Rept 50-271/94-20 on 940807-0917.Corrective Actions:Engineer Relieved from Further Duty & All Reactor & Computer Engineering Personnel Reinstructed on Overtime Requirements | 15 November 1994 | Responds to NRC Re Violation Noted in Insp Rept 50-271/94-20 on 940807-0917.Corrective Actions:Engineer Relieved from Further Duty & All Reactor & Computer Engineering Personnel Reinstructed on Overtime Requirements | |
BVY-94-116, Forwards Annual Cashflow Statements for Plant & Nine Sponsor Companies for Yr 1994 | 15 November 1994 | Forwards Annual Cashflow Statements for Plant & Nine Sponsor Companies for Yr 1994 | |
BVY-94-120, Forwards Vermont Yankee Reactor Operator Licensing Exam Schedule,Per Administrative Ltr 94-12 | 30 November 1994 | Forwards Vermont Yankee Reactor Operator Licensing Exam Schedule,Per Administrative Ltr 94-12 | |
BVY-94-124, Forwards Util Response to NRC RAI Re Plant Third ISI Program & Associated Relief Requests | 12 December 1994 | Forwards Util Response to NRC RAI Re Plant Third ISI Program & Associated Relief Requests | Safe Shutdown Scram Discharge Volume |
BVY-94-125, Submits Insp Plan,Including Plans for Evaluation &/Or Repair of Plant Core Shroud Based on Insp Results in Accordance W/ Commitment Made in 940817 Response to GL 94-03 | 15 December 1994 | Submits Insp Plan,Including Plans for Evaluation &/Or Repair of Plant Core Shroud Based on Insp Results in Accordance W/ Commitment Made in 940817 Response to GL 94-03 | |
BVY-94-126, Provides Updated Schedule for Completion of Planned Physical Mod of SWS at Plant to Mitigate Potential for Waterhammer Event During Postulated SBO Scenario | 15 December 1994 | Provides Updated Schedule for Completion of Planned Physical Mod of SWS at Plant to Mitigate Potential for Waterhammer Event During Postulated SBO Scenario | |
BVY-94-127, Transmits Addl Drawings Re ISI Program Review | 20 December 1994 | Transmits Addl Drawings Re ISI Program Review | |
BVY-94-128, Requests Exemption from Provisions of 10CFR50,App R,Section Iii.J, Emergency Lighting & Withdrawal of Previously Approved Exemption for Use of Emergency Ac Lighting in Torus Area of Reactor Bldg | 28 December 1994 | Requests Exemption from Provisions of 10CFR50,App R,Section Iii.J, Emergency Lighting & Withdrawal of Previously Approved Exemption for Use of Emergency Ac Lighting in Torus Area of Reactor Bldg | Safe Shutdown Emergency Lighting |
BVY-94-130, Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Two Pinhole through-wall Flaws in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 | 30 December 1994 | Documents Actions Taken by Util to Evaluate,W/O Immediate Code Repair,Two Pinhole through-wall Flaws in Svc Water Piping at Plant & Requests Relief from Requirement to Perform Immediate Code Repair,In Accordance W/Gl 90-05 | |
BVY-94-131, Amends Porton of 930928 Submittal Relating to Backup Copy Storage,As Result of Recent Internal Audit of Implementation of Document Storage & Retrieval Via Optical Disk Sys at Plant,Per GL 88-18 | 29 December 1994 | Amends Porton of 930928 Submittal Relating to Backup Copy Storage,As Result of Recent Internal Audit of Implementation of Document Storage & Retrieval Via Optical Disk Sys at Plant,Per GL 88-18 | |