Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20041A15412 February 1982Submits Response to Questions 750.2R,750.3R & 750.4R Re Alternative Sites.Updated Analysis Does Not Change Previous Conclusions on Environ Acceptability of Site
ML20041C66225 February 1982Responds to Commission Request for Comments on Applicant Estimates of Costs of Delays in Project.Costs of Delay Are Real & Substantial
ML20041C76319 February 1982Responds Partially to 820122 Request for Specific Info Re Core Energetics.Info Describes Contents of Magnetic Tapes & Envelopes of Microfiche.Psar Update Documenting Responses to Questions & Addl Computer Info Will Be Provided by 820312
ML20041C81919 February 1982Forwards Summary Rept on Conduct of Crbr Key Sys Reviews.
ML20041F54210 March 1982Forwards Affidavit Confirming Distribution of PSAR Amend 65 to Listed Local Public Officials & Govt Agency Representatives on 820305
ML20041G47212 March 1982Forwards Revised Environ Rept Section 5.7.1 Re Fuel Cycle. Key Changes Include Thorough Explanation of Method Used to Calculate Doses from Transportation,Tabular Transportation Summary & Estimate of Environ ImpactsTornado Missile
Contraband
Nondestructive Examination
ML20042A46917 March 1982Forwards Responses to 820113 Request for Addl Info Re ALARA, Per Listed Reg guides,NUREG-0323,NUREG-0718 Items III.D.3.1, II.B.2 & III.D.3.3 & NUREG-0761.Responses Will Be Incorporated Into PSAR Amends 66 & 67
ML20042C06822 March 1982Forwards Updated Pages Re Ref 10b of PSAR Section 1.6, CRBRP-3,Vol 2, Hypothetical Core Disruptive Accident Considerations in Crbrp:Assessment of Thermal Margin Beyond Design Base (Tmbdb).
ML20042C07524 March 1982Forwards Suppl to Safeguards Costs Per 820319 Revised Committee to Review Generic Requirements Fuel Cycle Description.Info Contains Reprocessing Plant Safeguards Remaining Items Per 820302 Request
ML20042C34319 March 1982Forwards Suppl to Safeguards Portion of Section 5.7.1 of Environ Rept.Any Changes Resulting from Review Will Be Incorporated Prior to Formal Issuance of Section 5.7.1 as Amend to Environ ReptTornado Missile
Contraband
Nondestructive Examination
ML20049H8753 March 1982Forwards Summary Rept on Current Assessment of Natural Circulation Capability W/Heterogeneous Core.
ML20049J53717 March 1982Forwards Amend 66 to PSAR
ML20049J66810 March 1982Forwards Status Rept of Applicant Views of Areas of Agreement & Disagreement Between Applicants & Intervenors Re Admissibility of Intervenors Revised Statement of Contentions.Certificate of Svc Encl
ML20049J95923 March 1982Forwards Certificate of Svc Confirming Distribution of Amend 66 to PSAR
ML20050A92629 March 1982Forwards Core Energetics Info Requested in Question 760.5 of NRC 820122 Ltr.Encl Info Describes Contents of Magnetic Tape & Computer Printout Listing.Amend 67 to PSAR Documenting Responses to Questions Will Be Issued 820331
ML20050D3456 April 1982Forwards Affidavit Confirming Distribution of PSAR Amend 67 to Designated Local Public Officials & Representatives of Govt Agencies
ML20050H9157 April 1982Forwards Revision 6 to Westinghouse Crbr Requirements for Environ Qualification of Class IE Equipment, Ref 13 of PSAR Section 1.6
ML20052A70026 April 1982Submits Correction to Last Page of 820419 Response to NRC Request for Addl Info Re Inservice InspDissimilar Metal Weld
ML20052B66614 April 1982Forwards Addl Info Re Regulations Applicable to Security Sys,In Response to 820325 Request.Detailed Compliance Will Be Addressed in FSAR & Info Will Be Incorporated Into Amend 68 to Psar.Encl Withheld (Ref 10CFR73.21)
ML20052C13129 April 1982Forwards Response to NRC 820226 & 0323 Requests for Addl Info Re Chemical & Mechanical EngineeringFinite Element Analysis
ML20052C8753 May 1982Forwards Revised Section 5.7.1, Crbrp Fuel Cycle, to Environ Rept.Revision Will Also Be Submitted as Part of Amend 14 to Environ ReptTornado Missile
Contraband
Nondestructive Examination
ML20052F3327 May 1982Responds to 820309 Request for Addl Info Re Equipment Qualification.Encl Responses to Questions CS 270.1,CS 270.2, CS 270.4 - CS 270.9 Will Be Incorporated Into PSAR Amend 69 by 820521Safe Shutdown
Anticipated operational occurrence
Earthquake
ML20052F34930 April 1982Forwards Amend 13 to Environ Rept,Incorporating Revisions to Sections 1,2.3,2.6,3.9,4.1,4.2,5.2, & 9.2
ML20052G40514 May 1982Requests Reconsideration of Commission 820316 Denial of Applicant Exemption Request.Commission Failed to Consider Public Interest Factors Including Informational, Programmatic,Intl & Natl Energy Policy BenefitsExemption Request
ML20052G95517 May 1982Forwards Response to 820311 Request for Addl Info Re Mechanical Engineering,Consisting of Questions CS 210.11, CS 210.13 & CS 210.14.Responses Will Be Incorporated in PSAR Amend 69,scheduled for 820528Earthquake
Flow Induced Vibration
ML20052G97017 May 1982Forwards Certificate of Svc Confirming Distribution of Amend 13 to Environ Rept
ML20052G98017 May 1982Responds to Equipment Qualification Branch Questions CS 270.3,CS 270.10,CS 270.11 & 270.13.Responses Will Be Incorporated Into PSAR Amend 69,scheduled for 820528
ML20052G98614 May 1982Responds to Auxiliary Sys Branch Questions CS 410.1,4,6,7,8, 11,12,13,14,15,16 & 17.Responses Will Be Incorporated Into PSAR Amend 69,scheduled for 820528
ML20052H00314 May 1982Forwards List of Topics & Repts to Be Submitted in Support of Crbr Program Ofc Assessment of Thermal Margin Beyond Design Basis.
ML20053C66228 May 1982Forwards Addl Info in Response to Request for Alternative Siting Analysis Including Possible Presence of 11 Species of Endangered Freshwater Mussels in Vicinity of FacilityEarthquake
Environment Report
ML20053D6844 June 1982Forwards Amend 14 to Environ Rept
ML20053E86027 May 1982Forwards Info Certifying Compliance W/Natl Historic Preservation Act
ML20054D83719 April 1982Forwards Response to Question CS 250.2 Per 820219 Request for Addl Info Re Inservice Insp.Response to Question CS 250.1 Will Be Provided by 820423Non-Destructive Examination
Dissimilar Metal Weld
ML20054F1138 June 1982Forwards Response to Questions CS 220.2,6,20,21,22,24,27 & 39 Re Structural Engineering.Responses Wil Be Incorporated Into PSAR Amend 69Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
ML20054F12710 June 1982Forwards Certificate of Svc Confirming Distribution of Environ Rept,Amend 14,to Local Public Officials & Representatives of Govt Agencies
ML20054F12810 June 1982Forwards Westinghouse Verification of Natural Circulation in Crbr Plant - Update, Incorporating Fftf Test Data.Rept Should Increase NRC Confidence in Natural Circulation as Viable Mode of Decay Heat Removal
ML20054F1348 June 1982Forwards Formal Response to 820409 Request for Addl Info Re Geology & Seismology,Questions CS 230.1,2,4 & 5 & CS 231.1, 2 & 3.Response Will Be Incorporated Into PSAR Amend 69Safe Shutdown Earthquake
Earthquake
ML20054F2168 June 1982Forwards Responses to Questions CS 421.7 & CS 491.7,per 820323 & 0409 Requests for Addl Info Re Instrumentation & Control Sys Circuits,Electrical Isolation Capability & Source Range Flux Monitoring Sys
ML20054F70914 June 1982Forwards Responses to NRC Feb,Mar & Apr Requests for Addl Info,To Be Incorporated Into Amend 69 to PSARSafe Shutdown
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Earthquake
ML20054G25417 June 1982Forwards Response to Questions in NRC 820226,0311 & 0409 Ltrs Re Prototype Test Program.Responses Will Be Incorporated in Amend 69 to PSARHot Short
Tornado Missile
Hydrostatic
Coatings
Tornado Generated Missile
Earthquake
Liquid penetrant
Flow Induced Vibration
ML20054G42117 June 1982Responds to NRC 761201 Request for Addl Info to Question 110.78 Re Dynamic & Static Analysis Used to Determine Structural & Functional Integrity of Selected Seismic Category I ComponentsSafe Shutdown
Hydrostatic
Earthquake
Flow Induced Vibration
ML20054G44917 June 1982Forwards Revised Responses to Questions CS 210.1 & CS 250.4 Per NRC 820602 Request & ES-LPD-82-007,CRBR Transition..., ES-LPD-82-008, Crbr Matls..., ES-LPD-82-009, Crbr Special..., & ES-LPD-82-011, Crbr Special..
ML20054H62021 June 1982Forwards Probabilistic Risk Assessment Program Plan for Crbr.Plan Will Be Incorporated Into PSAR & Will Fulfill NUREG-0718,Item II.B.8 RequirementProbabilistic Risk Assessment
ML20054H72121 June 1982Forwards Responses to Questions CS 760.15-18,59-78,80-88, 91,101 & 104 Re Fuel Rod Bowing & Max Transient Temp,Per 820430 Request.Questions Will Be Incorporated Into PSAR Amend 69Fuel cladding
ML20054J29318 June 1982Forwards Response to Questions CS 430.89 & 490.24 Re MSIV Steam or Feed Line Pipe Break Event,Per 820316 & 25 Requests.Info Will Be Incorporated Into PSAR Amend 69, Scheduled for Jul 1982Packing leak
ML20054J36922 June 1982Forwards General Schedule for Const Activities Supplementing Noise Data Listed in Environ Rept Table 4.1.5
ML20054J59725 June 1982Responds to NRC 820430 Request for Addl Info Re Questions CS760.24,29,41,45,77,79,98,134,137 & 138.Responses Will Be Incorporated Into PSAR Amend 69,scheduled for Submittal in Jul 1982
ML20054J62825 June 1982Forwards Update to PSAR Section 13.5, Plant Procedures, for Review in Advance of General Revision to Entire Chapter 13.Revision Will Be Forwarded in Jul 1982 Amend to PSAR
ML20054J77625 June 1982Forwards Responses to NRC 820430 & 0514 Requests for Addl Info.Responses Will Be Incorporated Into PSAR Amend 69, Scheduled for Submittal in Late Jul 1982Safe Shutdown
Stroke time
Safe Shutdown Earthquake
Earthquake
Coast down
ML20054K23025 June 1982Forwards Revised PSAR Figure 13.7-2 Re Physical Security Plan,Superseding Previously Provided Figures 13.7-2,13.7-3, 13.7-4 & 13.7-5.Encl Withheld (Ref 10CFR2.790)