Forwards Update to PSAR Section 13.5, Plant Procedures, for Review in Advance of General Revision to Entire Chapter 13.Revision Will Be Forwarded in Jul 1982 Amend to PSAR
ML20054J628
Person / Time
Site: Clinch River
Issue date: 06/25/1982
From: Longenecker J
ENERGY, DEPT. OF, CLINCH RIVER BREEDER REACTOR PLANT
To: Check P
Office of Nuclear Reactor Regulation
References
NUDOCS 8206290366
Download: ML20054J628 (3)


Text

' '

I Department of Energy Washington, D.C. 20545

-Docket No. 50-537 HQ:S:82:056 JUN 2 51932 Mr. Paul S. Check, Director CRBR Program Office Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555

Dear Mr. Check:

UPDATE; PSAR SECTION 13.5, PLANT PROCEDURES Enclosed is an update to PSAR Section 13.5," Plant Procedures." This update is provided for your review in advance of a general revision to the entire Chapter 13, which will be supplied to you in a July amendment to the PSAR.

Sincerely, J n R. Longen er Acting Director, Office of the Clinch River Breeder Reactor Plant Project Office of Nuclear Energy Enclosure cc: Service List Standard Distribution Licensing Distribution po ol 8206290366 820625 PDR ADOCK 03000537 A PDR

gg

,p i 13 5 PLANT PROCEDURES

~

13.5.1 Administrative Proceduf_ea q

The plant administrative procedures will be provided at the FSAR stage. At that time both general and initial test program administrative procedures will be addressed.

13.5.2 Operating and Maintenance Procedures Plant operating and maintenance procedures / instructions will be prepared -

for integrated plant operations, system operation, and plant maintenance 3 l

activities following the generic categories listed in Table 3 5-1. They will be prepared by the plant operating personnel and will follow the .

guidelines and requirements of NRC Regulatory Guide 133 and the ANS 3 2 l Standard. These proce'dures/ instructions will be followed by the licensed l ,

operators in the operating the plant.

l The preliminary schedule for the preparation of the operating and-l maintenance procedures / instructions is given in Table 13 5-1.

l l

l l

l

~

{

(4-A l t 1

~

13 5-1 '

Amend. 6?

.hme 1987

.$ g (

}*

, f"

+  ; >

_, _ _ , _ _ Table 13 5-1 Preliminary Schedule for O&M Procedures / Instructions f .t ' .

Title Schedule for Preoaration General Operating Instructions To be completed and approved six months prior to fuel load-ing and additional instructions developed as plant operation proceeds. 3 Normal Operating Instructions .To be completed and approved six months prior to fuel load- _

ing and additional instructions 'i' developed as plant operation proceeds.

Emergency Operating Instructions To be completed and approved six months prior to fuel, load-ing and additior.al instructions ,

developed as plant operation proceeds.

Abnormal Operating Instructions To be completed and approved six months prior to fuel load-ing and additional instructions developed as plant operation proceeds.

Maintenance Operating Instructions To be completed and approved six months prior to fuel load-ing and additional instructions developed as plant operation

g. proceeds.

Other Manuals / Procedures / Plans Fire Brigade Handbook

, Health Physics Manual .

Administrative Release Manual To be complete and available Division Procedure Manual six months prior to fuel load-Operational Quality Assurance Manual ing.

TVA Hazards Control Manual -

Nuclear Materials Management Guide .

Radiological Emergency Plan 1

~

13 5-2 ~,

June 1982