Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000254/FIN-2012005-05Licensee-Identified Violation
05000254/FIN-2012007-01CAPR Not Completed
05000254/FIN-2012010-01Concerns with Meeting One Time Visual Inspections IAW ASME Section Xi Requirements
05000254/FIN-2012010-02Questions Regarding Aging Management Inspections on the 16\\\' Diameter Discharge PipesUltimate heat sink
Aging Management
05000254/FIN-2012011-01Inadequate Procedure to Energize Bus 23-1 to Provide Torus Cooling for Unit 1
05000254/FIN-2012011-02Inadequate Procedure for Cold Shutdown Repair of 1A Recirculation Pump Discharge Valve Mo 1-202-5A
05000254/FIN-2012012-01Failure to provide complete and accurate decommissioning status reports
05000254/FIN-2012301-01Licensee-Identified ViolationSignificance Determination Process
05000254/FIN-2012403-01Security
05000254/FIN-2013002-01Failure to Follow Clearance Order InstructionsSignificance Determination Process
05000254/FIN-2013002-02Diesel Generator Cooling Water Pump Aligned to Wrong UnitSignificance Determination Process
05000254/FIN-2013002-03Licensee-Identified ViolationVT-2
05000254/FIN-2013003-01Calculation Assumptions Not Translated Into Operating ProceduresUltimate heat sink
05000254/FIN-2013003-02Question Concerning Licensing Bases of the Ultimate Heat SinkUltimate heat sink
05000254/FIN-2013003-03Failure to Assess Impact of Relocating Portable Pumps Offsite
05000254/FIN-2013003-04Question Concerning Availability of Dam Following a Seismic EventSafe Shutdown
Operating Basis Earthquake
Design basis earthquake
Earthquake
05000254/FIN-2013003-05Steam Dryer/Steam Separator Lifting Device Fracture Toughness PropertiesControl of Heavy Loads
05000254/FIN-2013003-06Unit 1 MSIV Slow ClosureStroke time
05000254/FIN-2013003-07Licensee-Identified Violation
05000254/FIN-2013003-08Licensee-Identified Violation
05000254/FIN-2013004-01Wrong Parts Installed For CRD HCUSignificance Determination Process
05000254/FIN-2013007-01Failure to Translate Design Basis Into Toxic Chemical Response Procedures
05000254/FIN-2013408-01Security
05000254/FIN-2013408-02Security
05000254/FIN-2013408-03Licensee-Identified Violation
05000254/FIN-2014002-01Steam Dryer/Steam Separator Lifting Device Failure to Meet American National Standards Institute (ANSI) N14.6Nondestructive Examination
Significance Determination Process
05000254/FIN-2014002-02Licensee-Identified ViolationSafe Shutdown
Fire Barrier
Fire impairment
Fire Protection Program
05000254/FIN-2014003-02Post Maintenance Test Fails to Ensure Battery Charger can Perform FunctionSignificance Determination Process
05000254/FIN-2014004-01Angle Iron Support Installed with Minimal Clearance to Unit 2 Torus Shell
05000254/FIN-2014004-02Inadequate Evacuation Time Estimate Submittals
05000254/FIN-2014004-03Licensee-Identified ViolationSignificance Determination Process
05000254/FIN-2014005-01HPCI Flood Barrier DegradedSignificance Determination Process
05000254/FIN-2014005-02Failure to Submit a Report Required by 10 CFR 50.72(b)(3)(xiii)
05000254/FIN-2014007-01Inadequate Rounds Package Acceptance CriteriaSignificance Determination Process
05000254/FIN-2014007-02Inadequate Administrative Controls 05000265/2014007-02Significance Determination Process
05000254/FIN-2014008-01Failure to Identify Aging Effects on Plant Equipment and StructuresAging Management
05000254/FIN-2014008-02Non-Conservative DGCW Pump Break Horsepower Assumed in EDG Loading Analysis
05000254/FIN-2014008-03Testing of MSIVs with Instrument Air or Drywell Pneumatic System Aligned to Actuators
05000254/FIN-2014403-01Licensee-Identified Violation
05000254/FIN-2015001-01Failure to Establish and Maintain Service Life for Safety-Related Relay Results in Failure and Inoperability
05000254/FIN-2015001-02Failure to Ensure Standby Lineup Results in Steam Release in the HPCI Room
05000254/FIN-2015001-03Licensee-Identified ViolationShutdown Margin
Fuel cladding
05000254/FIN-2015001-04Licensee-Identified ViolationSignificance Determination Process
05000254/FIN-2015002-01Failure to Conduct Post-Maintenance Testing Following Manual Operation of RCIC MOV
05000254/FIN-2015002-02Inadequate Zone of Protection for Electrical Bus MaintenanceSignificance Determination Process
05000254/FIN-2015003-01Failure to Evaluate Degraded or Non-Conforming Conditions for OperabilityUnanalyzed Condition
05000254/FIN-2015003-02Failure to Establish Adequate Procedure to Preclude Unacceptable Preconditioning of the SBGT SystemFuel cladding
05000254/FIN-2015003-03Failure to Adequately Inspect Relay Contacts for Oxidation Results in Relay Failure
05000254/FIN-2015004-01EAL Threshold Values Were Not RevisedFLEX
05000254/FIN-2015004-02Licensee-Identified Violation