Semantic search
Jump to navigation
Jump to search
Start date | Site | Title | |
---|---|---|---|
3F0388-02, Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl | 21 March 1988 | Crystal River | Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl |
3F0392-01, Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl | 24 March 1992 | Crystal River | Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl |
3F0392-02, Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 920430 | 30 March 1992 | Crystal River | Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 920430 |
3F0398-06, Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL | 30 March 1998 | Crystal River | Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL |
3F0496-04, Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications | 8 April 1996 | Crystal River | Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications |
3F0506-03, License Amendment Request 264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity | 25 May 2006 | Crystal River | License Amendment Request #264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity |
3F0508-03, Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15 | 30 May 2008 | Crystal River | Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15 |
3F0591-11, Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications | 31 May 1991 | Crystal River | Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications |
3F0595-05, TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld | 31 May 1995 | Crystal River | TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld |
3F0595-07, OTSG Tube ISI Refuel Outage 9 12 Month Rept | 30 June 1995 | Crystal River | OTSG Tube ISI Refuel Outage 9 12 Month Rept |
3F0599-02, Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790 | 5 May 1999 | Crystal River | Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790 |
3F0698-25, Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl | 16 June 1998 | Crystal River | Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl |
3F0698-28, Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG | 18 June 1998 | Crystal River | Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG |
3F0698-33, Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis | 30 June 1998 | Crystal River | Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis |
3F0791-06, Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992 | 18 July 1991 | Crystal River | Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992 |
3F0792-02, Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629 | 10 July 1992 | Crystal River | Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629 |
3F0794-02, Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc | 8 July 1994 | Crystal River | Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc |
3F0896-11, OTSG Tube ISI Refuel Outage 10 90-Day Rept | 31 August 1996 | Crystal River | OTSG Tube ISI Refuel Outage 10 90-Day Rept |
3F0896-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process | 12 August 1996 | Crystal River | Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process |
3F0896-26, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 960430 | 29 August 1996 | Crystal River | Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 960430 |
3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 | 20 August 1999 | Crystal River | Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 |
3F0904-03, Response to NRC Request for Additional Information Regarding Special Report 03-01 | 9 September 2004 | Crystal River | Response to NRC Request for Additional Information Regarding Special Report 03-01 |
3F0996-06, Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing | 11 September 1996 | Crystal River | Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing |
3F0996-13, Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc | 23 September 1996 | Crystal River | Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc |
3F1108-02, Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information | 18 November 2008 | Crystal River | Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information |
3F1202-03, Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection | 2 December 2002 | Crystal River | Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection |
3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl | 5 December 1995 | Crystal River | Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl |
BSEP-88-0609, Annual Rept of Facility Operation,Changes,Tests & Experiments for 1987 | 6 June 1988 | Brunswick | Annual Rept of Facility Operation,Changes,Tests & Experiments for 1987 |
ENS 40689 | 21 April 2004 01:10:00 | Diablo Canyon | Degraded Condition - Greater than One Percent of Steam Generator Tubes Defective |
ENS 42917 | 18 October 2006 01:00:00 | Beaver Valley | Reactor Vessel Head Nozzle Weld Area Flaw |
ENS 47833 | 21 February 2012 04:00:00 | Mitsubishi Heavy Industries, Ltd | Part 21 Interim Report - Steam Generator Tube Wear |
ENS 52734 | 8 March 2017 04:00:00 | Summerill Tube Corporation | Interim Part 21 - Unqualified Source Material for Nuclear Applications |
ENS 53749 | 21 November 2018 05:00:00 | Palisades | Degraded Condition Identified During Surface Inspection of Reactor Head Nozzle Penetration |
ENS 54994 | 11 November 2020 18:11:00 | Watts Bar | Notification of Steam Generator Tube Degradation |
HNP-02-050, Request for License Amendment Startup Test Report | 1 April 2002 | Harris | Request for License Amendment Startup Test Report |
HNP-02-124, Cycle 11, Startup Test Report Revision 1 | 19 September 2002 | Harris | Cycle 11, Startup Test Report Revision 1 |
HNP-04-060, Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval | 15 April 2004 | Harris | Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval |
HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results | 7 May 2004 | Harris | One Year Special Report, Steam Generator Tube Inspection Results |
HNP-04-083, Day Special Report, Steam Generator Tube Plugging | 27 May 2004 | Harris | Day Special Report, Steam Generator Tube Plugging |
HNP-05-088, One-Year Special Report - Steam Generator Tube Inservice Inspection Results | 1 August 2005 | Harris | One-Year Special Report - Steam Generator Tube Inservice Inspection Results |
HNP-06-026, Response to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results | 13 February 2006 | Harris | Response to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results |
HNP-07-032, License Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes | 20 August 2007 | Harris | License Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes |
HNP-08-045, Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a | 5 February 2009 | Harris | Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a |
HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program | 24 September 2009 | Harris | Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program |
HNP-10-059, Request for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval | 27 May 2010 | Harris | Request for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval |
IR 05000004/2013012 | 26 April 2012 | Catawba 05000004 | IR 05000413-012-002, 05000414-012-002; 1/1/2012 - 3/31/2012; Catawba Nuclear Station, Units 1 and 2; Flood Protection Measures |
IR 05000261/2004005 | 28 January 2005 | Robinson 07200003 | IR 05000261-04-005, IR 07200003-04-002, on 09/12/2004 - 12/31/2004, Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit 2; Emergency Preparedness |
IR 05000261/2007003 | 27 July 2007 | Robinson | IR 05000261-07-003, Carolina Power and Light Company; on 04/01/2007-06/30/2007; H.B. Robinson Steam Electric Plant, Unit 2 |
IR 05000261/2008005 | 27 January 2009 | Robinson | IR 05000261-08-005, on 10/01/2008 - 12/31/2008, H.B. Robinson Steam Electric Plant, Unit 2, Routine Integrated Report |
IR 05000261/2010003 | 28 July 2010 | Robinson | IR 05000261-10-003, on 04/01/2010 - 06/30/2010, Carolina Power and Light Company, H. B. Robinson Steam Electric Plant, Unit 2, Identification and Resolution of Problems |