Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Start dateSiteTitle
3F0388-02, Special Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl21 March 1988Crystal RiverSpecial Rept 87-05-01:two Steam Generator Tubes Found Defective,Having Indications Greater than 40% Through Wall & One Tube Identified as Degraded W/Indication of 38% Through Wall.Tubes Removed from Svc by Plugging.Addl Info Encl
3F0392-01, Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl24 March 1992Crystal RiverDiscusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl
3F0392-02, Submits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 92043030 March 1992Crystal RiverSubmits Supplemental Info Re Plans for SG Eddy Current Insps to Be Performed in Refuel 8 (8R) Outage.Outage Scheduled to Begin 920430
3F0398-06, Forwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL30 March 1998Crystal RiverForwards Response to GL 97-06, Degradation of SG Internal. Encl Contains B&Wog Integrated Response to Subject GL
3F0496-04, Submits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications8 April 1996Crystal RiverSubmits Notifications to NRC Prior to Plant Ascension Into Mode 4 Re Number of Tubes Plugged & sleeved,crack-like Indications in First Span & Assessment of Growth for First Span Iga Indications
3F0506-03, License Amendment Request 264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity25 May 2006Crystal RiverLicense Amendment Request #264, Revision 0, Application to Modify Improved Technical Specifications Regarding Steam Generator Tube Integrity
3F0508-03, Special Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 1530 May 2008Crystal RiverSpecial Report 08-01: Results of the Once-Through Steam Generator Tube Inservice Inspection Conducted During Refuel Outage 15
3F0591-11, Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications31 May 1991Crystal RiverForwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications
3F0595-05, TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld31 May 1995Crystal RiverTS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld
3F0595-07, OTSG Tube ISI Refuel Outage 9 12 Month Rept30 June 1995Crystal RiverOTSG Tube ISI Refuel Outage 9 12 Month Rept
3F0599-02, Rev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.7905 May 1999Crystal RiverRev 0 to LAR 249 to License DPR-72,proposing Alternate Repair Criteria for Axial Tube End crack-like Indications in Upper & Lower Tubesheets of Otsgs.B&Wog Proprietary Topical Rept BAW-2346P,Rev 0 Encl.Rept Withheld,Per 10CFR2.790
3F0698-25, Advises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl16 June 1998Crystal RiverAdvises That FPC May Be Requesting Enforcement Discretion or Other Regulatory Action in Near Future,Based on Review of Industry Operating Experience.Evaluation of Crystal River, Unit 3,operation W/Tube End Anomalies,Encl
3F0698-28, Application for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG18 June 1998Crystal RiverApplication for Amend to License DPR-72,exigent LAR 228,rev 0,proposing one-time Exigent License Amend to Allow Operation W/Number of Indications Previously Identified as Tube End Anomalies & Multiple Tube End Anomalies in OTSG
3F0698-33, Forwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis30 June 1998Crystal RiverForwards Util Responses to Five Topics Discussed W/Nrc on 980624 Re LAR 228,Rev 0.LAR 228 Revised to Provide Addl Info as Result of Completion of Eddy Current Testing Tube End Anomalies Data re-analysis
3F0791-06, Withdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 199218 July 1991Crystal RiverWithdraws Tech Spec Change Request 184,submitted Via .Surveillance Interval Extension for Performing Eddy Current Testing No Longer Needed Since Refuel 8 Schedule Changed from Fall 1992 to Apr 1992
3F0792-02, Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 92062910 July 1992Crystal RiverForwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629
3F0794-02, Responds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc8 July 1994Crystal RiverResponds to NRC Re Violations Noted in Insp Rept 50-302/94-11.Corrective Actions:Personnel & Equipment Certifications Were Reviewed by Nqc
3F0896-11, OTSG Tube ISI Refuel Outage 10 90-Day Rept31 August 1996Crystal RiverOTSG Tube ISI Refuel Outage 10 90-Day Rept
3F0896-14, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process12 August 1996Crystal RiverResponds to NRC Re Violations Noted in Insp Rept 50-302/96-05.C/As:operability Concern Resolution Initiated on 960515 & Problem Rept Initiated on 960526 to Document Failure to Use Corrective Action Process
3F0896-26, Responds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 96043029 August 1996Crystal RiverResponds to NRC Re Violations Noted in Insp Rept 50-302/96-05-04.C/A:rev to Tscrn 203 Submitted for NRC Approval of one-cycle TS Amend Which Addresses Indications in Question.License Amend 154 Was Issued on 960430
3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 320 August 1999Crystal RiverForwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3
3F0904-03, Response to NRC Request for Additional Information Regarding Special Report 03-019 September 2004Crystal RiverResponse to NRC Request for Additional Information Regarding Special Report 03-01
3F0996-06, Discusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing11 September 1996Crystal RiverDiscusses Concerns Re License Amend Request for Alternate Repair Criteria for SG Tubing
3F0996-13, Responds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc23 September 1996Crystal RiverResponds to Unresolved Items in Insp Rept 50-302/96-03. Corrective Actions:Tubes Containing Indications Removed from Svc
3F1108-02, Special Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information18 November 2008Crystal RiverSpecial Report 08-01; Results of the Once-Through Steam Generator Tube (OTSG) Inservice Inspection Conducted During Refuel Outage 15 - Response to Request for Additional Information
3F1202-03, Response to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection2 December 2002Crystal RiverResponse to Request for Additional Information Regarding Fall 2001 Steam Generator Inspection
3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl5 December 1995Crystal RiverForwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl
BSEP-88-0609, Annual Rept of Facility Operation,Changes,Tests & Experiments for 19876 June 1988BrunswickAnnual Rept of Facility Operation,Changes,Tests & Experiments for 1987
ENS 4068921 April 2004 01:10:00Diablo CanyonDegraded Condition - Greater than One Percent of Steam Generator Tubes Defective
ENS 4291718 October 2006 01:00:00Beaver ValleyReactor Vessel Head Nozzle Weld Area Flaw
ENS 4783321 February 2012 04:00:00Mitsubishi Heavy Industries, LtdPart 21 Interim Report - Steam Generator Tube Wear
ENS 527348 March 2017 04:00:00Summerill Tube CorporationInterim Part 21 - Unqualified Source Material for Nuclear Applications
ENS 5374921 November 2018 05:00:00PalisadesDegraded Condition Identified During Surface Inspection of Reactor Head Nozzle Penetration
ENS 5499411 November 2020 18:11:00Watts BarNotification of Steam Generator Tube Degradation
HNP-02-050, Request for License Amendment Startup Test Report1 April 2002HarrisRequest for License Amendment Startup Test Report
HNP-02-124, Cycle 11, Startup Test Report Revision 119 September 2002HarrisCycle 11, Startup Test Report Revision 1
HNP-04-060, Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval15 April 2004HarrisResponse to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval
HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results7 May 2004HarrisOne Year Special Report, Steam Generator Tube Inspection Results
HNP-04-083, Day Special Report, Steam Generator Tube Plugging27 May 2004HarrisDay Special Report, Steam Generator Tube Plugging
HNP-05-088, One-Year Special Report - Steam Generator Tube Inservice Inspection Results1 August 2005HarrisOne-Year Special Report - Steam Generator Tube Inservice Inspection Results
HNP-06-026, Response to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results13 February 2006HarrisResponse to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results
HNP-07-032, License Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes20 August 2007HarrisLicense Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes
HNP-08-045, Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a5 February 2009HarrisSecond Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a
HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program24 September 2009HarrisResponse to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program
HNP-10-059, Request for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval27 May 2010HarrisRequest for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval
IR 05000004/201301226 April 2012Catawba
05000004
IR 05000413-012-002, 05000414-012-002; 1/1/2012 - 3/31/2012; Catawba Nuclear Station, Units 1 and 2; Flood Protection Measures
IR 05000261/200400528 January 2005Robinson
07200003
IR 05000261-04-005, IR 07200003-04-002, on 09/12/2004 - 12/31/2004, Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit 2; Emergency Preparedness
IR 05000261/200700327 July 2007RobinsonIR 05000261-07-003, Carolina Power and Light Company; on 04/01/2007-06/30/2007; H.B. Robinson Steam Electric Plant, Unit 2
IR 05000261/200800527 January 2009RobinsonIR 05000261-08-005, on 10/01/2008 - 12/31/2008, H.B. Robinson Steam Electric Plant, Unit 2, Routine Integrated Report
IR 05000261/201000328 July 2010RobinsonIR 05000261-10-003, on 04/01/2010 - 06/30/2010, Carolina Power and Light Company, H. B. Robinson Steam Electric Plant, Unit 2, Identification and Resolution of Problems