Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G13 April 2009Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
IR 05000458/20090028 May 2009IR 05000458-09-002, on 01/01/2009 - 03/31/2009, River Bend StationSafe Shutdown
Unanalyzed Condition
High winds
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Tornado-Generated Missile
Significance Determination Process
Large early release frequency
Biofouling
Fire Protection Program
Incremental Core Damage Probability Deficit
Power change
Siren
IR 05000458/200900620 April 2009IR 05000458-09-006; on 02/09/09 - 03/30/09; River Bend Station; Radiation Monitoring Instrumentation and Protective EquipmentHigh Radiation Area
Offsite Dose Calculation Manual
Condition Adverse to Quality
Significance Determination Process
Annual Radiological Effluent Release Report
ML0909603956 April 2009Notice of Public Meeting to Discuss the Annual Assessment of River Bend Station
ML09132005912 May 2009Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207)
ML09154029318 June 2009Entergy Gulf States Louisiana, Llc'S Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated)
ML09154057024 June 2009Issuance of Amendment No. 163, Revise Technical Specification 3.7.5, Main Turbine Bypass SystemAnticipated operational occurrence
Feedwater Controller Failure
ML09175106224 June 2009Acceptance Review Email, Relief Request Nos. RBS-ISI-007, -008, -009, -010,and -011, Volumetric and Visual Exams, for Second 10-year Inservice Inspection Interval
ML09182075729 June 2009Non-Disclosure Agreement for a Computer Code of the United States Nuclear Regulatory Commission
NEI 03-01, Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter8 April 2009Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter
Press Release-IV-09-011, NRC Schedules Open House to Discuss the 2008 Performance of River Bend Nuclear Station6 April 2009Press Release-IV-09-011: NRC Schedules Open House to Discuss the 2008 Performance of River Bend Nuclear StationOpen House
RBG-46896, Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 21 April 2009Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2
RBG-46901, Responses to Request for Additional Information (RAI) for Main Turbine Bypass System License Amendment Request14 April 2009Responses to Request for Additional Information (RAI) for Main Turbine Bypass System License Amendment RequestFeedwater Controller Failure
RBG-46909, License Amendment Request, Main Turbine Bypass System29 April 2009License Amendment Request, Main Turbine Bypass System
RBG-46911, Radioactive Effluent Release Report for 200830 April 2009Radioactive Effluent Release Report for 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Annual Radiological Effluent Release Report
Maintenance Rule Program
Fire Protection Program
Tritium
RBG-46912, Submittal of Radiological Environmental Operating Report for 200830 April 2009Submittal of Radiological Environmental Operating Report for 2008Grab sample
Annual Radiological Environmental Operating Report
Chernobyl
RBG-46916, Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year Interval29 May 2009Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year IntervalVT-2
RBG-46922, Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-71616 June 2009Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716Safe Shutdown
Mission time
Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Flow Accelerated Corrosion
Large early release frequency
Stress corrosion cracking
Scaffolding
Thermal fatigue
Water hammer
RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval16 June 2009Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection IntervalHigh Radiation Area
Dissimilar Metal Weld
Scaffolding
RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements29 June 2009License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test RequirementsIncorporated by reference
RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements22 June 2009Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements
TAC:ME056218 June 2009
TAC:ME119812 May 2009
TAC:ME146629 May 2009
TAC:ME150816 June 2009