Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleFromTo
IR 05000369/201801012 April 2018NRC Design Bases Assurance Inspection (Team) Report 05000369/2018010 and 05000370/2018010Marvin Sykes
Division of Reactor Safety II
Duke Energy
Teresa Ray
IR 05000369/202001027 October 2020Design Basis Assurance Inspection Report 05000369/2020010 and 05000370/2020010James Baptist
NRC/RGN-II/DRS/EB2
Duke Energy
Teresa Ray
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor VesselCrutchfield D
Office of Nuclear Reactor Regulation
Information Notice 1996-08, Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate Valve5 February 1996Thermally Induced Pressure Locking of a High Pressure Coolant Injection Gate ValveCrutchfield D
Office of Nuclear Reactor Regulation
Information Notice 1996-49, Thermally Induced Pressurization of Nuclear Power Facility Piping20 August 1996Thermally Induced Pressurization of Nuclear Power Facility PipingMartin T
Office of Nuclear Reactor Regulation
Information Notice 1997-07, Problems Identified During Generic Letter 89-10 Closeout Inspections6 March 1997Problems Identified During Generic Letter 89-10 Closeout InspectionsMartin T
Office of Nuclear Reactor Regulation
ML13073A04116 May 2013Issuance of Amendments Regarding Measurement Uncertainty Recapture Power UprateBoska J
Plant Licensing Branch II
Duke Energy
Capps S
ML20093D39811 April 2019Updated Final Safety Analysis Report, Chapter 3Duke EnergyOffice of Nuclear Reactor Regulation
ML20116E77131 July 1996Responds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate ValvesDuke Energy
Mcmeekin T
Office of Information Resources Management
ML20134G1663 February 1997Forwards Suppl Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate ValvesDuke Energy
Barron H
Office of Information Resources Management
ML20134L14610 February 1997Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant SupportNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
ML20140H58011 June 1997Provides Update to Corrective Actions Completed During Recent Unit 1 Outage in Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate ValvesDuke Energy
Barron H
Office of Information Resources Management
ML20206N35111 May 1999Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related MovsNRC (Affiliation Not Assigned)
ML20211E67522 September 1997Forwards Safety Evaluation Supporting DPC Submittals, ,960731,970611 & 970203 Responding to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate ValvesNRC (Affiliation Not Assigned)
Nerses V
Duke Energy
Barron H
ML20211E68722 September 1997SER Accepting DPC Responses to GL-95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate ValvesNRC (Affiliation Not Assigned)
ML20247P81220 May 1998Informs That Plant Plans to Replace Valves 1NI0009A & 1NI0010B During Unit 1,Cycle 13 Outage.Replacement Will Eliminate Pressure Locking ConcernDuke Energy
Barron H
Office of Information Resources Management
ML20309A7478 October 20202 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and SystemsDuke EnergyOffice of Nuclear Reactor Regulation
NRC Generic Letter 1995-0717 August 1995NRC Generic Letter 1995-007: Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate ValvesCrutchfield D
Office of Nuclear Reactor Regulation