Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02240046019 August 2002Reed College, Request for Original Ltr. of Credit Document
ML02290024525 September 2002Reed College Reactor'S Annual Report for September 1, 2001 to August 31, 2002Deep Dose Equivalent
ML03045042831 January 2003Reed Reactor Facility, Request for Technical Specification Amendment, Change Wording to Allow Using Different Installed Nuclear Instrument for InterlockShutdown Margin
ML03078077412 March 2003Reed College - Request for Technical Specification AmendmentShutdown Margin
ML0323205145 August 2003Apparent Reed Reactor Technical Specification Violation
ML0329504429 October 2003Transmittal of Reed College Reactor'S Annual ReportDeep Dose Equivalent
ML04078023529 October 2003Cover Ltr. for Updated Site-Specific Compensatory Measures Plan for the Reed College Reactor
ML04078024119 February 2004Letter Transmitting Updated site-specific Compensatory Measures Plan for the Reed College Reactor
ML04124042019 February 2004Letter Forwarding Revision to Reed'S Reactor Physical Security Plan
ML04212020712 July 2004Letter Regarding Revision of Scheduling Program to Minimize the Failure to Complete a Shutdown Checklist Chances of a Reoccurrence of Event
ML04212021712 July 2004Letter Regarding Internal Review of the Reed Reactor Facility Which Discovered That Standard Operating Procedures Were Not Consistent with the Wording of 10CFR50.54(m)(1)
ML04362031016 December 2004Transmittal of Reed College Reactor'S Annual ReportDeep Dose Equivalent
ML05110031324 January 2005Letter Covering Two Apparent Violations of Technical Specifications During the Past Few Weeks
ML05222024827 July 2005Reed College Submission of Answer within 20 Days of the Issuance of the Generic Order (EA-05-007) That Was Dated July 19, 2005 and Issued by Mr. J. E. Dyer, Director, Office of NRR
ML05293019412 October 2005Reed Research Reactor Annual ReportDeep Dose Equivalent
ML0628505182 October 2006Submittal of Reed College Reactor'S Annual Report for September 1, 2005 - August 31, 2006Deep Dose Equivalent
ML07205030517 July 2007Transmittal of Revision to Physical Security Plan for Reed Research Reactor
ML07240056920 August 2007Request Closure of Confirmatory Action Letter Since Associated Commitments Incorporated in Security Plan
ML07304019122 October 2007Letter Submitting Reed College Reactor'S Annual Report for September 1, 2006 - August 31, 2007Deep Dose Equivalent
ML07309064819 October 2007Submittal of Reed College Reactor Facility Requalification Plan, October 2007Fitness for Duty
ML08226037731 July 2008Reed College - Ltr. to Report Apparent Violation of Reed Research Reactor License and Technical Specifications That Occurred on July 24, 2008
ML08289053326 September 2008Submittal of Reed College Reactor'S Annual Report for September 1, 2007 - August 31, 2008Deep Dose Equivalent
ML09176009718 June 2009Reed College, Submittal of Technical Specification Amendment RequestShutdown Margin
ML09272086522 September 2009Reed College Reactor'S Annual Report, September 1, 2008 -- August 31, 2009Deep Dose Equivalent
ML10033028926 January 2010Reed College Amendment of License Renewal Application, Submitted in 2007 for Relicensing at a Power Level of 250 Kilowatts Thermal
ML1005701786 February 2010Reed College Request for 60-day Extension to Respond to RAI TAC No. ME1583
ML10061012126 January 2010Reed College Request for Amendment to License Renewal Application Submitted in 2007 for Relicensing at Power Level of 250 Kilowatts Thermal
ML10061013024 February 2010Reed College Request for 60-Day Extension on Time to Respond to RAI TAC No. ME1583
ML10082043815 March 2010Response and Attachments to RAI TAC No. ME1583
ML10082043911 March 2010Letter from Reed College Continue Funding of Decommissioning Activities for Triga Mark I Research Reactor
ML10117005919 April 2010Letter from Reed College Enclosed Self Guarantee Letter Requested by the RAI Dated December 10, 2009Decommissioning Funding Plan
ML1013106025 May 2010Reed College - Request for Extension on Time to Respond to RAI Re TAC ME1583, Dated March 8, 2010
ML10153020925 May 2010Reed College Corrected Self Guarantee Letter Required by RAI TAC No. ME1583 Dated December 10, 2009Decommissioning Funding Plan
ML10159051328 May 2010Reed College - Request for License Amendment to Increase the Possession Limit for U-235
ML1019403246 July 2010Response to Request for Additional Information for TAC No. ME1583
ML1020103828 July 2010Change of Management Staff Update
ML10210018922 July 2010Reed College Ltr. Answers to RAI TAC No. M79578 Dated April 8, 2010 Regarding Reed Research Reactor Requalification PlanFitness for Duty
ML10236001630 July 2010Reed Response to Request for Additional Information with a Revised Safety Analysis Report and Technical SpecificationsSafe Shutdown
Shutdown Margin
High Radiation Area
Emergency Lighting
Earthquake
Fuel cladding
ML10237118118 August 2010Transmittal of Response to Request for Additional Information Regarding Request for Self-Guarantee Pursuant to 10 CFR Part 50, 10 CFR Part 70 and NUREG/1757, Vol. 3
ML10244004223 August 2010Reed College, Submittal of Reactor'S Annual Report for September 1, 2009 - June 30, 2010Deep Dose Equivalent
ML1028610795 October 2010Reed College, Submittal of Decommissioning Costs for Research Reactor in 2010
ML10299048915 October 2010Reed College Research Reactor Submittal of Proposed Technical Specifications for Relicensing, in Partial Response to RAI TAC No. ME1583, Dated March 8, 2010Shutdown Margin
ML10300012621 October 2010Reed College, Reply to RAI TAC No. ME4086 Dated September 27, 2010Shutdown Margin
ML10306046126 October 2010Reed College - Requests for an Additional Extension to Respond to RAI TAC No. ME1583, Dated March 8, 2010, Until December 31, 2010
ML1031601005 November 2010Submittal of Reed College Updated CFO Letter and Self-Guarantee Letter with Updated Decommissioning CostsDecommissioning Funding Plan
ML10334051422 November 2010Reed College Submittal of Self-Guarantee Letter with the Updated Decommissioning CostsDecommissioning Funding Plan
ML10361028717 December 2010Reed College - E-mail from Stephen Frantz, Reed College to Alexander Adams, Project Manager for NRC Regarding a Type Correction in the Application for Possession Limit Increase (Tac No. ME4086)
ML1100400023 January 2011Reed College, E-mail from Stephen Frantz, Reed College to Alexander Adams, PM at NRC Reed License Amendment No. 8 Special Nuclear and Byproduct Material Possession Limits (Tac No. ME4086)
ML11130A10919 April 2011Reed College, Notification of Responses to RAI TAC No. ME1583 by June 15, 2011
ML11152055920 May 2011Reed College - Responses to RAIs Dated May 20, 2011 - Redacted Version (ME1583)Shutdown Margin
Fire Barrier
Deep Dose Equivalent