Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02085060315 March 2002Special Report 2002-01 GT-RT-21B Radiation Monitor Inoperable
ML0407105794 March 2004Special Report Regarding Inoperable Channel 12 of the Loose Parts Detection System (Lpds)
ML04217029128 July 2004Special Report, Meteorological Tower 10M - 60M at Wind Direction Indication Inoperable
ML0426104293 September 2004Special Report: Meteorological Tower 10M - 60M T Indication Inoperable
ML0516702029 June 2005Special Report Meteorological Tower 10-60M Air Temperature Delta-T InoperableMet Tower
ML22300A08227 October 2022Special Report 2022-03, Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days
ML23080A29321 March 2023Enclosure - Special Report 23-02
ULNRC-04834, Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons8 April 2003Facility Operating License NPF-30 10 CFR 50.46 Thirty Day Report ECCS Evaluation Model Revisons
ULNRC-05089, Special Report on the Inoperability of Unit Vent High Range Radiation Monitor10 November 2004Special Report on the Inoperability of Unit Vent High Range Radiation Monitor
ULNRC-05187, Inoperable Channel 3 of the Loose Parts Detection System (Lpds)11 August 2005Inoperable Channel 3 of the Loose Parts Detection System (Lpds)
ULNRC-06542, SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days18 November 2019SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days
ULNRC-06618, Special Report 2020-0112 November 2020Special Report 2020-01
ULNRC-06668, Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days8 July 2021Special Report 2021-01 - Callaway Plant, Unit 1, Non-Functional Seismic Instrument for Greater than 30 Days
ULNRC-06708, Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days11 January 2022Special Report 2022-01, Non-Functionality of Loose Parts Monitoring Channel for Greater than 30 Days
ULNRC-06724, 30-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant16 March 202230-Day Report for Unsatisfactory Performance by an HHS Laboratory for Ameren Missouri Callaway Plant
ULNRC-06745, Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days10 May 2022Special Report 2022-01: Inoperability of a Seismic Instrument for Greater than 30 Days
ULNRC-06850, Special Report 2023-03 Pam Report Inoperability of a Post Accident Monitoring (Pam) Instrument21 December 2023Special Report 2023-03 Pam Report Inoperability of a Post Accident Monitoring (Pam) InstrumentPost Accident Monitoring