Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML18081B3356 April 1979Objections by Util to Portions of Intervenor Miami Valley Power Project'S 790319 Second Set of Interrogatories.Also Seeks Protective Order
ML19208D51631 July 1979Response Objecting to Applicant Supplemental Response Filed in Opposition to City of Cincinnati Motion to Amend Petition to Intervene.Urges Admittance of Contentions 18 & 19,as Amended.Certificate of Svc Encl
ML19208D61824 July 1979Motion to Quash Applicants Subpoena Served on D Blanch.Party Served Has Shown Unwillingness to Participate as Witness. If Subpoena Is Not Quashed,Terms Mod Re Time of Deposition Is Requested.Certificate of Svc Encl
ML19209A9861 August 1979Answer in Opposition to Applicant Renewed Motion for Summary Disposition of DB Fankhauser Contention 5 Re Transportation Accidents.Applicant Failed to Demonstrate That Transportation Plans Have Been Made.W/Proof of Svc
ML19209B14524 August 1979Motion Requesting Evening Hearings.Petitioner Is Carrying Out Intervention Activities on Volunteer Time & Daytime Hearings Would Cause Economic Hardship
ML19209B14724 August 1979Motion to Reopen Discovery for Contention 13 Dealing W/ Applicants Financial Abilities to Build & Operate Facility. Costs of Facility Have Recently Increased by $186 Million. Nature & Effects of Addl Costs Should Be Investigated
ML19209B15024 August 1979Motion for Full Disclosure of Basis on Which Applicants Schedule & Cost Estimates Were Revised Re Applicants 790730 Announcement Advising That Loading Will Be Delayed & Costs Will Be Increased.Info Needed for Hearing on Contention 13
ML19209C1347 September 1979Answer to Miami Valley Power Project 790824 Motion to Reopen Discovery Re Contention 13 & to Miami Valley 790824 Motion for Full Disclosure.Motion for Disclosure Lacks Merit & Should Be Denied.Discovery Should Be Controlled If Reopened
ML19209C1367 September 1979Response in Opposition to Miami Valley Power Project 790824 Motion to Schedule Evidentiary Hearings During Evening Hours.Does Not Oppose Extension of Day Hours Into Evening. W/Certificate of Svc
ML19209C47714 September 1979Response in Support of NRC 790911 Motion to Strike Miami Valley Power Project Contention 17 Re Fire Protection of Cable Trays.Terminates All Related Discovery.Also Supports Motion to Vacate Hearing Date.W/Certificate of SvcIncorporated by reference
ML19210E82210 November 1979Memorandum & Motion to Continue Evidentiary Hearings Until Congress Either Affirms Status of NRC or Creates New Regulatory Agency Charged W/Granting Ols.Certificate of Svc Encl
ML19210E85427 November 1979Objection to Intervenor Miami Valley Power Project 791109 Interrogatories Re Contention 13 & Request for Protective Order.Requested Info Outside Scope of Issues Determined by Aslb.Certificate of Svc Encl
ML19211D0288 January 1980Motion for Dismissal of Intervenor Miami Valley Power Project Contention 13 Re Applicant Financial Qualifications. Intervenor Failed to Respond to 791121 Interrogatories. Certificate of Svc Encl
ML19224D1279 June 1979Cincinnati Gas & Electric Motion to Strike Intervenor DB Fankhauser 790601 Testimony for June Hearing.Fankhauser Comments & Conclusions Are Argumentative & Unsupported by Law or Facts.Certificate of Svc Encl
ML19224D33916 May 1979Miami Valley Power Project Motion to Allow non-atty Members of Miami Valley Power Project to Appear & Participate in Hearings
ML19225A4018 June 1979Miami Valley Power Project Memo in Support of Motion to Allow Hearing Participation by Parties Other than Attys
ML19241A9349 May 1979Miami Valley Power Project Objections to Certain of NRC 790420 Interrogatories.Protective Order Should Be Granted as Interrogatories 14,25 & 42,re Summary Request of Expert Testimony,Have Effect of Moving Deadline Ahead
ML19241A9519 May 1979Miami Valley Power Project Objections to Certain of Cincinnati Gas & Electric 790420 Fifth Set of Interrogatories.Protective Order Should Be Granted Re Interrogatories 17 & 23 as Being Irrelevant & Burdensome
ML19242A4433 May 1979Cincinati Gas & Electric Opposition to Intervenor Miami Valley Power Project 790420 Request to Inspect Facility on 790512 Re Control Rod,Control Rod Seals,Cable Trays & Related Matters.Certificate of Svc
ML19246B0579 May 1979Cincinnati Gas & Electric Opposition to Intervenor Miami Valley Power Project Motion to Amend Petition to Intervene. Certificate of Svc Encl
ML19247B24516 July 1979Applicant Supplemental Response to City of Cincinnati Motion to Amend Petition for Intervention.Original Applicant Response Was Filed on 790604.Urges Contentions 18 & 19 Be Denied.Certificate of Svc Encl
ML19249D6007 August 1979Motion to Delay Facility Fuel Delivery Scheduled in Aug 1979.Delivery Date Is 11 Months Prior to Scheduled Fuel Loading Date of 800715.No Need to Bring Fuel on Site So Far in Advance.Certificate of Svc Encl
ML19249D70225 July 1979Renewed Motion for Summary Disposition W/Respect to DB Fankhauser Contention 5 Or,In the Alternative,For Certification of Question.Certificate of Svc Encl.First Motion Filed on 790406
ML19249D70726 July 1979Response to Miami Valley Power Project 790424 Motion to Quash Applicant Subpoena for D Blanch.Since Subpoena Was Not Served,Applicants Will Pursue Discovery If Witness Is Subsequently Offered.Certificate of Svc Encl
ML19249E1642 August 1979Motion to Strike Intervenor City of Cincinnati Reply Brief to Applicant Opposition Filed in Response to Intervenor Contentions 18 & 19 Re Transmission of Air Monitoring Data. Reply Brief Is Unauthorized.Certificate of Svc Encl
ML19256E24721 September 1979Motion for Summary Disposition Re Contention 17
ML19256E25421 September 1979Statement of Matl Facts as to Which There Is No Genuine Issue to Be Heard Re Contention 17.Provisions,program & Design of Fire Protection & Cable Trays Are Qualified to Guarantee SafetyFire Protection Program
ML19256E25921 September 1979Memorandum in Support of Motion for Summary Disposition Re Contention 17 on Fire Protection.Cable Protection,Insulation Matls & Other Design Measures Have Been Taken to Assure Safety in Compliance W/Fire Protection Evaluation ReptFire Protection Program
ML19256E26721 September 1979Further Motion to Vacate ASLB 790910 Order Scheduling 791024-26 Evidentiary Hearing Re Contention 17 on Cable Trays Fire Protection.Ms Abrams Will Not Be Available. Suggests Rescheduling Hearing in Nov.W/Certificate of SvcIncorporated by reference
Fire Protection Program
ML19256E52116 October 1979Motion for Reconsideration of ASLB 791001 Memorandum & Order Denying Dismissal or Summary Disposition of Contention 17 Re Fire Protection.Urges ASLB Obtain cross-examination Outline from Miami Valley Power Project.W/Certificate of Svc
ML19257B68228 December 1979Petition by City of Mentor,Ky to Participate in Proceeding. Questions Adequacy of Emergency Planning & Preparedness & Other Related Issues.Knowledge of Ky Community Demography & Geography Should Assist Aslb.Certificate of Svc Encl
ML19257B68711 January 1980Answer in Opposition to City of Mentor,Ky 791228 Petition to Participate in OL Proceeding.If Admitted,City of Mentor Participation Should Be Limited to Issue of Emergency Planning.Certificate of Svc Encl
ML19259C00216 May 1979Petition Seeking Suspension of Hearing on OL Application Until Envestigation of TMI Is Completed & Released to Public
ML19259C44530 April 1979Motion by Intervenor Miami Valley Power Project to Amend Petition to Intervene.Seeks Addition of Contention 17 Re Evidence of Safety Problems.Certificate of Svc Encl
ML19259C44730 April 1979Amend by Intervenor Miami Valley Power Project to Petition to Intervene.Proposed Contention 17 Re Fire Insulation Matl Used in Cable Trays for Protection Asserts Insulation Is Inadequate & Tests Are Improperly Performed
ML19261D8954 June 1979Applicant Response to City of Cincinnati Motion to Amend Petition to Intervene.New Contentions Broaden Issues & Should Not Be Admitted.Certificate of Svc Encl
ML19261E31710 May 1979Motion by Intervenor City of Cincinnati for Continuation of Hearing Until TMI Investigation Completed.Accident at TMI Challenges Current Safety Concepts.Certificate of Svc Encl
ML19263B5222 January 1979State of Il Contentions Re Amends to Operating License for Transport of Spent Fuel Between Units.Contentions Assert Applicant'S Submittals Are Insufficient.W/Affidavit & Certificate of SvcIncorporated by reference
ML19263B5296 December 1978NRDC & Citizens for a Better Environ Contentions Re Util'S License Amend Re Transport of Spent Fuel Between Units. Asserts Proposed Action Violates NEPA
ML19263C63329 January 1979Motion by Applicant to Dismiss Miami Valley Power Project as Party to Proceeding,Due to Failure to File Timely Response to Interrogatories.Urges,In Alternative,That Response Be Compelled.Certificate of Svc Encl
ML19263E3236 April 1979Util Request That ASLB Grant Summary Disposition of Encl Statement of Matl Facts
ML19263E32510 April 1979Statement of Matl Facts as to Which There Is No Genuine Issue to Be Heard
ML19263E87214 May 1979Objection by Util to Intervenor Miami Valley Power Project 790420 Third Set of Interrogatories.Seeks Protective Order Re Objectionable Discovery & Proprietary Info.Certificate of Svc Encl
ML19268B88230 May 1979Applicant Opposes Miami Valley Power Project Motion to Allow Participation of non-attys in Hearing.Should Be Denied as Matter of Policy & Per NRC Rules of Practice.Notice of Appearance,Documentation & Certificate of Svc Encl
ML19269E3802 May 1979Opposes Applicant 790406 Motion for Summary Judgment Re Intervenor D Fankhauser Contention.Disputes Applicant Assertions Re Water Monitoring.Affidavit & Certificate of Svc Encl
ML19269E71718 May 1979Motion to Amend Petition to Intervene & Admit Addl Contentions Re Insufficiency of Radiological Air Monitoring Program Proposed by Applicant.Affidavit & Certificate of Svc Encl
ML19270G43223 April 1979Statement of Matl Facts as to Which There Is No Genuine Issue to Be Heard.W/Affidavits & Qualifications of RP Wiwi, WR Kelley,Ah Hill,Kk Chitkara,Wh Zimmer,Jm Emery & Pl Anderson.Certificate of Svc Encl
ML19270G43423 April 1979Util Supplemental Memo in Support of Summary Disposition Re Intervenor Miami Valley Power Project Contentions 11,12 & 13Incorporated by reference
ML19273B6131 May 1979Intervenor,D Fankhauser Response in Opposition to Applicant Summary Motion.Affidavit & Certificate of Svc Encl
ML19274E8539 March 1979D Fankhauser'S Response to Proposed Time Table of Events. Certificate of Svc Encl