Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19250E05616 March 1981Acceptance Review Copy of Amend 25 to OL Application, Consisting of Fsar,Emergency Plan,Environ Rept,Fire Protection Rept & Probabilistic Risk AssessmentProbabilistic Risk Assessment
ML19325D29110 October 1989Application for Amend to License NPF-85,consisting of Tech Spec Change Request 89-11,changing Tech Spec Surveillance Requirement,Section 4.7.4.b, Plant Sys,Snubbers,Visual Insp.
ML19327A88911 October 1989Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Request 89-09,specifying Number of Suppression Chamber to Drywell Vacuum Breaker Pairs Required to Be Operable
ML19327B9363 November 1989Application for Amend to License NPF-85,consisting of Tech Spec Change Request 88-08,revising Tech Specs to Reflect Removal of Organizational Charts as Recommended by Generic Ltr 88-06Offsite Dose Calculation Manual
ML20005E78629 December 1989Application for Amend to License NPF-39,consisting of Tech Spec Change Request 89-08,revising Time Period for Reactor Pressure Vessel pressure-temp Operating Limit Curves,In Tech Spec Section 3/4.4.6,per Generic Ltr 88-11
ML20006D93429 January 1990Application for Amend to License NPF-85,consisting of Tech Spec Change Request 89-02.Amend Allows Required Source Range Monitor Count Rate to Be Reduced While Ensuring That Design Level of Counting Certainty Maintained.Ge Rept Also Encl
ML20010J47730 September 1981Amend 27 to Application for Ol,Consisting of Sept 1981 Plant Security,Personnel Training & Qualification Plan.Plan Withheld (Ref 10CFR2.790)
ML20011F65423 February 1990Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Request 89-13,removing cycle- Specific Parameter Limits from Tech Specs Per Guidance Contained in Generic Ltr 88-16
ML20012E49220 March 1990Application for Amend to License NPF-39,consisting of Tech Spec Change Request 89-06,making Administrative Changes to Eliminate Differences Between Units 1 & 2 Tech Specs
ML20023A86418 October 1982Application for Amend 40 to OL Application,Consisting of Revision 11 to Fsar.Certificate of Svc Encl
ML20024A92627 June 1983OL Application Consisting of Rev 21 Page Changes to FSAR & Rev 4 Page Changes to Design Assessment Rept
ML20028B67129 November 1982Amend 42 to Application for Ol,Revising FSAR
ML20028F20926 January 1983Amend 45 to OL Application,Consisting of Rev 2 to Fire Protection Evaluation Rept & Rev 16 to Fsar.Certificate of Svc Encl
ML20029D43727 April 1994TS Change Request 94-14-0 to Licenses NPF-39 & NPF-85, Deleting SR 4.4.1.1.1,requiring That Reactor Recirculation Pump Discharge Valve Be full-stroke Tested Prior to Reactor Power Exceeding 25% of Rated Reactor Thermal Power
ML20039D28128 December 1981Amend 28 to Application for Ols,Containing Revision 2 to FSAR
ML20043A36216 May 1990Application for Amend to License NPF-39,changing Tech Spec Requirement 4.7.4b to Permit one-time Extension of Snubber Visual Insp Period Until End of Upcoming Refueling Outage, Currently Scheduled to Begin in Sept 1990
ML20043D2111 June 1990Application for Amend to License NPF-39,consisting of Tech Spec Change Request 90-05-1,deleting Ref to Water Temp at Suction of RHR Pump for Suppression Pool Water Temp Indication at Remote Shutdown PanelSafe Shutdown
ML20043D81429 May 1990Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Specs Change Request 89-07 to Relocate Radiological Effluent Tech Specs to ODCM or Process Control Program,Per Generic Ltr 89-01Offsite Dose Calculation Manual
Process Control Program
ML20043H07114 June 1990Application for Amend to License NPF-39,consisting of Tech Specs Change Request 90-01-1,requesting Revs to Tech Spec Section 3.6.3, Primary Containment Isolation Valves Replacing 1,300 Hydraulic Control Unit Isolation BoundariesScram Discharge Volume
ML20044A11022 June 1990Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Requests 90-03-0 & 90-04-0 Re Surveillance Requirements for Refueling Platform Main & Auxiliary Hoists
ML20044B11311 July 1990Application for Amend to License NPF-39,consisting of Tech Spec Change Request 90-06-1,revising Tech Spec Table 3.6.3-1 to Add New Outboard Primary Containment Isolation ValveSafe Shutdown
ML20044B26713 July 1990Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Tech Spec Change Request 89-15-0,changing Tech Spec Section 6.0 to Add New Section 6.5.3 Re station- Qualified Reviewer Program
ML20046A38716 July 1993Application for Amends to Licenses NPF-39 & NPF-85 Requesting TS to Allow Dual Role Sro/Sta PositionSafe Shutdown
ML20050B94629 March 1982Amend 29 to Application for Ol,Revising Pages to FSAR & Fire Protection Evaluation Rept & Incorporating Design Assessment Rept.Certificate of Svc Encl
ML20052C5344 May 1982Amend 32 to License Applications for Facilities
ML20052G66413 May 1982Amend 33 to Application for OL Consisting of Revision 5 to FSAR
ML20053D2482 June 1982Amend 34 to Application for Ol,Consisting of FSAR Revision 6 Per NRC 820308 & 0312 Ltrs
ML20054C41115 April 1982Application for Amend 31 to OL Application,Substituting Revised Cover Page,Title Page,Page 1-4 & Pages 12 & 16 of Safeguards Contingency Plan
ML20054L32625 June 1982Amend 35 to Application for Ol,Consisting of Revision 7 to Fsar,Revision 2 to Emergency Plan & Proprietary Version of Vol 3 of Design Assessment ReptAffidavit
ML20056D3363 August 1993Application for Amend to License NPF-39,removing Remote Shutdown Sys Control Valves & Primary Containment Isolation Valves from TS 3.3.7.4-1 & 3.6.3-1
ML20056G48627 August 1993TS Change Request 92-08-0 to Licenses NPF-39 & NPF-85, Revising TS Re Calculated Peak Fuel Cladding Temp.Ge Proprietary Repts NEDC-32193P,Rev 1 & NEDC-32170P,Rev 1 Encl in Support of Change Request.Repts Withheld Per 10CFR2.790Anticipated operational occurrence
MELLLA
Fuel cladding
Flow Induced Vibration
ML20056G48725 August 1993TS Change Request 93-01-0 to Licenses NPF-39 & NPF-85, Revising TS Surveillance Requirement 4.5.1 to Reduce Frequency for Venting ECCS Piping from Every 31 Days to Every 6 Months
ML20056G56227 August 1993Application for Amend to License NPF-85,consisting of TS Change Request 93-14-2,extending AOT for RHR Svc Water Sys as Well as Suppression Pool Spray & Suppression Pool Cooling Modes of RHR to 288 HSafe Shutdown
Probabilistic Risk Assessment
Fire Watch
ML20056G87425 August 1993TS Change Request 93-11-0 to Licenses NPF-39 & NPF-85, Revising TS Section 3.3.7.8.2 & Associated Bases 3/4.3.7.8 Re Main Control Room Toxic Gas Detection Sys
ML20056H12325 August 1993TS Change Request 92-13-0 to Licenses NPF-39 & NPF-85, Modifying SR 4.7.1.3 to Require That All Spray Pond Spray Network Piping Above Frost Line Be Drained within One H After Being Used Only When Ambient Air Temp Below 40 FSafe Shutdown
Ultimate heat sink
ML20058B36619 October 1990Revises 900529 Application for Amends to Licenses,Consisting of Rev to TS Change Request 89-07 Re Rets,Per Generic Ltr 89-01
ML20058C56417 November 1993Tech Spec Change Request 92-08-0 to Licenses NPF-39 & NPF-85 to Reflect Expanded Operating Domain for Facility, Resulting from Proposed Implementation of APRM-RBM Ts/Max Extended Load Line Limit Analysis.Proprietary Rept Encl
ML20058G87230 November 1993TS Change Request 93-20-1 to License NPF-39,revising SR 4.6.1.2.a on one-time Bases to Permit Type a Test,Presently Required to Be Performed During Fifth Unit 1 Refueling Outage,To Be Extended to Sixth Unit 1 Refueling OutagePacking leak
Exemption Request
ML20058G90030 November 1993TS Change Request 93-07-0 to License NPF-39 & NPF-85, Revising SR 4.6.2.1.d to Extend Surveillance Interval of Primary Containment drywell-to-suppression Chamber Bypass Leak Test
ML20058L4489 December 1993Change Request 93-24-0 to Licenses NPF-39 & NPF-85 for Planned Implementation of Power Rerate Program at Plant.Ge Proprietary Rept NEDC-32225P, Power Rerate SAR for Lgs... Encl.Proprietary Rept NEDC-32225P Withheld,Per 10CFR2.790Safe Shutdown
Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Feedwater Controller Failure
ML20059G35010 January 1994Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 93-16-0,relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Bases in TS 3.3.7.2 & 4.3.7.2 to Updated FSARProbabilistic Risk Assessment
Design basis earthquake
Pressure Boundary Leakage
ML20059G90529 October 1993TS Change Request 91-03-0 to Licenses NPF-39 & NPF-85, Revising TS to Eliminate Main Steam Line Radiation Monitoring Sys High Radiation Trip Function for Initiating & Automatic Closure of Main Steam Line Isolation Valves
ML20059K57214 January 1994Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 93-18-0,revising TS to Permit Increase in Allowable Leak Rate for MSIV & to Delete MSIV Leakage Control SysSafe Shutdown
Seismically rugged
Design basis earthquake
Earthquake
ML20059K58714 January 1994TS Change Request 93-19-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 5.5.1.1, Criticality & 5.5.3, Capacity to Support Implementation of Mod to Install New High Density Spent Fuel Storage Racks in Each SFPsSafe Shutdown
Time to boil
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Control of Heavy Loads
Fuel cladding
ML20063F08730 August 1982Amend 37 to License Application,Changing FSAR to Respond to NRC & Changing Emergency Plan to Respond to NRC
ML20063H13927 July 1982Amend 36 to License Application,Reflecting Changes Made by Revision 4 to Environ Rept & Revision 8 to FSAR
ML20063K18831 August 1982Amend 38 to Application for Ol.Certificate of Svc Encl
ML20065A85524 March 1994Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 92-19-0,revising TS to Support Change in Frequency for Submitting Semiannual Effluent Release Rept to NRC from Semiannually to AnnuallyOffsite Dose Calculation Manual
Process Control Program
ML20065E51028 March 1994Application for Amends to Licenses NPF-39 & NPF-85, Increasing Surveillance Interval for Functional Test of RPS Electrical Power Monitoring Channels,Contained in TS 4.8.4.3.a
ML20065G84328 September 1982Amend 39 to Application for Ol,Consisting of Revision 10 to Fsar,Proprietary & Nonproprietary Revision 1 to Design Assessment Rept & Revision 6 to Environ Rept.Certificate of Svc Encl.Proprietary Design Rept Withheld (Ref 10CFR2.790)