Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line ML20084Q9241995-06-0505 June 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 94-49-0,revising TS Section 3/4.1.5, SLCS to Remove Min Flow Rate Requirement for SLCS Pumps ML20083R0031995-05-19019 May 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Change Request 95-02,revising TS Table 3.3.3-3, ECCS Response Times to Reflect Value of 60 Seconds for HPCI Sys Response Time Instead of 30 Seconds ML20082J4001995-04-0606 April 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Requests 94-51 Delete Independent Tech Review Section from TS, 94-52 Delete Nrb Review Section from TS, 94-53 Delete Nrb Audit Section from Ts 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20247M6891998-05-14014 May 1998 Amend 128 to License NPF-39,documenting NRC Staff Approval of Implementation of Plant Mod to Support Installation of Replacement Suction Strainers for ECCS at Plant,Unit 1 ML20217Q5001998-05-0404 May 1998 Amend 127 to License NPF-39,revising Minimal Critical Power Ratio Safety Limits for Operation Cycle 8 ML20217M0731998-03-31031 March 1998 Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively, Revising LGS Units 1 & 2 TS Section 4.0.5 & Bases Sections B 3/4.4.8 Re Surveillance Requirements Associated W/Isi & IST ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line 1999-09-27
[Table view] |
Text
4,
- Station Support Deptrimsnt
' ' . 10 CFR 50.90
=s e" PECO ENERGY " = ~ c- -
m cwu crmp naadauan m
$#.$ CheStH(bf tXth nduleVJM.l Wayne. PA 19087 6691 March 24,1994 Docket Nos. 50 352 50-353 License Nos. NPF 39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request Gentlemen:
PECO Energy Company is submitting Technical Specifications (TS) Change Request No.
92-19-0, in accordance with 10 CFR 50.90, requesting an amendment to the TS (Appendix A) of Operating Ucense Nos. NPF-39 and NPF-85 for Limerick Generating Station, Units 1 and 2, respectively. This proposed TS change involves revising the TS to support a change in the frequency for submitting the Semlannual Radioactive Effluent Release Report to the NRC from semiannually to annually. Information supporting this TS Change Request is contained in Attachment 1 of this letter, and the proposed replacement pages for the LGS, Units I and 2, TS area contained in Attachment 2.
We request that, if approved, the amendments to the LGS, Units 1 and 2, TS be effective immediately upon issuance of the amendments.
if you have any questions, please do not hesitate to contact us.
Very truly yours,
, 1 G. A. Hunger, Jr.
Director .
Licensing Section Attachmants cc: T. T. Martin, Administrator, Region I, USNRC (w/ attachments)
N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments)
W. P. Dornsife, Director, PA Bureau of Radiation Protection (w/ attachments) 010 0~c. o s a 9404010092 940324
[
PDR .ADOCK 05000352 ,;
.p PDR t. ,
COMMONWEALTH OF PENNSYLVANIA:
- ss.
COUNTY OF CHESTER -
D. R. Helwig, being first duly swom, deposes and says:
That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the foregoing Technical Specifications Change Request No.92-194) for Umerick Generating Station Units 1 and 2, Facility Operating Ucense Nos. NPF-39 and NPF-85, to change the frequency for submitting the Semlannual Radiological Effluent Release Report from somlannually to annually, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
t ,
Vice President )
l Subscribed and sw to before me thish day ;
of 'htAvbj994.
1 J/} ef n// Notary Public m
l NotxulSed Eta A SxitoqJJot.w Pat /c hQt:nhp CNWsCCunty My Conmm Egens Aty 10,itV6 i
b_
.. . .~ .. - - . _. ..
f i
ATTACHMENT 1 LIMERICK GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-352 50-353 LICENSE NOS. NPF-39 N PF-85 i
i
'l TECHNICAL. SPECIFICATIONS CHANGE REQUEST No. 92-19-0 l
- Revise Technical Specifications to Support Change in the Frequency for .I Submitting the Semiannual Radioactive Effluent Release Report to j the NRC from Semian tually to Annually" I i
Supporting information for Changes - 3 pages l
'l I
- u. ..
Attachment 1 -
~ Page~ 1 PECO Energy Company, Licersee under Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station, Units 1 and 2, respectively, requests that the Technical .
Specifications (TS) contained in Appendix A to the Operating Licenses be amended as proposed herein, to revise TS Definition 1.24 and TS Sections 3.11.1.4,6.9.1.8, and 6.14.1 to support a change in frequency for submitting the Semiannual Radioactive Effluent Release Report to the NRC from semlannually to annually. The proposed changes to the TS are indicated by a vertical bar in the margin of the affected TS pages. The TS pages showing the proposed changes are contained in Attachment 2.
We request that, if approved, the TS changes proposed herein be effective immediately upon lssuance of the amenelments. .
This TS Change Request provides a discussion and description of the proposed TS changes, a -
safety assessment of the proposed TS changes, information. supporting a finding of No Significant Hazards Consideration, and information supporting an Environmental Assessment.
Discussion and Descrintion of the Prongs,ed Channes The Technical Specifications (TS) currently require that the Semlannual Radioactive Effluent Release Report be submitted to the NRC on a semlannual basis to provide a surnmary of the quantities of radioactive liquid and gaseous effluents and solid waste released to unrestricted areas from Limerick Generating Station (LGS), Unit 1 and 2. On August 31,1992, the NRC promulgated Final Rule (i.e.,57FR39353), " Reducing the Regulatory Burden on Nuclear Licensees," which amorded 10 CFR 50.36a, " Technical Specifications on Effluents from Nuclear Power Reactors," to redJce the frequency for submitting radiological effluent release data from semiannually to annually. ;
The proposed TS changes involve revising TS Definition 1.24 and TS Sections 3.11.1.4,6.9.1.0, ,
and 6.t4.1 to require that the Semlannual Radioactive Effluent Release Report be submitted to !
the NRC annually. This proposed TS change implements the amended reporting requirements of 10 CFR 50.3Ga, as stipulated in the final rule (i.e.,57FR39353) for submitting radiolog! cal ,
effluent release data.
Safety Assessme_n1 -]
On August 31,1992, the NRC promulgated Final Rule (i.e., 57FR39353), " Reducing the ' ,
Regulatory Burden on Nuclear Licensees," which amended 10 CFR 50.36a, " Technical Specifications on Effluents from Nuclear Power Reactors," requiring that each licenseo submit a -
report annually specifying the quantity of each of the principal radionuclides released to !
unmstricted areas in liquid and in gaseous effluents during the previous 12 months of operation. l l
Currently, the Limerick Generating Station (LGS), Units 1 and 2, Technical Specifications (TS) I require that a report (i e., Semiannual Radioactive Effluent Release Report) be submitted to the I NRC on a semlannual basis summarizing the quantities of radioactive liquid and gaseous effluents and solid waste released from the site. This proposed TS change involves revising the ^
TS to change the frequency for submitting the Semlannual Radioactive Effluent Release Report from semiannually to annually. This proposed change is administrative in nature and will implement the amended reporting requirements in 10CFR50.36a as stipulated in the Final Rule 57FR39353.
i
)
j l
Attachment 1:
Page 2 ,;
Information Supportinn a Findina of No Sionificant Hazards Consideration i
We have concluded that the proposed changes to the Limerick Generating Station (LGS), Units l 1 and 2, Technical Specifications (TS) to revise the frequency for submitting radiological effluent release data from semiannually to anrually do not involve a Significant Hazards Consideration.
in support of this determination, an evaluation of each of the three (3) standards set forth in 10 CFR 50.92 is provided below.
- 1. The oronosed Technical Soecifications (TS) chanaes do not involve a slanificant increase in the orobability or conseauences of an accident Dreviousiv evaluated.
The proposed TS changes are administrative in nature.' The proposed changes simply involve revising the frequency for submitting the Semiannual Radioactive Effluent Release Report to the NRC from semiannually to annually in order to implement the amended reporting requirements of 10CFR50.36a as promulgated-in Final Rule 57FR39353. Since the information contained In this report is reviewed and evaluated after the effluents are released, no accidents previously evaluated are impacted by the proposed TS changes. Radiological effluent releases from the station will continue to be controlled as required by the TS, including those requirements specified in the Offsite Dose Calculation Manual - .
(ODCM) and Process Control Program (PCP). The proposed TS changes do not involve any changes to the operation or physical configuration of any plant 1 systems or equipment. The proposed changes do not impact any initial or final accident conditions or assumptions previously evaluated. The radiological .
consequences of these previously evaluated accidents are not affected by the- .,
proposed changes. !
Therefore, the proposed TS changes do not involve an increase in the 1 probability or consequences of an accident previously evaluated.
- 2. The nroposed TS chances do not create the nossibility of a new or different kind of accident from any accident oreviousiv evaluated The proposed TS changes are administrative in nature. The proposed changes simply involve revising the frequency for submitting the Semlannual Radioactive Effluent Release Report to the NRC from semlannually to annually in order to _ ,
implement the amended reporting requirements of 10CFR50.36a as promulgated ,
in Final Rule 57FR39353. Radiological effluent releases from the station will continue to be controlled as required by the TS, including those requirements ' ;
specified in the ODCM and PCP. The proposed TS changes do not involve any '
modifications to plant systems or equipment.
Therefore, the proposed TS changes do not create the possibility of a new or.
different kind of accident from any previously evaluated.
.I i
j 3
+
Attachment 1 Pago3
- 3. The p_rpagsod TS chartuos do not irivolvo a sLqnificanDeduction in a marain of:
10!f1%
The proposed TS changes are administrativo in naturo, and will only involve revising the frequency for submitting the Somlannual Radioactive Effluent Rolcaso Report to the NRC from somlannually to annually as currently stipulated in 10CFR50.3Ga. The speciflo radiological effluent release information contained in this report will continue to be provided as required. The station radiological offluent releases will continuo to be controlled as required by TS, including thoso requirements specified in the ODCM and PCP.
Thoroforo, the proposed TS changes do not involve a reduction in a mar 0 nl of .
safety.
Infontwtlon Sunngrting an Environmtntal Anossment An Environmental Assessment is not required for the changos proposed by this Change Roquest-because the requestod changes to the LGS, Units 1 and 2, TS conform to the critoria for
" actions ollgible for categorical exclusion," as speciflod in 10 CFR 51.22(c)(9). The requestod changes will have no impact on the environment. The proposed changes do not involvo a Slgnificant Hazards Consideration as discussed in the proceeding section. The proposed changos do not involvo a significant chango in the types or significant increase in the amounts of any offluents that may be released offsito. In addition, the proposed changes do.not involve a sign!!icant increaso in individual or cumulativo occupational radiation exposure.
S20EJnL20 l
The Plant Operations Review Committeo and Nuclear Review Board have reviewed this proposed change to the LGS, Units 1 and 2, TS and have concluded that they do not involvo an unroviewed safety question, and will not endanger the health and safety of the public.