Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20023B309 | 21 December 1982 | Testimony of RB Hubbard & Fj Samaniego Re Torrey Pines Technology Insp of Facility.Certificate of Svc Encl | |
ML20023B407 | 2 May 1983 | Supplemental Proposed Transcript Corrections.Certificate of Svc Encl | |
ML20027C223 | 12 October 1982 | Testimony of Wg Schiffmacher & Wf Renz Re Phase I Emergency Planning Contention 1(B) on Prompt Notification Sys.Prof Qualifications Encl | |
ML20027C235 | 12 October 1982 | Testimony of Re Linnemann & ML Miele Re Phase I Emergency Planning Contention 2(A) on Adequate Medical Svcs.Prof Qualifications & Supporting Documentation Encl | |
ML20027C246 | 12 October 1982 | Testimony of Nj Dimascio & E Lieberman Re Phase I Emergency Planning Contention 2(B) on Ground Transportation to Hosp. Prof Qualifications & Supporting Documentation Encl.One Aperture Card Available in PDR | High Radiation Area |
ML20027C260 | 12 October 1982 | Testimony of B Aidikoff,Hm Blauer,M Cordaro,E Lieberman & J Rivello Re Phase I Emergency Planning Contention 4 on Protective Actions.Prof Qualifications & Supporting Documentation Encl.Six Aperture Cards Available in PDR | Shutdown Margin Grab sample Incorporated by reference |
ML20027C281 | 12 October 1982 | Testimony of Mc Cordaro,Rr Dynes,Ds Mileti & J Rivello Re Phase I Emergency Planning Contention 5(A) on Role Conflict. Prof Qualifications Encl | Shutdown Margin Earthquake |
ML20027C296 | 12 October 1982 | Testimony of Nj Dimascio & E Lieberman Re Phase I Emergency Planning Contention 5(B) on Traffic Congestion Affecting Onsite Emergency Workers & Offsite Util Personnel Reporting to Site.Prof Qualifications & Supporting Documentation Encl | Grab sample |
ML20027C304 | 12 October 1982 | Testimony of Hm Blauer,M Cordaro & J Rivello Re Phase I Emergency Planning Contention 7(B) on Ability to Augment Procedures within 30 Minutes.Prof Qualifications & Supporting Documentation Encl | Shutdown Margin Grab sample Minimum staff |
ML20027C306 | 12 October 1982 | Testimony of Hm Blauer,Mc Cordaro & Jf Schmitt Re Phase I Emergency Planning Contention 10(B) on Real Time Monitors. Prof Qualifications & Supporting Documentation Encl | Earthquake |
ML20027C309 | 12 October 1982 | Testimony of Jf Schmitt & Js Baron Re Phase I Emergency Planning Contention 10(C) on Accident Assessment & Monitoring.Prof Qualifications & Supporting Documentation Encl | Grab sample Siren |
ML20027C310 | 12 October 1982 | Testimony of Wf Renz & P Friedman Re Phase I Emergency Planning Contention 11(A),(B) & (C) on Communications W/Offsite Response Organizations.Prof Qualifications & Supporting Documentation Encl | Earthquake |
ML20027C314 | 12 October 1982 | Testimony of Ja Notaro & Rl Poltrino Re Phase I Emergency Planning Contention 13 on Interim Safety Parameter Display Sys.Prof Qualifications & Supporting Documentation Encl | Half scram Hydrostatic Earthquake Liquid penetrant |
ML20027C319 | 12 October 1982 | Testimony of Js Baron,Mc Cordaro,Nj Dimascio,Jn Hamawi, LP Pocalujka & Jf Schmitt Re Phase I Emergency Planning Contention 14 on Accident & Dose Assessment Models.W/ Certificate of Svc.Five Aperture Cards Available in PDR | |
ML20052D820 | 4 May 1982 | Testimony of Rn Anderson & D Bridenbaugh on Suffolk County Contention 24 & Shoreham Opponents Coalition Contentions 19(c) & (D) Re Cracking of Matls & Selection.Certificate of Svc Encl | Safe Shutdown Scram Discharge Volume Earthquake Fuel cladding Pressure Boundary Leakage |
ML20052D823 | 4 May 1982 | Testimony of MW Goldsmith,Dg Bridenbaugh & V Barlit on Suffolk County Contention 26 Re Maint of Occupational Radiation Exposure Alara.Discusses Concerns of Implementing ALARA Program | |
ML20052D825 | 4 May 1982 | Testimony of Gc Minor & DG Bridenbaugh on Suffolk County Contention 28(a)(i) & Shoreham Opponents Coalition Contention 7(a)(i) Re Restart of Core Spray & LPCI Sys on Low Level | Ultimate heat sink |
ML20052D826 | 4 May 1982 | Testimony of Gc Minor on Suffolk County Contention 28(a)(iii) & Shoreham Opponents Coalition Contention 7.A(3) Re Iodine Monitoring.W/O Reviews,Accuracy of Sys Measurement of Iodine Unresolved | Backfit |
ML20052D829 | 4 May 1982 | Testimony of RB Hubbard & Gc Minor Re Suffolk County Contention 31 & Shoreham Opponents Coalition 19(g) on Electrical Separation.Design & Const of Electrical Sys Fail to Provide Adequate Physical Independence | |
ML20052E541 | 4 May 1982 | Testimony of RM Kascsak Re Suffolk County Contention 24 & Shoreham Opponents Coalition Contention 19(d) on Cracking of Matls.Requirements of NUREG-0313,Revision 1 & NUREG-0619 Incorporated.Prof Qualifications Encl | Pressure Boundary Leakage |
ML20052E551 | 4 May 1982 | Testimony of Re Fortier & ML Miele Re Suffolk County Contention 26 on ALARA Radiation Exposure.Describes Provisions Which Demonstrate Util Commitment to Achieving Radiation Doses ALARA | Fuel cladding |
ML20052E557 | 4 May 1982 | Testimony of Sj Stark Re Suffolk County Contention 28(a)(i) & Shoreham Opponents Coalition Contention 7A(i) on ECCS Cutoff.Installation of Automatic Restart Feature for Low Pressure ECCS Would Not Improve & Might Decrease Safety | |
ML20052E566 | 4 May 1982 | Testimony of Jf Schmitt Re Suffolk County Contention 28(a) (III) & Shoreham Opponents Coalition Contention 7A(3) on Iodine monitoring.Post-accident Iodine Monitoring Capability Exists to Measure Iodine Releases from Vent | |
ML20052E573 | 4 May 1982 | Testimony of Br Mccaffrey Re Suffolk County Contention 31 & Shoreham Opponents Coalition Contention 19(g) on Electrical Separation.Electrical Cables & Raceways Between Equipment & Panels Adequately Separated | Safe Shutdown |
ML20052E577 | 4 May 1982 | Testimony of RA Hill Re Shoreham Opponents Coalition Contention 16 on Cladding Swelling & Flow Blockage.Issues Raised in NUREG-0630 Do Not Have Adverse Impact on ECCS Analysis Performed for Plant | Fuel cladding |
ML20052E581 | 4 May 1982 | Testimony of Aw Zeuthen Re Shoreham Opponents Coalition Contention 19(c) on Ferrite of Welding Matls.Util Substantially Complies W/Reg Guide 1.31,Revision 3.Testing Program Ensures Adequate Ferrite Content in Matls | |
ML20052E587 | 4 May 1982 | Testimony of Ay Wong Re Shoreham Opponents Coalition Contention 19(e) on Seismic Design.Design Response Spectra & Corresponding Damping Values Used for Seismic Design Ensure Conservative Design.Certificate of Svc Encl | Safe Shutdown Tornado Missile Earthquake |
ML20052F347 | 10 May 1982 | Testimony of Sj Stark Re Suffolk County Contention 28(a)(1) & Shoreham Opponents Coalition Contention 7A(1) on Installation of Automatic Restart Feature for Low Pressure Eccs,Per NUREG-0737,Item II.K.3.21 | |
ML20052H033 | 13 May 1982 | Corrections & Additions to RA Hill Testimony on Suffolk County Contention 10 Re ECCS Core Spray | |
ML20052H037 | 13 May 1982 | Testimony of RA Hill Re Suffolk County Contention 10 on ECCS Core Spray.Plant Meets 10CFR50.46 & App K Requirements.Ge Test Results Demonstrate Adequate Core Cooling Assured by Multiple Cooling Mechanisms | |
ML20052H165 | 14 April 1982 | Statement Supporting Plant & Nuclear Energy in General | |
ML20052H187 | 14 April 1982 | Draft Limited Appearance Statement for ASLB 820414 Hearings, Supporting Facility Licensing.Nrc Current Requirements for Emergency Planning & Public Perception of Nuclear Accident Consequences Are Excessive | Earthquake |
ML20052H197 | 14 April 1982 | Final Version of Limited Appearance Statement at ASLB 820414 Hearings,Supporting Facility Licensing.Nrc Current Requirements for Emergency Planning & Public Perception of Nuclear Accident Consequences Are Excessive | Earthquake |
ML20052H266 | 14 April 1982 | Statement by Business Council of Ny State,Inc,Supporting Facility Licensing.Plant Would Have Positive Impact on Economic Climate of Long Island & State of Ny | |
ML20052H274 | 13 April 1982 | Statement Raising Concerns Re Quality of Plant & Radiological Emergency Preparedness Difficulties | |
ML20052H315 | 14 April 1982 | Statement Opposing Plant Licensing Since Facility Operation Would Pose Unprecedented Hazard to Lives & Health of People of Long Island | |
ML20052H319 | 14 April 1982 | Long Island Assoc of Commerce & Industry Statement Presented at 820414 Hearing Supporting Facility Due to Importance to Long Island Economy | |
ML20053D307 | 25 May 1982 | Testimony of Gc Minor on Behalf of Shoreham Opponents Coalition Re Contention 9 on Notification of Disabled Safety Sys.Certificate of Svc Encl.Related Correspondence | Safe Shutdown |
ML20054E150 | 21 April 1982 | Addendum to MW Goldsmith Testimony Re Suffolk County Contention 4 on Waterhammer.Rept Provided by NRC on 820408 on Waterhammer Addressed.Certificate of Svc Encl | |
ML20054E640 | 9 June 1982 | Transcript of 820609 OL Hearing in Hauppauge,Ny. Pp 3,818-4,037 | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake Backfit |
ML20054F141 | 11 June 1982 | Transcript of 820611 Evidentiary Hearing in Hauppauge,Ny. Pp 4,299-4,321 | Backfit Affidavit |
ML20054F525 | 15 June 1982 | Trnscript of 820615 Hearing in Hauppauge,Ny.Pp 4,322-4,519. Supporting Documentation Encl | |
ML20054F668 | 14 June 1982 | Testimony of MW Hodges Re Suffolk County Contention 28(a) (VI) & Shoreham Opponents Coalition Contention 7(a)(6) on Reduction of Safety Relief Valve Challenges.Prof Qualifications Encl | Backfit |
ML20054F672 | 14 June 1982 | Testimony of Ws Hazelton,Cy Cheng,Mr Hum,De Smith,Ga Walton, & CS Hinson Re Suffolk County Contention 25 & Shoreham Opponents Coalition Contention 19(a) on Preservice & Inservice Insp Programs.Prof Qualifications Encl | High Radiation Area Hydrostatic Nondestructive Examination Incorporated by reference Liquid penetrant Backfit |
ML20054F707 | 14 June 1982 | Testimony of DG Bridenbaugh on Behalf of Suffolk County Re County Contention 25 on ASME Section XI Preservice/Inservice Insp Program | Non-Destructive Examination Nondestructive Examination Incorporated by reference Liquid penetrant |
ML20054F716 | 14 June 1982 | Testimony of DG Bridenbaugh & Gc Minor on Behalf of Suffolk County Re County Contention 28(a)(vi) & Shoreham Opponents Coalition Contention 7a(6) on Reduction of Safety Relief Valve Challenges.Certificate of Svc Encl | Backfit |
ML20054F906 | 14 June 1982 | Testimony of Ps Barry,Ck Seaman & Ranganath Re Preservice & Inservice Insp Program & Reactor Pressure Vessel Integrity.Certificate of Svc Encl | Nondestructive Examination Liquid penetrant |
ML20054F912 | 14 June 1982 | Testimony of Jj Boseman,Rm Crawford,F Hayes,Jj Kreps & Jl Smith Re Implementation of NUREG-0737,Item II.K.3.16 Concerning Reduction of Challenges & Failures of Relief Valves.Schematic of three-stage Pilot Operated Valve Encl | Feedwater Controller Failure Backfit |
ML20054G420 | 17 June 1982 | Transcript of 820617 OL Hearing in Hauppauge,Ny.Pp 4,520-4,656 & 4,748-4,775.Supporting Documentation Encl | Affidavit |
ML20054G662 | 18 June 1982 | Transcript of 820618 Hearing in Hauppauge,Ny.Pp 4,776-4,991 | Safe Shutdown Anticipated operational occurrence Safe Shutdown Earthquake Systematic Assessment of Licensee Performance Earthquake |