Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20023B30921 December 1982Testimony of RB Hubbard & Fj Samaniego Re Torrey Pines Technology Insp of Facility.Certificate of Svc Encl
ML20023B4072 May 1983Supplemental Proposed Transcript Corrections.Certificate of Svc Encl
ML20027C22312 October 1982Testimony of Wg Schiffmacher & Wf Renz Re Phase I Emergency Planning Contention 1(B) on Prompt Notification Sys.Prof Qualifications Encl
ML20027C23512 October 1982Testimony of Re Linnemann & ML Miele Re Phase I Emergency Planning Contention 2(A) on Adequate Medical Svcs.Prof Qualifications & Supporting Documentation Encl
ML20027C24612 October 1982Testimony of Nj Dimascio & E Lieberman Re Phase I Emergency Planning Contention 2(B) on Ground Transportation to Hosp. Prof Qualifications & Supporting Documentation Encl.One Aperture Card Available in PDRHigh Radiation Area
ML20027C26012 October 1982Testimony of B Aidikoff,Hm Blauer,M Cordaro,E Lieberman & J Rivello Re Phase I Emergency Planning Contention 4 on Protective Actions.Prof Qualifications & Supporting Documentation Encl.Six Aperture Cards Available in PDRShutdown Margin
Grab sample
Incorporated by reference
ML20027C28112 October 1982Testimony of Mc Cordaro,Rr Dynes,Ds Mileti & J Rivello Re Phase I Emergency Planning Contention 5(A) on Role Conflict. Prof Qualifications EnclShutdown Margin
Earthquake
ML20027C29612 October 1982Testimony of Nj Dimascio & E Lieberman Re Phase I Emergency Planning Contention 5(B) on Traffic Congestion Affecting Onsite Emergency Workers & Offsite Util Personnel Reporting to Site.Prof Qualifications & Supporting Documentation EnclGrab sample
ML20027C30412 October 1982Testimony of Hm Blauer,M Cordaro & J Rivello Re Phase I Emergency Planning Contention 7(B) on Ability to Augment Procedures within 30 Minutes.Prof Qualifications & Supporting Documentation EnclShutdown Margin
Grab sample
Minimum staff
ML20027C30612 October 1982Testimony of Hm Blauer,Mc Cordaro & Jf Schmitt Re Phase I Emergency Planning Contention 10(B) on Real Time Monitors. Prof Qualifications & Supporting Documentation EnclEarthquake
ML20027C30912 October 1982Testimony of Jf Schmitt & Js Baron Re Phase I Emergency Planning Contention 10(C) on Accident Assessment & Monitoring.Prof Qualifications & Supporting Documentation EnclGrab sample
Siren
ML20027C31012 October 1982Testimony of Wf Renz & P Friedman Re Phase I Emergency Planning Contention 11(A),(B) & (C) on Communications W/Offsite Response Organizations.Prof Qualifications & Supporting Documentation EnclEarthquake
ML20027C31412 October 1982Testimony of Ja Notaro & Rl Poltrino Re Phase I Emergency Planning Contention 13 on Interim Safety Parameter Display Sys.Prof Qualifications & Supporting Documentation EnclHalf scram
Hydrostatic
Earthquake
Liquid penetrant
ML20027C31912 October 1982Testimony of Js Baron,Mc Cordaro,Nj Dimascio,Jn Hamawi, LP Pocalujka & Jf Schmitt Re Phase I Emergency Planning Contention 14 on Accident & Dose Assessment Models.W/ Certificate of Svc.Five Aperture Cards Available in PDR
ML20052D8204 May 1982Testimony of Rn Anderson & D Bridenbaugh on Suffolk County Contention 24 & Shoreham Opponents Coalition Contentions 19(c) & (D) Re Cracking of Matls & Selection.Certificate of Svc EnclSafe Shutdown
Scram Discharge Volume
Earthquake
Fuel cladding
Pressure Boundary Leakage
ML20052D8234 May 1982Testimony of MW Goldsmith,Dg Bridenbaugh & V Barlit on Suffolk County Contention 26 Re Maint of Occupational Radiation Exposure Alara.Discusses Concerns of Implementing ALARA Program
ML20052D8254 May 1982Testimony of Gc Minor & DG Bridenbaugh on Suffolk County Contention 28(a)(i) & Shoreham Opponents Coalition Contention 7(a)(i) Re Restart of Core Spray & LPCI Sys on Low LevelUltimate heat sink
ML20052D8264 May 1982Testimony of Gc Minor on Suffolk County Contention 28(a)(iii) & Shoreham Opponents Coalition Contention 7.A(3) Re Iodine Monitoring.W/O Reviews,Accuracy of Sys Measurement of Iodine UnresolvedBackfit
ML20052D8294 May 1982Testimony of RB Hubbard & Gc Minor Re Suffolk County Contention 31 & Shoreham Opponents Coalition 19(g) on Electrical Separation.Design & Const of Electrical Sys Fail to Provide Adequate Physical Independence
ML20052E5414 May 1982Testimony of RM Kascsak Re Suffolk County Contention 24 & Shoreham Opponents Coalition Contention 19(d) on Cracking of Matls.Requirements of NUREG-0313,Revision 1 & NUREG-0619 Incorporated.Prof Qualifications EnclPressure Boundary Leakage
ML20052E5514 May 1982Testimony of Re Fortier & ML Miele Re Suffolk County Contention 26 on ALARA Radiation Exposure.Describes Provisions Which Demonstrate Util Commitment to Achieving Radiation Doses ALARAFuel cladding
ML20052E5574 May 1982Testimony of Sj Stark Re Suffolk County Contention 28(a)(i) & Shoreham Opponents Coalition Contention 7A(i) on ECCS Cutoff.Installation of Automatic Restart Feature for Low Pressure ECCS Would Not Improve & Might Decrease Safety
ML20052E5664 May 1982Testimony of Jf Schmitt Re Suffolk County Contention 28(a) (III) & Shoreham Opponents Coalition Contention 7A(3) on Iodine monitoring.Post-accident Iodine Monitoring Capability Exists to Measure Iodine Releases from Vent
ML20052E5734 May 1982Testimony of Br Mccaffrey Re Suffolk County Contention 31 & Shoreham Opponents Coalition Contention 19(g) on Electrical Separation.Electrical Cables & Raceways Between Equipment & Panels Adequately SeparatedSafe Shutdown
ML20052E5774 May 1982Testimony of RA Hill Re Shoreham Opponents Coalition Contention 16 on Cladding Swelling & Flow Blockage.Issues Raised in NUREG-0630 Do Not Have Adverse Impact on ECCS Analysis Performed for PlantFuel cladding
ML20052E5814 May 1982Testimony of Aw Zeuthen Re Shoreham Opponents Coalition Contention 19(c) on Ferrite of Welding Matls.Util Substantially Complies W/Reg Guide 1.31,Revision 3.Testing Program Ensures Adequate Ferrite Content in Matls
ML20052E5874 May 1982Testimony of Ay Wong Re Shoreham Opponents Coalition Contention 19(e) on Seismic Design.Design Response Spectra & Corresponding Damping Values Used for Seismic Design Ensure Conservative Design.Certificate of Svc EnclSafe Shutdown
Tornado Missile
Earthquake
ML20052F34710 May 1982Testimony of Sj Stark Re Suffolk County Contention 28(a)(1) & Shoreham Opponents Coalition Contention 7A(1) on Installation of Automatic Restart Feature for Low Pressure Eccs,Per NUREG-0737,Item II.K.3.21
ML20052H03313 May 1982Corrections & Additions to RA Hill Testimony on Suffolk County Contention 10 Re ECCS Core Spray
ML20052H03713 May 1982Testimony of RA Hill Re Suffolk County Contention 10 on ECCS Core Spray.Plant Meets 10CFR50.46 & App K Requirements.Ge Test Results Demonstrate Adequate Core Cooling Assured by Multiple Cooling Mechanisms
ML20052H16514 April 1982Statement Supporting Plant & Nuclear Energy in General
ML20052H18714 April 1982Draft Limited Appearance Statement for ASLB 820414 Hearings, Supporting Facility Licensing.Nrc Current Requirements for Emergency Planning & Public Perception of Nuclear Accident Consequences Are ExcessiveEarthquake
ML20052H19714 April 1982Final Version of Limited Appearance Statement at ASLB 820414 Hearings,Supporting Facility Licensing.Nrc Current Requirements for Emergency Planning & Public Perception of Nuclear Accident Consequences Are ExcessiveEarthquake
ML20052H26614 April 1982Statement by Business Council of Ny State,Inc,Supporting Facility Licensing.Plant Would Have Positive Impact on Economic Climate of Long Island & State of Ny
ML20052H27413 April 1982Statement Raising Concerns Re Quality of Plant & Radiological Emergency Preparedness Difficulties
ML20052H31514 April 1982Statement Opposing Plant Licensing Since Facility Operation Would Pose Unprecedented Hazard to Lives & Health of People of Long Island
ML20052H31914 April 1982Long Island Assoc of Commerce & Industry Statement Presented at 820414 Hearing Supporting Facility Due to Importance to Long Island Economy
ML20053D30725 May 1982Testimony of Gc Minor on Behalf of Shoreham Opponents Coalition Re Contention 9 on Notification of Disabled Safety Sys.Certificate of Svc Encl.Related CorrespondenceSafe Shutdown
ML20054E15021 April 1982Addendum to MW Goldsmith Testimony Re Suffolk County Contention 4 on Waterhammer.Rept Provided by NRC on 820408 on Waterhammer Addressed.Certificate of Svc Encl
ML20054E6409 June 1982Transcript of 820609 OL Hearing in Hauppauge,Ny. Pp 3,818-4,037Safe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Design basis earthquake
Earthquake
Backfit
ML20054F14111 June 1982Transcript of 820611 Evidentiary Hearing in Hauppauge,Ny. Pp 4,299-4,321Backfit
Affidavit
ML20054F52515 June 1982Trnscript of 820615 Hearing in Hauppauge,Ny.Pp 4,322-4,519. Supporting Documentation Encl
ML20054F66814 June 1982Testimony of MW Hodges Re Suffolk County Contention 28(a) (VI) & Shoreham Opponents Coalition Contention 7(a)(6) on Reduction of Safety Relief Valve Challenges.Prof Qualifications EnclBackfit
ML20054F67214 June 1982Testimony of Ws Hazelton,Cy Cheng,Mr Hum,De Smith,Ga Walton, & CS Hinson Re Suffolk County Contention 25 & Shoreham Opponents Coalition Contention 19(a) on Preservice & Inservice Insp Programs.Prof Qualifications EnclHigh Radiation Area
Hydrostatic
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Backfit
ML20054F70714 June 1982Testimony of DG Bridenbaugh on Behalf of Suffolk County Re County Contention 25 on ASME Section XI Preservice/Inservice Insp ProgramNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
Liquid penetrant
ML20054F71614 June 1982Testimony of DG Bridenbaugh & Gc Minor on Behalf of Suffolk County Re County Contention 28(a)(vi) & Shoreham Opponents Coalition Contention 7a(6) on Reduction of Safety Relief Valve Challenges.Certificate of Svc EnclBackfit
ML20054F90614 June 1982Testimony of Ps Barry,Ck Seaman & Ranganath Re Preservice & Inservice Insp Program & Reactor Pressure Vessel Integrity.Certificate of Svc EnclNondestructive Examination
Liquid penetrant
ML20054F91214 June 1982Testimony of Jj Boseman,Rm Crawford,F Hayes,Jj Kreps & Jl Smith Re Implementation of NUREG-0737,Item II.K.3.16 Concerning Reduction of Challenges & Failures of Relief Valves.Schematic of three-stage Pilot Operated Valve EnclFeedwater Controller Failure
Backfit
ML20054G42017 June 1982Transcript of 820617 OL Hearing in Hauppauge,Ny.Pp 4,520-4,656 & 4,748-4,775.Supporting Documentation EnclAffidavit
ML20054G66218 June 1982Transcript of 820618 Hearing in Hauppauge,Ny.Pp 4,776-4,991Safe Shutdown
Anticipated operational occurrence
Safe Shutdown Earthquake
Systematic Assessment of Licensee Performance
Earthquake