|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20093G4541995-10-18018 October 1995 Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommissioning Procedures for Nuclear Power Reactors ML20058K7381993-12-0303 December 1993 Memorandum & Order CLI-93-25.* Commission Denies State of Nj Petition for Leave to Intervene & Request for Adjudicatory Hearing Filed on 931008.W/Certificate of Svc.Served on 931203 ML20058E0151993-11-14014 November 1993 Comment Opposing Proposed Rule 10CFR50 Re Exemptions in Accident Insurance for Nuclear Power Plants Prematurely Shut Down ML20059B0301993-10-22022 October 1993 NRC Staff Response to Commission Questions Posed W/Respect to State of New Jersey Petition for Leave to Intervene & Request for Hearing.* Denies Petition to Intervene & Request for Hearing.W/Certificate of Svc & Notice of Appearance ML20059B0621993-10-20020 October 1993 Long Island Power Authority Response to Nuclear Regulatory Commission Order of 931014.* Requests That NRC Reject State of Nj Filing.W/Certificate of Svc ML20059B1111993-10-20020 October 1993 Philadelphia Electric Co Response to NRC 931014 Order.* State Failed to Demonstrate Entitlement to Hearing to Challenge Util Amend to Permit Util to Receive Shoreham Fuel ML20059A4581993-10-14014 October 1993 Order Requesting Answers to Two Questions Re State of Nj Request for Immediate Action by NRC or Alternatively, Petition for Leave to Intervene & Request for Hearing. Operations Plans for Marine Transportation Withheld ML20057G2141993-10-14014 October 1993 Order.* Requests for Simultaneous Responses,Not to Exceed 10 Pages to Be Filed by State,Peco & Lipa & Served on Other Specified Responders by 931020.NRC May File by 931022. W/Certificate of Svc.Served on 931014 ML20059F0191993-10-0808 October 1993 Long Island Power Authority Reply to New Jersey Filing of 931020.* Licensee Requests That NRC Deny State of Nj Intervention Petition.W/Certificate of Svc ML20057F2191993-09-30030 September 1993 Exemption from Requirements of 10CFR50.54(q) Eliminating Licensee Requirement to Follow & Maintain in Effect Emergency Plans ML20059B1291993-09-14014 September 1993 Affidavit of Jh Freeman.* Discusses Transfer of Slightly Used Nuclear Fuel from Shoreham Nuclear Power Station to Limerick Generating Station.W/Certificate of Svc & Notice of Appearance ML20097C2911992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeal.* Dismisses 911203 Notice of Appeal W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees Due to Encl Settlement Agreement. W/Certificate of Svc ML20097C1361992-06-0303 June 1992 Petitioners Consented Motion to Dismiss.* Petitioners by Counsel Move ASLB to Dismiss Petitioners as Petitioners for Leave to Intervene & Request for Hearing in Proceeding W/ Prejudice.W/Certificate of Svc ML20097C1081992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Appeal.* Petitioners Hereby Move to Dismiss 910628 Notice of Appeal in Matter W/Prejudice & W/Each Party to Bear Own Costs & Atty Fees.W/ Certificate of Svc ML20097C2631992-06-0303 June 1992 Petitioner Consented Motion to Dismiss.* NRC Should Issue Order Dismissing School District & Scientists & Engineers for Secure Energy,Inc as Petitioners in Proceeding.W/ Settlement Agreement & Certificate of Svc ML20097C2891992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeals.* Appeals Being Dismissed Due to Encl Settlement Agreement.Nrc Should Dismiss Appeals W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees.W/Certificate of Svc ML20097C3241992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Joint Opposition to Issuance of Decommissioning Order Prior to Hearing.* W/Certificate of Svc ML20096A5921992-05-0707 May 1992 Motion to Withdraw Supplemental Filing.* Petitioners Urge NRC to Allow Withdrawal of Supplement for Good Cause Shown. W/Certificate of Svc ML20096A5311992-05-0606 May 1992 Long Island Power Authority Comments on SECY-92-140 & Response to Petitioner Joint Opposition to Decommissioning Order.* Util Urges NRC to Adopt Recommendation in SECY-92-140 & Approve Order.W/Certificate of Svc ML20096A5071992-05-0505 May 1992 Suppl to Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Supplements Joint Opposition Prior to Hearing.W/Certificate of Svc ML20095K8991992-04-29029 April 1992 Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Petitioners Urge Commission to Reject NRC Staff Proposal in SECY-92-140.W/Certificate of Svc ML20095H5611992-04-28028 April 1992 Affidavit of Lm Hill.* Affidavit of Lm Hill Supporting Util Position That Circumstances Exist Warranting Prompt NRC Action on NRC Recommendation That Immediately Effective Order Be Issued Approving Decommissioning Plan ML20094G3971992-02-26026 February 1992 Notice of State Taxpayer Complaint & Correction.* NRC Should Stay Hand in Approving Application for License Transfer as Matter of Comity Pending Resolution of Question as Util Continued Existence in Ny State Courts.W/Certificate of Svc ML20094G2261992-02-25025 February 1992 Petitioner Notice of Lilco/Long Island Power Authority Exaggeration & of Commencement of State Court Action.* NRC Should Await Ny State Decision Re Matter within Special Jurisdiction.W/Certificate of Svc ML20092K9021992-02-24024 February 1992 Petitioner Opposition to Ltr Request for Dismissal of Pages.* Suggests That Transfer of License Inappropriate at Present Time.W/Certificate of Svc ML20092K9511992-02-21021 February 1992 Response of Lilco & Long Island Power Authority to Petitioner Opposition to NRC Staff Recommendation for License Transfer Approval.* W/Certificate of Svc ML20092K8701992-02-20020 February 1992 Petitioners Opposition to NRC Staff Recommendation for Approval of License Transfer.* Urges Commission to Reject NRC Recommendation in SECY-92-041 & Remand Matter for Consideration in Normal Proceeding.W/Certificate of Svc ML20091E2661992-02-20020 February 1992 Petitioner Opposition to NRC Staff Motion to Dismiss.* Petitioners Urge NRC to Deny Staff Motion or Defer Action Until Petitioners Have Fully Developed Petitions & Supplied Detailed Contentions.W/Certificate of Svc ML20091E4011992-02-18018 February 1992 Answer of Long Island Power Authority to NRC Staff Motion to Dismiss Intervention Petitions.* Util Urges NRC to Grant Motion & Dismiss Intervention Petitions.W/Certificate of Svc ML20091E3161992-02-13013 February 1992 Lilco Response to NRC Staff Motion to Dismiss Intervention Petitions on Decommissioning Plan.* Requests That Petitions Be Struck & Petitioners Be Instructed of Possible Dismissal.W/Certificate of Svc ML20091E2741992-02-0606 February 1992 Answer of Long Island Power Authority to Intervention Petitions Concerning Shoreham Decommissioning Plan.* Requests That Petitions for Leave & Requests for Hearing Be Denied.W/Certificate of Svc & Notice of Appearance ML20092D2931992-02-0606 February 1992 Answer Denying Petitions for Leave to Intervene & Request for Prior Hearing Re Decommissioning ML20091E2941992-02-0606 February 1992 Lilco Opposition to Petitioner Request for Hearing on Shoreham Decommissioning Plan.* Informs That Util Opposes Both Requests for Hearing.W/Certificate of Svc ML20091E2831992-01-22022 January 1992 Shoreham-Wading River Central School District Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition for Leave Be Granted & Hearing Held. W/Certificate of Svc & Notice of Appearance ML20091E2811992-01-22022 January 1992 Scientists & Engineers for Secure Energy,Inc Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition Be Granted & Hearing Be Held.W/Certificate of Svc & Notice of Appearance ML20086T7231992-01-0303 January 1992 Motion of Long Island Power Authority for Leave to File Supplemental Matls.* Requests That Supplemental Memorandum & Supplemental Legislative History Matls Be Filed. W/Certificate of Svc ML20086T7541992-01-0303 January 1992 Memorandum of Long Island Power Authority Concerning Supplemental Legislative History Matls.* Supports Legislative History & Argues That License Not Subj to Termination Under Section 2828.W/Certificate of Svc ML20086Q9281991-12-30030 December 1991 Opposition of Util to Motion for Stay of License Transfer & to Suggestion of Mootness.* Concluded That Relief Sought in Petitioner Motion & Suggestion Should Be Denied. W/Certificate of Svc ML20086Q9171991-12-30030 December 1991 Lilco Opposition to Petitioners Request for Stay & Suggestion of Mootness.* Suggests That Stay Request & Suggestion of Mootness Be Denied.W/Certificate of Svc ML20091H8261991-12-19019 December 1991 Suggestion of Mootness Due to Long Island Power Authority Imminent Demise.* Concludes That If Commission Were to Transfer Shoreham Licenses to Lipa,Nrc Could Find Itself W/Class 103 Facility W/O Licensee.W/Certificate of Svc ML20091H8661991-12-18018 December 1991 Lilco Opposition to SE2 Appeal from LBP-91-26 & LBP-91-39. Concludes That Appeal Should Be Summarily Rejected or Be Denied on Merits.W/Certificate of Svc ML20086N1661991-12-17017 December 1991 Motion for Stay of License Transfer Pending Final Order on Petition to Intervene & Request for Hearing & for Addl or Alternative Stay.W/Certificate of Svc ML20086M0791991-12-16016 December 1991 Certificate of Svc.* Certifies Svc of Petitioner Notice of Appeal & Brief in Support of Appeal in Proceeding to Listed Individuals ML20086J6351991-12-0909 December 1991 Lilco Opposition to Petitioners Contentions on License Transfer Amend.* Concludes That License Transfer Amend Contentions Be Rejected & Petitioner Request to Intervene Denied.W/Certificate of Svc ML20086J3521991-12-0909 December 1991 Response of Long Island Power Authority to Petitioners Joint Supplemental Petition.* Board Should Dismiss Petitions to Intervene for Lack of Standing & Reject All Contentions Proffered by Petitioners.W/Certificate of Svc ML20094E1041991-12-0909 December 1991 Response to Long Island Power Authority to Petitioners Joint Supplemental Petition ML20091G1971991-12-0303 December 1991 Notice of Appeal.* Informs of Appeal of LBP-91-26 & LBP-91-39 in Facility possession-only License Proceeding ML20091G2051991-12-0303 December 1991 Brief in Support of Appeal.* Commission Should Consider Appeal on Basis That Findings of Matl of Facts Clearly Erroneous.W/Certificate of Svc ML20086C5471991-11-18018 November 1991 App to Joint Supplemental Petition of Shoreham-Wading River Central School District & Scientists/Engineers for Secure Energy,Inc.* ML20086C5381991-11-18018 November 1991 Petitioner Joint Supplemental Petition.* Petition Includes List of Contentions to Be Litigated in Hearing Re License Transfer Application.W/Certificate of Svc 1995-10-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20044A9301989-07-28028 July 1989 Transcript of 890728 Mgt Level Meeting Between NRC & Lilco in Rockville,Md.Pp 1-87 ML20245K9371989-04-20020 April 1989 Transcript of Commission 890420 Affirmation/Discussion & Vote in Rockville,Md.Pp 1-5 ML20247R4421989-04-20020 April 1989 Transcript of Commission 890420 Press Conference in Rockville,Md.Pp 1-10 ML20245G5661989-04-17017 April 1989 Transcript of 890417 Discussion of Plant Full Power OL in Rockville,Md.Pp 1-70.Supporting Documentation Encl ML20236E1021989-03-0303 March 1989 Transcript of Commission 890303 Affirmation,Discussion & Vote in Rockville,Md Re SECY-89-77, Shoreham Sanction Decision. Pp 1-5 ML20247R4321989-03-0303 March 1989 Transcript of Commission 890303 Press Conference in Rockville,Md Re Shoreham Proceedings.Pp 1-10 ML20235V6301989-03-0101 March 1989 Testimony of F Kantor,Em Podolak & RT Hogan of NRC Staff on Scope of Exercise.* Purpose of Testimony Is to Rebut Testimony of Intervenors Re Contention 1 ML20235V3841989-03-0101 March 1989 Direct Testimony of Iw Husar & Jh Keller Concerning June 1988 Emergency Preparedness Exercise.* Certificate of Svc Encl.Related Correspondence ML20235N1221989-02-24024 February 1989 Rebuttal Testimony of Jr Asher,Dm Crocker,Rb Kelly,Jj Kozak & Cl Stovall on Contention 1 (Scope of Exercise).* Related Documentation Encl.Related Correspondence ML20235N1501989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 6 (Emergency Broadcast Sys Messages) & 7.E & F (Enc).* Attachments Encl. Related Correspondence ML20235N1641989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 18 (Communications Equipment & Reception Failures).* Related Correspondence ML20235Y5811989-02-21021 February 1989 Transcript of Commission Oral Argument on 890221 in Rockville,Md Re Sanction Issue in Shoreham Proceeding ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196F2881988-12-0606 December 1988 Transcript of 881206 Hearing in Bethesda,Md Re Plant. Pp 1-122 ML20154E4761988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Appeal of Initial Decision Concerning Emergency Exercise.Pp 1-91 ML20154E4631988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Util Reception Ctrs That Will Be Used in Event of Radiological Emergency.Pp 1-98 ML20151C3041988-07-19019 July 1988 Transcript of 880719 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,830-22,074.Witnesses:F Jones,We Regan, R Shepherd & D Davidoff ML20151B3391988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,537-21,720.Witnesses:N Kelly & D Axelrod ML20151B3671988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,721-21,829.Witnesses:N Kelly, D Axelrod & Aj Geramo ML20150E0791988-07-11011 July 1988 Transcript of 880711 Hearing in Bethesda,Md Re Emergency Planning.Pp 20,944-21,174 ML20150F7781988-07-11011 July 1988 Transcript of 880711 Evening Session in Bethesda,Md Re Emergency Planning.Pp 21,175-21,290.Witnesses:JD Papile & DA Devito ML20196J4891988-06-29029 June 1988 Transcript of 880629 Conference in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,929-20,943 ML20196A4261988-06-24024 June 1988 Transcript of 880624 Hearing in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,894-20,928 ML20155K5671988-06-17017 June 1988 Transcript of 880617 Telcon Hearing in Bethesda,Md Re Emergency Planning/School Bus Driver Issue.Pp 20,863-20,893 ML20154D1181988-06-15015 June 1988 Transcript of FEMA 880615 Public Meeting in Patchougue,Ny Re Util.Pp 1-131 ML20155E1751988-06-10010 June 1988 Transcript of 880610 Telcon in Washington,Dc Re Remand/ Emergency Planning.Pp 20,845-20,862 ML20197E3231988-06-0303 June 1988 Transcript of 880603 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 20,686-20,844.Supporting Documentation Encl.Witness:D Hartgen ML20154R2881988-06-0202 June 1988 Transcript of 880602 Hearing in Happauge,Ny Re Emergency Planning.Pp 20,555-20,685.Supporting Documentation Encl ML20197E0401988-05-31031 May 1988 Corrections to Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Bases & Accuracy of Lilco Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8571988-05-27027 May 1988 Transcript of 880527 Hearing in Hauppauge,Ny. Pp 20,440-20,554.Witness:T Urbanik ML20197E1201988-05-26026 May 1988 Surrebuttal Testimony of Dt Haertgen on Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8511988-05-26026 May 1988 Transcript of 880526 Hearing Re Emergency Planning/School Bus Driver Issue in Hauppauge,Ny.Pp 20,245-20,439.Supporting Documentation Encl.Witnesses:Bg Brodsky,Ej Doherty, Hm Koenig,Ar Rossi,Rw Petrilak,Nf Muto,Jt Smith,Rn Suprina ML20197E1631988-05-24024 May 1988 Addendum to Direct Testimony of Bg Brodsky,Ej Doherty, Hm Koenig,Nf Muto,Rw Petrilak,Ar Rossi,Jt Smith & Rn Suprina on Behalf of Suffolk County Re Contention 25.C.* W/ Certificate of Svc.Related Correspondence ML20154H7981988-05-18018 May 1988 Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Base & Accuracy of Lilco Hosp Evacution Time Estimates.Certificate of Svc Encl ML20154F7741988-05-18018 May 1988 Transcript of 880518 Hearing in Hauppauge,Ny. Pp 19,831-19,998.Witnesses:D Mileti,Mk Lindell,Rb Kelly ML20154F7421988-05-17017 May 1988 Transcript of 880517 Hearing in Hauppauge,Ny. Pp 19,612-19,830 ML20154D4751988-05-16016 May 1988 Transcript of 880516 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 19,390-19,611.Supporting Documentation Encl.Witnesses:Dm Crocker,D Mileti,Mk Lindell, RB Kelly ML20154D9221988-05-12012 May 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Immateriality Issues.* Hartgen Resume & Certificate of Svc Encl.Related Correspondence ML20153H6721988-05-10010 May 1988 Transcript of 880510 Prehearing Conference in Bethesda,Md. Pp 19,323-19,389 ML20154B4621988-05-10010 May 1988 Lilco Supplemental Testimony on Remanded Issue of Role Conflict of School Bus Drivers.* Certificate of Svc Encl ML20154B5421988-05-0606 May 1988 Testimony of DM Behr,Dm Crocker,Dp Dreikorn,Eb Lieberman & Ja Weismantle on Best Efforts Contentions EP 1-2,4-8 & 10.* Supporting Documentation & Certificate of Svc Encl.W/One Oversize Map.Related Correspondence ML20154B7841988-05-0606 May 1988 Direct Testimony of Gc Minor & Sc Sholly on Behalf of Suffolk County Re Immateriality.* Certificate of Svc Encl. Related Correspondence ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20151V9271988-04-28028 April 1988 Transcript of 880428 Hearing in Bethesda,Md Re Emergency Preparedness Exercise.Pp 1-94 ML20151Z0711988-04-28028 April 1988 Testimony of Jj Boursy.* Addresses Issue of Measured Signal Strength of Fm Radio Station Wplr,New Haven,Ct within EPZ for Plant.Related Correspondence ML20154B7061988-04-22022 April 1988 Deposition of D Axelrod.* Deposition Taken in Albany,Ny Re Emergency Planning ML20154H6621988-04-21021 April 1988 Deposition of Gc Minor.* Transcript of Gc Minor Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154H6311988-04-21021 April 1988 Deposition of Sc Sholly.* Transcript of Sc Sholly Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154B6861988-04-19019 April 1988 Deposition of Pg Halpin.* Deposition Taken in Happauge,Ny Re Emergency Planning/Best Efforts Issue ML20148S8511988-04-13013 April 1988 Testimony of T Urbanik Re Bases & Accuracy of Hosp Evacuation Time Estimates Contained in Rev 9 of Util Emergency Plan.Related Correspondence 1989-07-28
[Table view] Category:DEPOSITIONS
MONTHYEARML20044A9301989-07-28028 July 1989 Transcript of 890728 Mgt Level Meeting Between NRC & Lilco in Rockville,Md.Pp 1-87 ML20245K9371989-04-20020 April 1989 Transcript of Commission 890420 Affirmation/Discussion & Vote in Rockville,Md.Pp 1-5 ML20247R4421989-04-20020 April 1989 Transcript of Commission 890420 Press Conference in Rockville,Md.Pp 1-10 ML20245G5661989-04-17017 April 1989 Transcript of 890417 Discussion of Plant Full Power OL in Rockville,Md.Pp 1-70.Supporting Documentation Encl ML20236E1021989-03-0303 March 1989 Transcript of Commission 890303 Affirmation,Discussion & Vote in Rockville,Md Re SECY-89-77, Shoreham Sanction Decision. Pp 1-5 ML20247R4321989-03-0303 March 1989 Transcript of Commission 890303 Press Conference in Rockville,Md Re Shoreham Proceedings.Pp 1-10 ML20235V6301989-03-0101 March 1989 Testimony of F Kantor,Em Podolak & RT Hogan of NRC Staff on Scope of Exercise.* Purpose of Testimony Is to Rebut Testimony of Intervenors Re Contention 1 ML20235V3841989-03-0101 March 1989 Direct Testimony of Iw Husar & Jh Keller Concerning June 1988 Emergency Preparedness Exercise.* Certificate of Svc Encl.Related Correspondence ML20235N1221989-02-24024 February 1989 Rebuttal Testimony of Jr Asher,Dm Crocker,Rb Kelly,Jj Kozak & Cl Stovall on Contention 1 (Scope of Exercise).* Related Documentation Encl.Related Correspondence ML20235N1501989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 6 (Emergency Broadcast Sys Messages) & 7.E & F (Enc).* Attachments Encl. Related Correspondence ML20235N1641989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 18 (Communications Equipment & Reception Failures).* Related Correspondence ML20235Y5811989-02-21021 February 1989 Transcript of Commission Oral Argument on 890221 in Rockville,Md Re Sanction Issue in Shoreham Proceeding ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196F2881988-12-0606 December 1988 Transcript of 881206 Hearing in Bethesda,Md Re Plant. Pp 1-122 ML20154E4761988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Appeal of Initial Decision Concerning Emergency Exercise.Pp 1-91 ML20154E4631988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Util Reception Ctrs That Will Be Used in Event of Radiological Emergency.Pp 1-98 ML20151C3041988-07-19019 July 1988 Transcript of 880719 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,830-22,074.Witnesses:F Jones,We Regan, R Shepherd & D Davidoff ML20151B3391988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,537-21,720.Witnesses:N Kelly & D Axelrod ML20151B3671988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,721-21,829.Witnesses:N Kelly, D Axelrod & Aj Geramo ML20150E0791988-07-11011 July 1988 Transcript of 880711 Hearing in Bethesda,Md Re Emergency Planning.Pp 20,944-21,174 ML20150F7781988-07-11011 July 1988 Transcript of 880711 Evening Session in Bethesda,Md Re Emergency Planning.Pp 21,175-21,290.Witnesses:JD Papile & DA Devito ML20196J4891988-06-29029 June 1988 Transcript of 880629 Conference in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,929-20,943 ML20196A4261988-06-24024 June 1988 Transcript of 880624 Hearing in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,894-20,928 ML20155K5671988-06-17017 June 1988 Transcript of 880617 Telcon Hearing in Bethesda,Md Re Emergency Planning/School Bus Driver Issue.Pp 20,863-20,893 ML20154D1181988-06-15015 June 1988 Transcript of FEMA 880615 Public Meeting in Patchougue,Ny Re Util.Pp 1-131 ML20155E1751988-06-10010 June 1988 Transcript of 880610 Telcon in Washington,Dc Re Remand/ Emergency Planning.Pp 20,845-20,862 ML20197E3231988-06-0303 June 1988 Transcript of 880603 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 20,686-20,844.Supporting Documentation Encl.Witness:D Hartgen ML20154R2881988-06-0202 June 1988 Transcript of 880602 Hearing in Happauge,Ny Re Emergency Planning.Pp 20,555-20,685.Supporting Documentation Encl ML20197E0401988-05-31031 May 1988 Corrections to Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Bases & Accuracy of Lilco Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8571988-05-27027 May 1988 Transcript of 880527 Hearing in Hauppauge,Ny. Pp 20,440-20,554.Witness:T Urbanik ML20197E1201988-05-26026 May 1988 Surrebuttal Testimony of Dt Haertgen on Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8511988-05-26026 May 1988 Transcript of 880526 Hearing Re Emergency Planning/School Bus Driver Issue in Hauppauge,Ny.Pp 20,245-20,439.Supporting Documentation Encl.Witnesses:Bg Brodsky,Ej Doherty, Hm Koenig,Ar Rossi,Rw Petrilak,Nf Muto,Jt Smith,Rn Suprina ML20197E1631988-05-24024 May 1988 Addendum to Direct Testimony of Bg Brodsky,Ej Doherty, Hm Koenig,Nf Muto,Rw Petrilak,Ar Rossi,Jt Smith & Rn Suprina on Behalf of Suffolk County Re Contention 25.C.* W/ Certificate of Svc.Related Correspondence ML20154H7981988-05-18018 May 1988 Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Base & Accuracy of Lilco Hosp Evacution Time Estimates.Certificate of Svc Encl ML20154F7741988-05-18018 May 1988 Transcript of 880518 Hearing in Hauppauge,Ny. Pp 19,831-19,998.Witnesses:D Mileti,Mk Lindell,Rb Kelly ML20154F7421988-05-17017 May 1988 Transcript of 880517 Hearing in Hauppauge,Ny. Pp 19,612-19,830 ML20154D4751988-05-16016 May 1988 Transcript of 880516 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 19,390-19,611.Supporting Documentation Encl.Witnesses:Dm Crocker,D Mileti,Mk Lindell, RB Kelly ML20154D9221988-05-12012 May 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Immateriality Issues.* Hartgen Resume & Certificate of Svc Encl.Related Correspondence ML20153H6721988-05-10010 May 1988 Transcript of 880510 Prehearing Conference in Bethesda,Md. Pp 19,323-19,389 ML20154B4621988-05-10010 May 1988 Lilco Supplemental Testimony on Remanded Issue of Role Conflict of School Bus Drivers.* Certificate of Svc Encl ML20154B5421988-05-0606 May 1988 Testimony of DM Behr,Dm Crocker,Dp Dreikorn,Eb Lieberman & Ja Weismantle on Best Efforts Contentions EP 1-2,4-8 & 10.* Supporting Documentation & Certificate of Svc Encl.W/One Oversize Map.Related Correspondence ML20154B7841988-05-0606 May 1988 Direct Testimony of Gc Minor & Sc Sholly on Behalf of Suffolk County Re Immateriality.* Certificate of Svc Encl. Related Correspondence ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20151V9271988-04-28028 April 1988 Transcript of 880428 Hearing in Bethesda,Md Re Emergency Preparedness Exercise.Pp 1-94 ML20151Z0711988-04-28028 April 1988 Testimony of Jj Boursy.* Addresses Issue of Measured Signal Strength of Fm Radio Station Wplr,New Haven,Ct within EPZ for Plant.Related Correspondence ML20154B7061988-04-22022 April 1988 Deposition of D Axelrod.* Deposition Taken in Albany,Ny Re Emergency Planning ML20154H6621988-04-21021 April 1988 Deposition of Gc Minor.* Transcript of Gc Minor Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154H6311988-04-21021 April 1988 Deposition of Sc Sholly.* Transcript of Sc Sholly Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154B6861988-04-19019 April 1988 Deposition of Pg Halpin.* Deposition Taken in Happauge,Ny Re Emergency Planning/Best Efforts Issue ML20148S8511988-04-13013 April 1988 Testimony of T Urbanik Re Bases & Accuracy of Hosp Evacuation Time Estimates Contained in Rev 9 of Util Emergency Plan.Related Correspondence 1989-07-28
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20044A9301989-07-28028 July 1989 Transcript of 890728 Mgt Level Meeting Between NRC & Lilco in Rockville,Md.Pp 1-87 ML20245K9371989-04-20020 April 1989 Transcript of Commission 890420 Affirmation/Discussion & Vote in Rockville,Md.Pp 1-5 ML20247R4421989-04-20020 April 1989 Transcript of Commission 890420 Press Conference in Rockville,Md.Pp 1-10 ML20245G5661989-04-17017 April 1989 Transcript of 890417 Discussion of Plant Full Power OL in Rockville,Md.Pp 1-70.Supporting Documentation Encl ML20236E1021989-03-0303 March 1989 Transcript of Commission 890303 Affirmation,Discussion & Vote in Rockville,Md Re SECY-89-77, Shoreham Sanction Decision. Pp 1-5 ML20247R4321989-03-0303 March 1989 Transcript of Commission 890303 Press Conference in Rockville,Md Re Shoreham Proceedings.Pp 1-10 ML20235V6301989-03-0101 March 1989 Testimony of F Kantor,Em Podolak & RT Hogan of NRC Staff on Scope of Exercise.* Purpose of Testimony Is to Rebut Testimony of Intervenors Re Contention 1 ML20235V3841989-03-0101 March 1989 Direct Testimony of Iw Husar & Jh Keller Concerning June 1988 Emergency Preparedness Exercise.* Certificate of Svc Encl.Related Correspondence ML20235N1221989-02-24024 February 1989 Rebuttal Testimony of Jr Asher,Dm Crocker,Rb Kelly,Jj Kozak & Cl Stovall on Contention 1 (Scope of Exercise).* Related Documentation Encl.Related Correspondence ML20235N1501989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 6 (Emergency Broadcast Sys Messages) & 7.E & F (Enc).* Attachments Encl. Related Correspondence ML20235N1641989-02-24024 February 1989 Lilco Rebuttal Testimony on Contention 18 (Communications Equipment & Reception Failures).* Related Correspondence ML20235Y5811989-02-21021 February 1989 Transcript of Commission Oral Argument on 890221 in Rockville,Md Re Sanction Issue in Shoreham Proceeding ML20247R4091988-12-31031 December 1988 Transcript of Commission 881221 Press Conference in Rockville,Md.Pp 1-31 ML20196F2881988-12-0606 December 1988 Transcript of 881206 Hearing in Bethesda,Md Re Plant. Pp 1-122 ML20154E4761988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Appeal of Initial Decision Concerning Emergency Exercise.Pp 1-91 ML20154E4631988-09-14014 September 1988 Transcript of 880914 Hearing in Bethesda,Md Re Util Reception Ctrs That Will Be Used in Event of Radiological Emergency.Pp 1-98 ML20151C3041988-07-19019 July 1988 Transcript of 880719 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,830-22,074.Witnesses:F Jones,We Regan, R Shepherd & D Davidoff ML20151B3391988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,537-21,720.Witnesses:N Kelly & D Axelrod ML20151B3671988-07-14014 July 1988 Partial Transcript of 880714 Hearing in Bethesda,Md Re Emergency Planning.Pp 21,721-21,829.Witnesses:N Kelly, D Axelrod & Aj Geramo ML20150E0791988-07-11011 July 1988 Transcript of 880711 Hearing in Bethesda,Md Re Emergency Planning.Pp 20,944-21,174 ML20150F7781988-07-11011 July 1988 Transcript of 880711 Evening Session in Bethesda,Md Re Emergency Planning.Pp 21,175-21,290.Witnesses:JD Papile & DA Devito ML20196J4891988-06-29029 June 1988 Transcript of 880629 Conference in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,929-20,943 ML20196A4261988-06-24024 June 1988 Transcript of 880624 Hearing in Bethesda,Md Re Remand/ Emergency Planning.Pp 20,894-20,928 ML20155K5671988-06-17017 June 1988 Transcript of 880617 Telcon Hearing in Bethesda,Md Re Emergency Planning/School Bus Driver Issue.Pp 20,863-20,893 ML20154D1181988-06-15015 June 1988 Transcript of FEMA 880615 Public Meeting in Patchougue,Ny Re Util.Pp 1-131 ML20155E1751988-06-10010 June 1988 Transcript of 880610 Telcon in Washington,Dc Re Remand/ Emergency Planning.Pp 20,845-20,862 ML20197E3231988-06-0303 June 1988 Transcript of 880603 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 20,686-20,844.Supporting Documentation Encl.Witness:D Hartgen ML20154R2881988-06-0202 June 1988 Transcript of 880602 Hearing in Happauge,Ny Re Emergency Planning.Pp 20,555-20,685.Supporting Documentation Encl ML20197E0401988-05-31031 May 1988 Corrections to Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Bases & Accuracy of Lilco Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8571988-05-27027 May 1988 Transcript of 880527 Hearing in Hauppauge,Ny. Pp 20,440-20,554.Witness:T Urbanik ML20197E1201988-05-26026 May 1988 Surrebuttal Testimony of Dt Haertgen on Behalf of State of Ny Re Hosp Evacuation Time Estimates.* Certificate of Svc Encl ML20154M8511988-05-26026 May 1988 Transcript of 880526 Hearing Re Emergency Planning/School Bus Driver Issue in Hauppauge,Ny.Pp 20,245-20,439.Supporting Documentation Encl.Witnesses:Bg Brodsky,Ej Doherty, Hm Koenig,Ar Rossi,Rw Petrilak,Nf Muto,Jt Smith,Rn Suprina ML20197E1631988-05-24024 May 1988 Addendum to Direct Testimony of Bg Brodsky,Ej Doherty, Hm Koenig,Nf Muto,Rw Petrilak,Ar Rossi,Jt Smith & Rn Suprina on Behalf of Suffolk County Re Contention 25.C.* W/ Certificate of Svc.Related Correspondence ML20154H7981988-05-18018 May 1988 Rebuttal Testimony of Eb Lieberman & Dp Dreikorn on Remanded Issue of Base & Accuracy of Lilco Hosp Evacution Time Estimates.Certificate of Svc Encl ML20154F7741988-05-18018 May 1988 Transcript of 880518 Hearing in Hauppauge,Ny. Pp 19,831-19,998.Witnesses:D Mileti,Mk Lindell,Rb Kelly ML20154F7421988-05-17017 May 1988 Transcript of 880517 Hearing in Hauppauge,Ny. Pp 19,612-19,830 ML20154D4751988-05-16016 May 1988 Transcript of 880516 Hearing in Hauppauge,Ny Re Emergency Planning/School Bus Driver Issue.Pp 19,390-19,611.Supporting Documentation Encl.Witnesses:Dm Crocker,D Mileti,Mk Lindell, RB Kelly ML20154D9221988-05-12012 May 1988 Direct Testimony of Dt Hartgen,On Behalf of State of Ny Re Immateriality Issues.* Hartgen Resume & Certificate of Svc Encl.Related Correspondence ML20153H6721988-05-10010 May 1988 Transcript of 880510 Prehearing Conference in Bethesda,Md. Pp 19,323-19,389 ML20154B4621988-05-10010 May 1988 Lilco Supplemental Testimony on Remanded Issue of Role Conflict of School Bus Drivers.* Certificate of Svc Encl ML20154B5421988-05-0606 May 1988 Testimony of DM Behr,Dm Crocker,Dp Dreikorn,Eb Lieberman & Ja Weismantle on Best Efforts Contentions EP 1-2,4-8 & 10.* Supporting Documentation & Certificate of Svc Encl.W/One Oversize Map.Related Correspondence ML20154B7841988-05-0606 May 1988 Direct Testimony of Gc Minor & Sc Sholly on Behalf of Suffolk County Re Immateriality.* Certificate of Svc Encl. Related Correspondence ML20154C7511988-05-0404 May 1988 Transcript of 880504 Annual Briefing on State of Nuclear Industry in Rockville,Md.Pp 1-60. Introductory Remarks, State of Industry Rept & Status Rept on Util Research... Encl.Served on 880509 ML20151V9271988-04-28028 April 1988 Transcript of 880428 Hearing in Bethesda,Md Re Emergency Preparedness Exercise.Pp 1-94 ML20151Z0711988-04-28028 April 1988 Testimony of Jj Boursy.* Addresses Issue of Measured Signal Strength of Fm Radio Station Wplr,New Haven,Ct within EPZ for Plant.Related Correspondence ML20154B7061988-04-22022 April 1988 Deposition of D Axelrod.* Deposition Taken in Albany,Ny Re Emergency Planning ML20154H6621988-04-21021 April 1988 Deposition of Gc Minor.* Transcript of Gc Minor Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154H6311988-04-21021 April 1988 Deposition of Sc Sholly.* Transcript of Sc Sholly Deposition in Washington,Dc Re Emergency Planning.Supporting Documentation Encl.Related Correspondence ML20154B6861988-04-19019 April 1988 Deposition of Pg Halpin.* Deposition Taken in Happauge,Ny Re Emergency Planning/Best Efforts Issue ML20148S8511988-04-13013 April 1988 Testimony of T Urbanik Re Bases & Accuracy of Hosp Evacuation Time Estimates Contained in Rev 9 of Util Emergency Plan.Related Correspondence 1989-07-28
[Table view] |
Text
f s-D{N!"
T2 UiY 10 P1 :1" UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
LONG ISLAND LIGHTING COMPANY
)
Docket No. 50-322 (OL)
)
(Shoreham Nuclear Power Station,
)
S 4
Unit 1)
)
O TESTIMONY OF STEVEN J. STARK 9
Ig FOR THE LONG ISLAND LIGHTING COMPANY M
ON SUFFOLK COUNTY CONTENTION 28(a)(i) ANDS (g j/
~~
CONTENTION 7A(1) -- ECCS CUT-OFF f
y 3
i N
PURPOSE This testimony shows that installation of the automatic restart feature for low pressure ECCS recommended by NUREG-0737, Item II.K.3.21 would not significantJy improve, and might even decrease, the safety of the planc.
An automatic restart feature already exists for the high pressure emergency core cooling system.
The BWR Owners' Group symptom-oriented Emergency Procedure Guidelines, the Shoreham emergency oper-ating procedures and operator training ensure that the function to be performed by the proposed automatic restart feature for low pressure ECCS will be performed by the operator.
This tes-timony shows that automatic restart logic for the low pressure SD3 D
ECCS would have a negative impact on the plant by reducing r
plant operational flexibility and increasing system complexity.
/[
8205120369 820510 PDR ADOCK 05000322 T
PDR
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of
)
)
LONG ISLAND LIGHTING COMPANY
)
Docket No. 50-322 (OL)
)
(Shoreham Nuclear Power Station,
)
Unit 1)
)
TESTIMONY OF STEVEN J.
STARK FOR THE LONG ISLAND LIGHTING COMPANY ON SUFFOLK COUNTY CONTENTION 28(a)(i) AND SOC CONTENTION 7A(1) -- ECCS CUT-OFF 1.
Q.
Please state your name and business address.
A.
My name is Steven J.
Stark.
My business address is the General Electric Company, 175 Curtner Avenue, San Jose, California.
2.
Q.
What is your position with the General Electric Company?
A.
I am the Manager of BWR Evaluation Programs, Nuclear Energy Business Operations.
3.
Q.
Please state your professional qualifications.
A.
My resume, which appears on pages 12-13, describes my professional qualifications.
My familiarity with the
(
issues raised in SC Contention 28(a)(i) and SOC Contention 7(A)(1) stems from my current position.
I have had primary responsibility for working with the BWR Owners' Group in addressing post-TMI requirements for BWRs including NUREG-0737, Item II.K.3.21.
4.
Q.
What do SC Contention 28(a)(i) and SOC Contention 7A(1) involve?
A.
At the outset, let me note that these two contentions are identical; thus my remarks apply equally to both.
These contentions allege that Shoreham does not comply with 10 CFR S 50.46 and S 50.55a(h) because the recom-mendations of NUREG-0737, Item II.K.3.21 have not been met.
5.
Q.
What does Item II.K.3.21 recommend?
A.
This item recommends that the core spray and low pres-sure coolant injection systems of a BWR have the capa-bility to restart automatically following shut off by the operator if the low-low water level initiation signal is still present.
6.
Q.
Does Shoreham have an automatic restart feature?
l L
A.
The emergency core cooling system (ECCS) design for Shoreham consists of four systems to protect the core against various hypothetical pipe breaks.
Three sys-tems inject water into the core and one is a reactor vessel automatic depressurization system (ADS).
The three injection systems are the high pressure coolant injection (HPCI) system, low pressure coolant injec-tion (LPCI) system, and core spray (CS) system.
The HPCI system for the Shoreham plant will restart automatically following manual termination if the nec-essary signals of low reactor water level or high dry-well pressure persist or reappear.
The HPCI pump will supply minimum rated flow of 4250 gpm to the vessel down to a vessel pressure of 147 psig.
Below 147 psig flow rate drops as steam pressure drops.
This system will automatically provide significant core cooling
~
should the operator attempt to manually shut off the systems.
The low pressure ECCS (LPCI and CS) do not automati-cally restart following manual termination.
7.
Q.
Please explain what you mean when you say they will not restart automatically.
A.
The motor control switch for each CS and LPCI pump has four positions:
start, auto, stop and pull to lock.
The switch will spring return from start and stop to the auto position.
When the switch is turned to the start position, the pump will operate.
In the auto position, tSe pump will be ready for automatic opera-tion if called upon.
When the switch is turned to the stup position, the pump stops.
In the pull to lock position, the pump also will not run.
This last position is used for maintenance to ensure the safety of persons working on the system.
In the event a loss of coolant accident causes the pump to start when the switch is in auto, it will con-tinue to run until the operator manually turns it off.
When the pump is secured manually and the switch re-turns to auto, the pump will not automatically restart if an actuation signal persists or returns unless the operator manually resets the system logic.
In other j
words, the operator must take action to return the system to the automatic mode.
t 8.
Q.
Why doesn' t Shoreham have a so-called automatic re-l start capability following manual termination?
i l
l 2
l
. i A.
The automatic restart of the low pressure ECCS follow-ing manual termination was considered by General Electric and the BWR Owners' Group in response to NUREG-0737, Item II.K.3.21.
The study concluded that an automatic restart capability would, on balance, detract from plant safety.
This conclusion rests on several factors.
First, the implemantation of the j
Reactor Pressure Vessel (RPV) control guideline of the Emergency Procedure Guidelines (EPG's), coupled with operator training, would ensure that the restart of the necessary low pressure ECCS at low RPV level would be performed by the operator.
Second, automating the restart capability would reduce operator flexibility in controlling the low pressure ECCS.
And third, the increased system complexity resulting from automatic restart logic would reduce system reliability.
9.
Q.
Why does the RPV control guideline of the EPG's help ensure that proper action is taken?
A.
The EPG's are guidelines to be used by individual uti-i lities in developing plant specific operating proce-dures.
They include operator instructions based on the existence of certain symptoms rather than the oc-currence and identification of a specific accident.
The RPV control guideline addresses symptoms that
include those that would automatically initiate the low pressure ECCS -- low RPV water level or high dry-well pressure.
The EPG's instruct the operator to control vessel water level based on the same symptoms that would cause the low pressure ECCS to automati-cally restart if that logic were installed.
In this case, however, the operator is alerted to either of these conditions by the instrumentation displays and alarms in the control room.
Consequently, the use of the EPG's coupled with operator training will provide for highly reliable manual control of RPV level during post-LOCA operations.
This precludes the need for additional logic changes to provide automatic restart for the low pressure ECCS of the sort contemplated by NUREG-0737, Item II.K.3.21.
10.
Q.
Has LILCO used the EPG's in developing its emergency procedures for Shoreham?
A.
Yes.
The station procedures developed from the EPG's to respond to these emergency conditions emphasize restoration and maintenance of the RPV water level.
They present a concise action sequence to the operator so that he can respond to accident or transient events.
11.
Q.
And are the operators trained to recognize when these procedures should be used?
A.
Yes.
The operators will be trained to use these pro-
)
cedures when any of the following conditions are pre-sent:
(a) low RPV water level 1
(b) high drywell pressure l
(c) an isolation condition requiring or initiating a reactor scras The operators have been trained to be acutely aware of the need to maintain RPV water level following a LOCA.
The operator has redundant Class IE water level indi-cation for monitoring RPV level.
The operator will also be alerted to low water level condition' by audio and visual annunciators.
In addition, the operator will have time available to react to low water 'evel conditions. At least 15 minutes would elapse between I
the time " Level 1" (the lowest alarm level) is reached i
and the occurrence of 2200*F fuel clad temperature given zero reactor make-up flow.
This assumes a large break in the recirculation system.
If the break caus-ing the LOCA is isolated, at least 30 minutes would be available.
l 12.
Q.
The second reason you gave for not installing auto-matic restart in the low pressure ECCS is reduced sys-tems operational flexibility.
Please explain.
A.
Use of automatic restart of low pressure ECOS would reduce the flexibility the operator now has in con-trolling these systems.
In certain instances, it may be necessary to shut down an ECCS pump during a LOCA.
The existing system design allows that to be done in order to maintain the plant in a safe condition.
A design change to install the automatic restart de-scribed in the contention would inhibit this capa-bility.
13.
Q.
Under what conditions would an operator want to be able to secure an ECCS pump during a LOCA?
A.
Examples of conditions that might require shutting down an ECCS pump during a LOCA include excessive ECCS pump seal leakage, breaks in ECCS piping and failure of an ECCS pump motor.
As will be discussed later, complicated control logic could be designed to cope with some but not all of the circumstances that might exist during extended post-LOCA operation.
14.
Q.
Without a manual cut-off, what sorts of changes in plant conditions would require complicated logic or, possibly, would be precluded?
A.
If, as would be expected following a LOCA, a high dry-well signal persisted, the operator might not be able to conduct necessary changes in plant conditions unless he could manually stop selected ECCS pumps.
Operators must make decisions on the use of a number of cystems based on the conditions present following an accident.
Changes in plant conditions involving core cooling, suppression pool cooling, emergency die-sel generator load assignment and drywell cooling all must be considered.
Specific examples in which a man-ual shutoff would be desirable include the following:
{
l (a)
Electrical loads might have to be controlled I
by selectively securing some equipment (such as low pressure ECCS) for a short time so that other equipment could be started without overloading emergency power supplies.
(b)
Core cooling might be maintained by the core spray system while the RHR system maintains containment cooling.
An automatic restart shift-l ing the RHR system back to the LPCI mode would not be necessary or desirable.
l
Thus, significant flexibility is gained by having the capability to manually secure low pressure ECCS.
Installation of an automatic restart capability might interfere with these necessary plant operations, thus reducing the operator's ability to maintain the plant in a safe condition.
15.
Q.
The third reason you mentioned for not installing au-tomatic restart was the increased complexity that would result.
Please explain.
A.
Existing ECCS logic would have to be modified so that, even though the system was manually turned off, the i
pumps would restart if a LOCA signal persisted or reappeared.
Furthermore, for long term control of the reactor, the logic would become even more complicated.
j l
As already explained, ira a post-LOCA situation changes in plant operations involving the low pressure ECCS operation might have to take place.
The design of the automatic restart logic would have to anticipate the combinations of equipment that could be in use and then incorporate the appropriate controls to realign systems for automatic operation. These logic changes would not be impossible but would significantly in-crease system complexity.
l l
l
16.
Q.
Please summarize your testimony.
A.
The current design of the low pressure ECCS control circuitry for Shoreham provides the best approach for overall reactor safety.
The installation of an auto-matic restart capability for low pressure,ECCS offers no significant benefits.
First, the HPCI system already has restart capability and can provide signif-icant core cooling down to low RPV pressures.
And second, the EPG's, the Shoreham emergency operating procedures developed from them, and operator training ensure that the operator will perform the same func-tion as the auto-restart feature -- maintain RPV level.
On the other hand, the installation of auto restart would have significant drawbacks in reduced operation-al flexibility and increased system complexity.
On balance, the change in design would not improve the safety of the plant.
1
Steven J.
Stark Manager, BWR Evaluation Programs Nuclear Energy Business Operations General Electric Company My name is Steven J.
Stark.
My business address is General Electric Company, 175 Curtner Avenue, San Jose, California.
I have been Manager of BWR Evaluation Programs since September 1979, responsible for providing licensing direction and program management of General Electric's response to post-TMI require-ments.
A major responsibility in this position has been the provision of support to the BWR Owners' Group and domestic uti-lities on an individual basis for their response to post-TMI requirements, such as those contained in NUREG-0737.
I graduated from the University of California at Berkeley in 1968 with a Bachelor of Science Degree in Mechanical Engineering.
After three years of engineering experience at General Electric and completion of GE's Advanced Engineering Courses, I returned to the University of California and re-ceived a Master of Science Degree in 1972, also in Mechanical Engineering.
Prior to my current assignment, I was Manager of Mark I and II Containment Engineering from September 1976 to September 1979.
In this position I was responsible for managing the evaluation of the containment response to design basis transients and accidents.
This responsibility included evaluations of the l
containment environmental conditions, containment structural loading and safety / relief valve (S/RV) discharge loading.
The work performed by this unit covered the performance of tests, including in plant S/RV tests, verification of analytical models and the analysis of transients and accidents by the ap-plication of analytical models.
From September 1975 to September 1976 I held the position of l
Senior Engineer, Technical Leader in the Requisition Plant Containment Systems Unit, responsible for evaluating the hydro-dynamic loading on Mark I containments due to loss of coolant accidents and S/RV discharges.
From June 1974 to September 1975 I held the position of Engineer in the Nuclear Steam Supply Methods Unit responsible for developing advanced analy-tical methods and computer codes for the evaluation of the per-formance of Emergency Core Cooling Systems following loss-of-l coolant accidents.
1 From July 1972 to June 1974 I held the position of Supervisor, l
Engineering Training Program.
From December 1968 to July 1972 l
I participated in General Electric's Engineering Training i
l Program taking several 6 month rotating work assignments to gain a broad overview of the work of the Nuclear Energy Business Operations.
t f
i s
l l