Issue date | Title | Topic | |
---|---|---|---|
ML022960228 | 15 October 2002 | Meeting Handout for Exelon/Amergen Licensing Meeting with NRC | |
ML031410283 | 21 May 2003 | Meeting Handouts to Discuss Licensing Issues and Upcoming Licensing Activities for the Exelon Fleet of Nuclear Power Plants | Exemption Request |
ML033440348 | 9 December 2003 | Meeting Handout to Discuss Licensing Issues and Upcoming Licensing Activities with the Exelon Fleet of Nuclear Plants | Surveillance Frequency Control Program |
ML040980524 | 11 March 2004 | March 11, 2004 - RIC 2004 Presentation - T11 - Christopher Crane - Emergent Technical Topics | Flow Induced Vibration |
ML042730260 | 23 September 2004 | Meeting Presentation, Extended Power Uprate (EPU) Vibration Assessment and Vulnerability Review | Reactor Vessel Water Level Non-Destructive Examination |
ML043000287 | 19 October 2004 | Presentation from 10/19/2004 Meeting with Exelon Nuclear, Quad Cities Unit 1 Steam Dryer Instrumentation and Refined Acoustic Model | |
ML043440071 | 2 December 2004 | December 2, 2004, Meeting with Exelon Re Generator Rotor and Steam Dryer Meeting | Finite Element Analysis |
ML051930315 | 30 June 2005 | June 30, 2005, Closed Meeting Handouts | |
ML070510139 | 16 February 2007 | 2007 Emergency Preparedness and Incident Response Public Meeting: Status of the EP Threat Based Project, 2/16/07 | B.5.b Mitigating Strategies |
ML071440464 | 23 May 2007 | End-of-Cycle Meeting - NRC Slides | |
ML081200784 | 2 June 2008 | Meeting Slides, Nrc/Exelon Licensing Counterparts Meeting. | |
ML081220979 | 30 April 2008 | Meeting Slides, Dresden Annual Assessment Meeting, Reactor Oversight Program - Cy 2007. | |
ML091400338 | 14 May 2009 | Slides Presented at the Dresden Station 2008 EOC Public Meeting | |
ML091980363 | 20 August 2009 | Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes | Cyber Security |
ML120870140 | 27 March 2012 | Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR | |
ML13149A206 | 22 May 2013 | NRC Slides from Public Meeting | |
ML14232A785 | 19 May 2014 | Fuel Transition License Amendment Request Pre-Submittal Update Meeting | |
ML15013A156 | 14 January 2015 | Meeting Slide Regarding Dresden Nuclear Power Station Pre-Application Meeting for Providing Natural Gas as a Primary Fuel to Station Auxiliary Heating Boilers | Safe Shutdown |
ML16075A329 | 16 March 2016 | OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations | Anticipated operational occurrence Enforcement Discretion Probabilistic Risk Assessment Significance Determination Process Open Phase Condition Risk-Informed Steering Committee Fuel cladding Generic Issues Program Backfit |
ML16077A156 | 22 March 2016 | Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards | |
ML16189A255 | 7 July 2016 | Annual Assessment Meeting/Open House (Hand Out) | Ultimate heat sink Spent Fuel Pool Instrumentation Containment Hardened Vent Open House |
ML17142A238 | 25 May 2017 | OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns | Probabilistic Risk Assessment Operator Manual Action FLEX Significance Determination Process |
ML17156A797 | 5 June 2017 | Presentation for 2016 Dresden Nuclear Power Station EOC Open House | Open House |
ML17252A157 | 14 September 1977 | Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program | |
ML18054B359 | 27 February 2018 | Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli | |
ML18319A127 | 19 November 2018 | Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas | High Radiation Area Deep Dose Equivalent |
ML18334A216 | 30 November 2018 | Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 | GOTHIC |
ML18347B314 | 19 December 2018 | Bwrvip/Asme Relief Request Discussion December 19, 2018 | |
ML19022A200 | 23 January 2019 | Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants | Loop seal |
ML19151A660 | 31 May 2019 | BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19318F951 | 20 November 2019 | Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency | Grace period |
ML20163A655 | 16 June 2020 | 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections | Pandemic Coronavirus |
ML20169A559 | 16 June 2020 | Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) | Pandemic Coronavirus |
ML20170B021 | 23 June 2020 | NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections | Boric Acid Weld Overlay Nondestructive Examination Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20178A420 | 30 June 2020 | NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response | Exemption Request Pandemic Coronavirus |
ML20238B857 | 25 August 2020 | Quad 2019 Hq Online EOC Slides | Coronavirus |
ML20258A030 | 22 September 2020 | Decommissioning Licensing Action Submittal Plan for Byron and Dresden Stations Early Shutdowns | |
ML20261G732 | 16 September 2020 | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | Incorporated by reference Exemption Request |
ML21194A182 | 13 July 2021 | and Quad Cities Nuclear Generating Stations 2020 Annual Assessment Meeting Slides | Coronavirus |
ML21314A447 | 10 November 2021 | Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval | Moisture barrier |
ML23145A132 | 27 June 2023 | June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - Constellation Slides | License Renewal Subsequent License Renewal Power Uprate |
ML23165A024 | 27 June 2023 | June 27, 2023, Dresden Nuclear Power Station Subsequent License Renewal Environmental Pre-application Public Meeting - NRC Slides | |
ML23173A046 | 28 June 2023 | DNPS SLR Pre-submittal Meeting Presentation Rev. 1 | Aging Management License Renewal Subsequent License Renewal Power Uprate |
ML23173A047 | 28 June 2023 | SLRA - NRC Presubmittal Meeting Slides - 6-28-23 | |
ML23255A104 | 11 August 2023 | Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout | |
ML23317A071 | 14 November 2023 | NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) | |
ML24029A174 | 30 January 2024 | Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion | |
RS-14-238, Transmittal of Proprietary Meeting Slides | 25 August 2014 | Transmittal of Proprietary Meeting Slides |