Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML01352005922 January 2002Amendment Incorporation of Changes to 10 CFR 50.59, Changes, Tests and Experiments (Tac No. MB2434)
ML0201005788 February 2002Amendment Deletes Specification for Hydrogen Monitoring Instrumentation from Technical Specification,Post Accident Monitoring
Probabilistic Risk Assessment
Severe Accident Management Guideline
Exemption Request
Fuel cladding
ML02255067523 September 2002License Amendment Licenced Operator Qualifications and Training (Tac No. MB2699)
ML03016066916 January 2003Amendment 242 to License DPR-50 Emergency Feedwater Technical Specification Change RequestSafe Shutdown
Probabilistic Risk Assessment
ML0309302083 April 2003(TMI-1), Amendment No. 243, Relocation of Emergency Diesel Generator Maintenance Requirements to Updated Final Safety Analysis Report (UFSAR) (Tac No. MB4850)Maintenance Rule Program
Grace period
ML03205021214 August 2003License Amendment, Defer Containment Integrated Leak Rate TestProbabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
ML03232004623 September 2003License Amendment, Delete Reactor Building Purge Air Treatment SystemOffsite Dose Calculation Manual
ML03260001720 October 2003(TMI-1).Anticipated operational occurrence
ML03268061730 September 2003(TMI-1), Issuance of Amendment 246 Containment Isolation ValvesShutdown Margin
Offsite Dose Calculation Manual
Stroke time
Power-Operated Valves
ML03314038312 December 2003License Amendment, Delete the Requirements for the Auxiliary and Fuel Handling Building Air Treatment System,Probabilistic Risk Assessment
ML04134001827 May 2004Unit 1, License Amendment, Conforming Amendments to Reflect Ownership ChangeSafe Shutdown
ML04156004113 July 2004Unit, 1, License Amendments 244 and 250 Re.: Amendments to Delete a License Condition Regarding the Long Range Planning ProgramSafe Shutdown
Shutdown Margin
Safeguards Contingency Plan
Fire Protection Program
ML04166036413 July 2004Amendment, Reactor Building Tendon Surveillance CriteriaIncorporated by reference
ML04225052022 November 2004License Amendment 253, Regarding Elimination Requirements for Post-Accident Sampling SystemGrab sample
ML0427100148 November 2004Unit 1 Amendments to Relocated the Independent Onsite Safety Review Group Function to the Quality Assurance Topical Report
ML04312000928 October 2004Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat (Dbt)...Safe Shutdown
Fire Protection Program
ML05098022917 June 2005License Amendment - Monthly Operating Reports and Annual Occupational Radiation ReportsReactor Vessel Water Level
ML05188001512 August 2005Amendment Missed Surveillance Criteria Requirements and Addition of a Technical Specifications Bases Control ProgramEnforcement Discretion
Probabilistic Risk Assessment
Missed surveillance
Large early release frequency
ML05201017910 August 2005Issuance of Amendment Extension of Reactor Trip System and Reactor Trip Device Functional Test Intervals
ML05229047630 August 2005TMI, Unit 1 - Correction of Errors in Amendment No. 255 Extension on Reactor Trip System and Reactor Trip Device Functional Test Intervals
ML05266039713 October 2005Issuance of Amendment Re. Elimination of Containment Equipment Hatch Closure Requirement During RefuelingHigh winds
Offsite Dose Calculation Manual
Tornado Missile
ML0610001318 April 2006Issuance of Emergency Amendment 258 Allowed Outage Time Extension from 7 Days to 10 Days for Emergency Diesel Generator EG-Y-1ASafe Shutdown
High winds
Probabilistic Risk Assessment
Large early release frequency
ML06297050118 January 2007License Amendment, Administrative Change to Page 4 in Conjunction with the Commission Order EA-06-037 Regarding Updated Design Basis ThreatSafe Shutdown
Fire Protection Program
ML0702505237 February 2007License Amendment, Modified Technical Specification Regarding Containment Airlock Surveillance Frequency (Technical Specification Change No. 84)
ML07094044125 May 2007License Amendment, Issuance of License Amendment Deleting Technical Specification Regarding Annual Occupational Radiation Exposure Report (Technical Specification Change Request No. 85) (TAC No. J00318)High Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML07165051929 June 2007Issuance of License Amendment 259, One-Time Type a Test Interval ExtensionProbabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
ML07198001618 July 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026Safe Shutdown
B.5.b
Severe Accident Management Guideline
B.5.b Mitigating Strategies
ML07198001818 July 2007Revised Pages of Facility Operating License No. DPR-50Safe Shutdown
ML07268001315 October 2007Issuance of Amendment 262 Regarding Reactor Coolant System Pressure-Temperature LimitAnticipated operational occurrence
ML08060033028 August 2008License Amendment, TSTF Change Traveler TSTF-479 & TSTF-497Incorporated by reference
ML08086067025 July 2008Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Issuance of Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators. (Tacs MD6364Job Performance Measure
ML08091012216 April 2008Issuance of Amendment Regarding Control Room Envelope HabitabilitySafe Shutdown
Time of Discovery
Earthquake
ML08239070721 August 2008Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating LicensesFire Protection Program
ML08275005523 December 2008Draft Amendment to Facility Operating LicenseSafe Shutdown
Fire Protection Program
Scaffolding
ML0827705688 January 2009Unit 1, Issuance of Conforming Amendments Direct Transfer of Facility Operating License to Exelon Generation Co., LLCSafe Shutdown
Hydrostatic
Emergency Lighting
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Safeguards Contingency Plan
Fire Protection Program
Scaffolding
Unidentified leakage
ML08282036924 February 2009Issuance of Amendment Deletion of Technical Specifications for Review and Audit, and Additional Administrative ChangesHigh Radiation Area
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
Scaffolding
ML08350021723 March 2009Issuance of Amendments Related to Removal of References to NRC Generic Letter 82-12Safe Shutdown
Offsite Dose Calculation Manual
Process Control Program
Safeguards Contingency Plan
Fire Protection Program
Scaffolding
ML0911100851 May 2009Enclosure 1- Gpu Nuclear, Inc. Three Mile Island Nuclear Station, Unit 2 Docket No. 50-320- Amendment to Facility Possession- Only LicenseFire Protection Program
ML09231053015 September 2009Issuance of Amendment Technical Specification Changes to Reflect Steam Generator ReplacementShutdown Margin
Probabilistic Risk Assessment
Nondestructive Examination
Scaffolding
ML09271040122 October 2009Issuance of Renewed Facility Operating License No. DPR-50 for Three Mile Island, Unit 1Safe Shutdown
Safeguards Contingency Plan
License Renewal
Fire Protection Program
Scaffolding
ML09271041022 October 2009Enclosure 1 - Exelon Generation Company, LLC - Renewed Facility Operating LicenseSafe Shutdown
Fire Protection Program
Scaffolding
ML09274079127 May 2010Issuance of Amendment Technical Specification Changes to Reflect Control Rod Drive Control System UpgradeSafe Shutdown
Anticipated operational occurrence
Commercial Grade Dedication
Fire Protection Program
ML10032049311 March 2010License Amendment Technical Specification Changes Adopting TSTF-490-A, Revision 0, Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical SpecificationSafe Shutdown
Offsite Dose Calculation Manual
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
Power change
ML10312006912 January 2011Issuance of Amendment Request to Relocate Surveillance Frequencies to a Licensee Controlled ProgramSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Probabilistic Risk Assessment
Incorporated by reference
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Fire Protection Program
Backfit
Power change
ML11186134110 August 2011Issuance of License Amendments Regarding Exelon Cyber Security PlanSafe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML11215048622 August 2011Issuance of Amendment Relocation of Equipment Load List from Technical Specifications to Updated Final Safety Analysis ReportSafe Shutdown
Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
ML11236058114 September 2011Issuance of Amendment Maximum Allowable Power with Inoperable Main Steam Safety ValvesSafe Shutdown
Anticipated operational occurrence
Cyber Security
Fire Protection Program
ML1210804377 May 2012Issuance of Amendment Administrative Technical Specification ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Hydrostatic
Cyber Security
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Power Operated Valves
Fire Protection Program
ML12209A3924 September 2012Issuance of Amendment Revision to Steam Generator Program Inspection Frequencies and Tube Sample SelectionSafe Shutdown
Shutdown Margin
Hydrostatic
Nondestructive Examination
Cyber Security
Fire Protection Program
ML13325A02313 December 2013Issuance of Amendment Revision to the Pressure and Temperature Limit Curves and the Low Temperature Overpressure Protection LimitsSafe Shutdown
Hydrostatic
Cyber Security
Surveillance Frequency Control Program
Exemption Request
Fire Protection Program