LR-N02-0027, PSEG Nuclear, Llc., Application for Amendment to Licenses DPR-70 to Change TS Missed Surveillance Requirements (T.S. 4.0.3) & Adoption of TS Bases Control Program | 25 July 2002 | PSEG Nuclear, Llc., Application for Amendment to Licenses DPR-70 to Change TS Missed Surveillance Requirements (T.S. 4.0.3) & Adoption of TS Bases Control Program | Time of Discovery Offsite Dose Calculation Manual Incorporated by reference Missed surveillance Annual Radioactive Effluent Release Report Maintenance Rule Program |
LR-N02-0106, Request for Change to Technical Specifications Requirements, Supplemental Request One-Time Extension to Increase the Interval of the Integrated Leak Rate Test from Ten to Fifteen Years | 22 March 2002 | Request for Change to Technical Specifications Requirements, Supplemental Request One-Time Extension to Increase the Interval of the Integrated Leak Rate Test from Ten to Fifteen Years | Probabilistic Risk Assessment |
LR-N02-0244, Request for Changes to Technical Specifications Refueling Operations - Relaxation of Requirements Applicable During Movement of Irradiated Fuel | 29 July 2002 | Request for Changes to Technical Specifications Refueling Operations - Relaxation of Requirements Applicable During Movement of Irradiated Fuel | Control of Heavy Loads |
LR-N02-0315, Request for Change to Technical Specifications to Reflect New Setpoints and Allowable Values for Steam Generator Low-Low Level Trip | 26 September 2002 | Request for Change to Technical Specifications to Reflect New Setpoints and Allowable Values for Steam Generator Low-Low Level Trip | |
LR-N02-0344, Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area. | 23 October 2002 | Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area. | High Radiation Area Offsite Dose Calculation Manual Process Control Program |
LR-N03-0022, Revision to Request for Change to Technical Specifications | 14 February 2003 | Revision to Request for Change to Technical Specifications | Boric Acid Shutdown Margin |
LR-N03-0092, Request for Change to TSs Explosive Gas Mixture | 6 June 2003 | Request for Change to TSs Explosive Gas Mixture | Anticipated operational occurrence |
LR-N03-0142, Request for Change to Technical Specifications Pressure Sensor Response Time Testing, Salem Station | 11 April 2003 | Request for Change to Technical Specifications Pressure Sensor Response Time Testing, Salem Station | |
LR-N04-0021, Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report | 26 April 2004 | Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report | Packing leak Probabilistic Risk Assessment Deep Dose Equivalent Fuel cladding Power Uprate |
LR-N04-0238, Request for Change to Technical Specifications, to Modify Definition of Operable | 23 July 2004 | Request for Change to Technical Specifications, to Modify Definition of Operable | Shutdown Margin Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Pressure Boundary Leakage Offsite Circuit |
LR-N04-0311, Request for Change to Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | 4 March 2005 | Request for Change to Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | Probabilistic Risk Assessment Incorporated by reference |
LR-N04-0343, Revised Request for Changes to Technical Specifications Containment Systems - Containment Cooling System | 11 August 2004 | Revised Request for Changes to Technical Specifications Containment Systems - Containment Cooling System | |
LR-N04-0345, Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | 27 September 2004 | Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | Incorporated by reference Large early release frequency |
LR-N04-0466, Request for Change to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process | 11 January 2005 | Request for Change to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process | Incorporated by reference Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
LR-N05-0018, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational. | 23 February 2005 | Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational. | Safe Shutdown Offsite Dose Calculation Manual Hydrostatic Operating Basis Earthquake Nondestructive Examination Annual Radioactive Effluent Release Report Process Control Program Earthquake Pressure Boundary Leakage Fire Protection Program |
LR-N05-0036, Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume | 15 February 2005 | Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume | |
LR-N05-0094, Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation | 4 March 2005 | Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation | Safe Shutdown Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Excess Flow Check Valve Safeguards Contingency Plan Pressure Boundary Leakage Recently irradiated fuel Fire Protection Program Siren Affidavit |
LR-N05-0319, Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels | 22 July 2005 | Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels | |
LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report | 19 August 2005 | Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report | Shutdown Margin Packing leak |
LR-N05-0386, Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | 2 August 2005 | Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process | |
LR-N05-0392, Request for Change to Technical Specifications Accident Monitoring Instrumentation | 31 August 2005 | Request for Change to Technical Specifications Accident Monitoring Instrumentation | Shutdown Margin Reactor Vessel Water Level Post Accident Monitoring |
LR-N06-0051, Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety Valves | 6 April 2006 | Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety Valves | Anticipated operational occurrence Fuel cladding |
LR-N06-0055, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requiremen | 6 April 2006 | Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requirements | Safe Shutdown Offsite Dose Calculation Manual Hydrostatic Nondestructive Examination Annual Radioactive Effluent Release Report Process Control Program Earthquake Pressure Boundary Leakage Fire Protection Program |
LR-N06-0201, Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process | 7 June 2006 | Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process | Incorporated by reference |
LR-N06-0233, Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation Valves | 4 August 2006 | Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation Valves | High Radiation Area |
LR-N06-0309, Request for Changes to Technical Specifications Refueling Operations - Decay Time | 4 August 2006 | Request for Changes to Technical Specifications Refueling Operations - Decay Time | Ultimate heat sink |
LR-N07-0005, One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) | 18 January 2007 | One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) | Anticipated operational occurrence Safe Shutdown Earthquake Nondestructive Examination |
LR-N07-0030, License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System | 16 March 2007 | License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System | Ultimate heat sink Stroke time Coast down |
LR-N07-0058, Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | 15 April 2007 | Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | Safe Shutdown Incorporated by reference |
LR-N07-0156, License Amendment Request LAR S07-05, Revision to Licensing Basis - NPSH Methodology for ECCS Pumps | 15 August 2007 | License Amendment Request LAR S07-05, Revision to Licensing Basis - NPSH Methodology for ECCS Pumps | |
LR-N08-0046, Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-01 | 11 March 2008 | Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-01 | Shutdown Margin Ultimate heat sink Probabilistic Risk Assessment Design basis earthquake |
LR-N08-0054, License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations | 5 March 2008 | License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations | |
LR-N08-0132, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. | 21 July 2008 | License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours. | Fitness for Duty |
LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications | 5 January 2009 | License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications | Safe Shutdown Incorporated by reference Process Control Program Safeguards Contingency Plan EVT-1 Fire Protection Program Power Uprate |
LR-N09-0034, License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications | 9 April 2009 | License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications | Unanalyzed Condition Shutdown Margin Probabilistic Risk Assessment Control of Heavy Loads |
LR-N09-0042, License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies | 22 March 2009 | License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies | Boric Acid Shutdown Margin Packing leak Anticipated operational occurrence Power change Flow Induced Vibration |
LR-N09-0164, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items | 14 September 2009 | License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items | Safe Shutdown Shutdown Margin Fire Protection Program |
LR-N09-0214, Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval | 21 September 2009 | Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval | Safe Shutdown High winds Mission time Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency |
LR-N09-0218, Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components | 23 September 2009 | Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components | Time of Discovery Shutdown Margin Offsite Dose Calculation Manual Incorporated by reference Process Control Program Grace period |
LR-N10-0032, Request Amendment of Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements | 25 March 2010 | Request Amendment of Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements | Hydrostatic |
LR-N10-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 23 March 2010 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | Boric Acid High winds Shutdown Margin High Radiation Area Mission time Grab sample Hydrostatic Probabilistic Risk Assessment Incorporated by reference Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement | 29 March 2010 | License Amendment Request - One Time On-Line Safety-Related Battery Replacement | Safe Shutdown Tornado Missile Turbine Missile GOTHIC |
LR-N10-0118, Corrections to the License Renewal Application Environmental Report | 6 April 2010 | Corrections to the License Renewal Application Environmental Report | NJPDES |
LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements | 4 October 2010 | License Amendment Request: Changes to Snubber Surveillance Requirements | Incorporated by reference |
LR-N12-0108, Unit 1 - License Amendment Request: Revision to Technical Specification (TS) 6.8.4.i, Steam Generator (SG) Program, and TS 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criteria | 8 May 2012 | Unit 1 - License Amendment Request: Revision to Technical Specification (TS) 6.8.4.i, Steam Generator (SG) Program, and TS 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criteria | Pressure Boundary Leakage Coast down |
LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System | 17 July 2012 | License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System | Fuel cladding |
LR-N12-0200, for License Amendment Request - Cyber Security Plan Implementation Schedule Milestones | 26 July 2012 | for License Amendment Request - Cyber Security Plan Implementation Schedule Milestones | Cyber Security |
LR-N12-0289, License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor Indications | 30 November 2012 | License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor Indications | Grab sample Fuel cladding |
LR-N13-0265, License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule | 24 December 2013 | License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule | Cyber Security |
LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | 24 March 2014 | License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor | Surveillance Frequency Control Program |