Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
LR-N02-0027, PSEG Nuclear, Llc., Application for Amendment to Licenses DPR-70 to Change TS Missed Surveillance Requirements (T.S. 4.0.3) & Adoption of TS Bases Control Program25 July 2002PSEG Nuclear, Llc., Application for Amendment to Licenses DPR-70 to Change TS Missed Surveillance Requirements (T.S. 4.0.3) & Adoption of TS Bases Control ProgramTime of Discovery
Offsite Dose Calculation Manual
Incorporated by reference
Missed surveillance
Annual Radioactive Effluent Release Report
Maintenance Rule Program
LR-N02-0106, Request for Change to Technical Specifications Requirements, Supplemental Request One-Time Extension to Increase the Interval of the Integrated Leak Rate Test from Ten to Fifteen Years22 March 2002Request for Change to Technical Specifications Requirements, Supplemental Request One-Time Extension to Increase the Interval of the Integrated Leak Rate Test from Ten to Fifteen YearsProbabilistic Risk Assessment
LR-N02-0244, Request for Changes to Technical Specifications Refueling Operations - Relaxation of Requirements Applicable During Movement of Irradiated Fuel29 July 2002Request for Changes to Technical Specifications Refueling Operations - Relaxation of Requirements Applicable During Movement of Irradiated FuelControl of Heavy Loads
LR-N02-0315, Request for Change to Technical Specifications to Reflect New Setpoints and Allowable Values for Steam Generator Low-Low Level Trip26 September 2002Request for Change to Technical Specifications to Reflect New Setpoints and Allowable Values for Steam Generator Low-Low Level Trip
LR-N02-0344, Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area.23 October 2002Request for Change to Technical Specifications Revise Section 6.12, High Radiation Area.High Radiation Area
Offsite Dose Calculation Manual
Process Control Program
LR-N03-0022, Revision to Request for Change to Technical Specifications14 February 2003Revision to Request for Change to Technical SpecificationsBoric Acid
Shutdown Margin
LR-N03-0092, Request for Change to TSs Explosive Gas Mixture6 June 2003Request for Change to TSs Explosive Gas MixtureAnticipated operational occurrence
LR-N03-0142, Request for Change to Technical Specifications Pressure Sensor Response Time Testing, Salem Station11 April 2003Request for Change to Technical Specifications Pressure Sensor Response Time Testing, Salem Station
LR-N04-0021, Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis Report26 April 2004Units I and 2 - Implementation of Alternative Source Term (AST) Request for Changes to Technical Specifications and Updated Final Safety Analysis ReportPacking leak
Probabilistic Risk Assessment
Deep Dose Equivalent
Fuel cladding
Power Uprate
LR-N04-0238, Request for Change to Technical Specifications, to Modify Definition of Operable23 July 2004Request for Change to Technical Specifications, to Modify Definition of OperableShutdown Margin
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Pressure Boundary Leakage
Offsite Circuit
LR-N04-0311, Request for Change to Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process4 March 2005Request for Change to Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement ProcessProbabilistic Risk Assessment
Incorporated by reference
LR-N04-0343, Revised Request for Changes to Technical Specifications Containment Systems - Containment Cooling System11 August 2004Revised Request for Changes to Technical Specifications Containment Systems - Containment Cooling System
LR-N04-0345, Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process27 September 2004Request for Change to Technical Specifications to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement ProcessIncorporated by reference
Large early release frequency
LR-N04-0466, Request for Change to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process11 January 2005Request for Change to Technical Specifications to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement ProcessIncorporated by reference
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
LR-N05-0018, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational.23 February 2005Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program, & Steam Generator Tube Inspection Report & to Revise Reactor Coolant System Operational.Safe Shutdown
Offsite Dose Calculation Manual
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
Pressure Boundary Leakage
Fire Protection Program
LR-N05-0036, Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume15 February 2005Request for Changes to Technical Specifications Deletion of Reactor Coolant System Volume
LR-N05-0094, Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation4 March 2005Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon CorporationSafe Shutdown
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Excess Flow Check Valve
Safeguards Contingency Plan
Pressure Boundary Leakage
Recently irradiated fuel
Fire Protection Program
Siren
Affidavit
LR-N05-0319, Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels22 July 2005Technical Specification Bases Change S05-05B Re Radiation Monitoring Channels
LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report19 August 2005Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis ReportShutdown Margin
Packing leak
LR-N05-0386, Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process2 August 2005Unit 1 and Unit 2, Supplement to Request for Change to Technical Specification to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process
LR-N05-0392, Request for Change to Technical Specifications Accident Monitoring Instrumentation31 August 2005Request for Change to Technical Specifications Accident Monitoring InstrumentationShutdown Margin
Reactor Vessel Water Level
Post Accident Monitoring
LR-N06-0051, Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety Valves6 April 2006Request for Amendment to Technical Specifications Maximum Allowable Power with Inoperable Steam Line Safety ValvesAnticipated operational occurrence
Fuel cladding
LR-N06-0055, Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage Requiremen6 April 2006Request for Change to Technical Specifications to Add Requirements for Steam Generator Tube Integrity, Steam Generator Program and Steam Generator Tube Inspection Report and to Revise Reactor Coolant System Operational Leakage RequirementsSafe Shutdown
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
Pressure Boundary Leakage
Fire Protection Program
LR-N06-0201, Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process7 June 2006Request for Change to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement ProcessIncorporated by reference
LR-N06-0233, Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation Valves4 August 2006Request for Change to Technical Specifications Containment Ventilation System, Containment Isolation ValvesHigh Radiation Area
LR-N06-0309, Request for Changes to Technical Specifications Refueling Operations - Decay Time4 August 2006Request for Changes to Technical Specifications Refueling Operations - Decay TimeUltimate heat sink
LR-N07-0005, One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance)18 January 2007One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance)Anticipated operational occurrence
Safe Shutdown Earthquake
Nondestructive Examination
LR-N07-0030, License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System16 March 2007License Change Request S06-010, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling SystemUltimate heat sink
Stroke time
Coast down
LR-N07-0058, Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process15 April 2007Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Incorporated by reference
LR-N07-0156, License Amendment Request LAR S07-05, Revision to Licensing Basis - NPSH Methodology for ECCS Pumps15 August 2007License Amendment Request LAR S07-05, Revision to Licensing Basis - NPSH Methodology for ECCS Pumps
LR-N08-0046, Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-0111 March 2008Request for Changes to Technical Specifications Refueling Operations - Decay Time, License Amendment Request (LAR) S08-01Shutdown Margin
Ultimate heat sink
Probabilistic Risk Assessment
Design basis earthquake
LR-N08-0054, License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations5 March 2008License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations
LR-N08-0132, License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.21 July 2008License Amendment Request to Remove References to NRC Generic Letter 82-12, Nuclear Power Plant Staff Working Hours.Fitness for Duty
LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications5 January 2009License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical SpecificationsSafe Shutdown
Incorporated by reference
Process Control Program
Safeguards Contingency Plan
EVT-1
Fire Protection Program
Power Uprate
LR-N09-0034, License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical Specifications9 April 2009License Amendment Request to Relocate Communications, Manipulator Crane, and Crane Travel Requirements from Technical SpecificationsUnanalyzed Condition
Shutdown Margin
Probabilistic Risk Assessment
Control of Heavy Loads
LR-N09-0042, License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies22 March 2009License Amendment Request to Revise the Definition of Fully Withdrawn for the Rod Cluster Control AssembliesBoric Acid
Shutdown Margin
Packing leak
Anticipated operational occurrence
Power change
Flow Induced Vibration
LR-N09-0164, License Amendment Request to Correct Technical Specification and Facility Operating License Editorial Items14 September 2009License Amendment Request to Correct Technical Specification and Facility Operating License Editorial ItemsSafe Shutdown
Shutdown Margin
Fire Protection Program
LR-N09-0214, Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval21 September 2009Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test IntervalSafe Shutdown
High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
LR-N09-0218, Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components23 September 2009Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code ComponentsTime of Discovery
Shutdown Margin
Offsite Dose Calculation Manual
Incorporated by reference
Process Control Program
Grace period
LR-N10-0032, Request Amendment of Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements25 March 2010Request Amendment of Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity RequirementsHydrostatic
LR-N10-0088, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program23 March 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled ProgramBoric Acid
High winds
Shutdown Margin
High Radiation Area
Mission time
Grab sample
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement29 March 2010License Amendment Request - One Time On-Line Safety-Related Battery ReplacementSafe Shutdown
Tornado Missile
Turbine Missile
GOTHIC
LR-N10-0118, Corrections to the License Renewal Application Environmental Report6 April 2010Corrections to the License Renewal Application Environmental ReportNJPDES
LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements4 October 2010License Amendment Request: Changes to Snubber Surveillance RequirementsIncorporated by reference
LR-N12-0108, Unit 1 - License Amendment Request: Revision to Technical Specification (TS) 6.8.4.i, Steam Generator (SG) Program, and TS 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criteria8 May 2012Unit 1 - License Amendment Request: Revision to Technical Specification (TS) 6.8.4.i, Steam Generator (SG) Program, and TS 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair CriteriaPressure Boundary Leakage
Coast down
LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System17 July 2012License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning SystemFuel cladding
LR-N12-0200, for License Amendment Request - Cyber Security Plan Implementation Schedule Milestones26 July 2012for License Amendment Request - Cyber Security Plan Implementation Schedule MilestonesCyber Security
LR-N12-0289, License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor Indications30 November 2012License Amendment Request: Change to PSEG Nuclear LLC, Emergency Plan to Remove the Salem Backup R45 Plant Vent Radiation Monitor IndicationsGrab sample
Fuel cladding
LR-N13-0265, License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation Schedule24 December 2013License Amendment Request for Approval of the Revised PSEG Nuclear Cyber Security Plan Milestone 8 Implementation ScheduleCyber Security
LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor24 March 2014License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel FactorSurveillance Frequency Control Program