Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CLI-88-12, Advises That Jj Macktal 881215 Motion for Limited Intervention & 881230 Motion for Reconsideration of CLI-88-12 May Be Dispositioned by Commission or Referred to Aslb.W/Certificate of Svc.Served on 89031515 March 1989Advises That Jj Macktal 881215 Motion for Limited Intervention & 881230 Motion for Reconsideration of CLI-88-12 May Be Dispositioned by Commission or Referred to Aslb.W/Certificate of Svc.Served on 890315
IA-84-940, Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility11 December 1984Notification of 841218 Meeting W/Hydrogen Control Owners Group in Norwood,Ma,To Review & Inspect Installation of Test Equipment in 1/4 Scale Test Facility
IA-84-942, Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl19 November 1984Forwards Rev to Proposed Draft Order in SECY-84-393A Based Upon Commissioner Comments.Additions to Draft Order Underlined,Deletions Lined Out.W/O Encl
IA-85-153, Forwards Schedule of Contention 5 Panel Activities & Blank Deficiency Data Sheet (Dds).Preparation & Submittal of Dds for Review Areas Prior to Panel Discussions or During Briefing by Panel Members Requested2 June 1986Forwards Schedule of Contention 5 Panel Activities & Blank Deficiency Data Sheet (Dds).Preparation & Submittal of Dds for Review Areas Prior to Panel Discussions or During Briefing by Panel Members RequestedCoatings
IA-85-261, Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility3 March 1978Documents That Appropriate Corrective Actions Taken by Dow Chemical Co in Response to 780113 Immediate Action Ltr,Per 780207 Enforcement Conference at Facility
IA-85-362, Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions21 February 1985Submits Board Questions Re Identification of Alternate User for Site.Board Will Reschedule Conference Call or Establish New Procedure for Response to Questions
IA-85-452, Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance9 July 1984Forwards Region III 840611 Proposed Enforcement Guidance for QA Program Violations Based on Experiences at Braidwood & Fermi Plants,For Review & Comment.Response Requested by 840720.W/o Enforcement Guidance
IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities31 December 1980Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for FacilitiesBoric Acid
Systematic Assessment of Licensee Performance
IA-85-562, Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted20 February 1985Responds to 850129 Request to Review Pending OL Cases to Determine Impact by Impending Mandate in Ucs Vs NRC Re Exclusion of Results of Emergency Preparedness Exercises from Hearings.Seabrook & Shoreham Will Be Impacted
IA-85-563, Forwards Listed Info Re Consideration of Earthquakes in Emergency Planning2 May 1985Forwards Listed Info Re Consideration of Earthquakes in Emergency PlanningSafe Shutdown Earthquake
Earthquake
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl26 April 1982Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl
IA-85-614, Forwards Applicant Motion for Reconsideration of ASLB 841218 Order Re Matl False Statements on Torquing of U-bolts.W/o Encl8 January 1984Forwards Applicant Motion for Reconsideration of ASLB 841218 Order Re Matl False Statements on Torquing of U-bolts.W/o Encl
IA-85-665, Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active Zones25 February 1964Discusses Seismic Design of Nuclear Power Plants,Including Const of Nuclear Plants in Seismically Active ZonesEarthquake
IA-85-668, Partially Withheld Notice of Board Meeting 85-1012 April 1985Partially Withheld Notice of Board Meeting 85-10
IA-86-133, Forwards Ofc of Investigations (OI) Rept of Investigation Re Alleged Electrical Deficiencies at Facility,Per Chairman Palladino 820420 Request to Conduct Semiannual Audit of OI Program Development.W/O Rept23 November 1982Forwards Ofc of Investigations (OI) Rept of Investigation Re Alleged Electrical Deficiencies at Facility,Per Chairman Palladino 820420 Request to Conduct Semiannual Audit of OI Program Development.W/O Rept
IA-86-191, Forwards Ofc of Investigations Rept A4-85-020 Re Assessment of Safeteam Program,For Appropriate Action16 October 1985Forwards Ofc of Investigations Rept A4-85-020 Re Assessment of Safeteam Program,For Appropriate Action
IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V22 August 1985Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V
IA-86-272, Discusses 851113-14 Audit of Comanche Peak Response Team Const Evaluation Program in Area Re Piping & Pipe Supports. Three Unresolved Items Listed11 December 1985Discusses 851113-14 Audit of Comanche Peak Response Team Const Evaluation Program in Area Re Piping & Pipe Supports. Three Unresolved Items ListedSafe Shutdown
IA-86-280, Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments4 April 1985Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments
IA-86-378, Informs of J Beck 841031 Telcon Re Investigation by Texas Utils Generating Co (Tugco) of Potential Misbehavior of Tugco Vendor Audit Group.Ofc of Investigations Will Followup on Matter26 November 1984Informs of J Beck 841031 Telcon Re Investigation by Texas Utils Generating Co (Tugco) of Potential Misbehavior of Tugco Vendor Audit Group.Ofc of Investigations Will Followup on Matter
IA-86-453, Declines to Comment on Encl Util Appeal of Enforcement Action EA-86-63 Re Imposition of Three $40,000 Civil Penalties for Violation of 10CFR50 App B,Criterion 1.Persons W/Legal Training Should Perform Investigation.W/O Encl18 June 1986Declines to Comment on Encl Util Appeal of Enforcement Action EA-86-63 Re Imposition of Three $40,000 Civil Penalties for Violation of 10CFR50 App B,Criterion 1.Persons W/Legal Training Should Perform Investigation.W/O Encl
IA-86-454, Submits Update of 860408 Schedule for Remaining Work Needed on Sser 13 for Comanche Peak Program Plan.Related Info Encl9 April 1986Submits Update of 860408 Schedule for Remaining Work Needed on Sser 13 for Comanche Peak Program Plan.Related Info Encl
IA-86-656, Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested8 March 1982Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Lube Oil Cooler.Followup on Generic Aspects of Problem Requested
IA-86-657, Advises of Meetings Scheduled for 850701,10,17 & 31 in Bethesda,Md to Discuss Util Program Plan.Nrc Response Will Be Sent to Util by 85080727 June 1985Advises of Meetings Scheduled for 850701,10,17 & 31 in Bethesda,Md to Discuss Util Program Plan.Nrc Response Will Be Sent to Util by 850807
IA-86-793, Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets22 September 1986Forwards Ofc of Investigations Rept of Inquiry Q2-85-021 Re Alleged Falsification of Preservice Piping Insp Records by Contractor.W/Nuclear Energy Svcs,Inc Calibr Data Sheets
IA-87-111, Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public Safety19 October 1972Submits Rept on Plant,As Discussed in ACRS 150th Meeting on 721012-14.Listed Items Can Be Resolved During Const & Facility Can Be Constructed W/Reasonable Assurance for Operation W/O Undue Risk to Public SafetySafe Shutdown
IA-87-121, Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code24 June 1982Discusses Inservice Test Programs Re Full Stroke Exercising of Normally Closed Swing or Tilting Disk Check Valves Per 10CFR50.55a & Section XI of ASME Code
IA-87-227, Forwards Summary of OL Review Costs by Program Ofc for 841223-850622.Actual Cost Exceeds 10CFR170 Limits18 April 1986Forwards Summary of OL Review Costs by Program Ofc for 841223-850622.Actual Cost Exceeds 10CFR170 Limits
IA-87-244, Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by Utils14 July 1983Requests Concurrence W/Interpretation of Requirements for Compliance W/Gdc 2 & 4 Protection of safety-related Structures,Sys & Components from Internal Flooding & Internal Missiles.Interpretation Challenged by UtilsInternal Flooding
Backfit
IA-87-413, Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit Interviews24 February 1987Outlines Plan for Review & Evaluation of Issue Specfic Action Plan Results Rept Isap VII.a.6 (Rev 1), Exit InterviewsHigh Radiation Area
IA-87-428, Proposes to Postpone Scheduled Insp of Plant Based on Listed Technical & Personal Reasons.Author Will Conduct Procedure 35200 After FSAR Amended to Cover Organizational Changes & in Unscheduled Bits & Pieces30 June 1978Proposes to Postpone Scheduled Insp of Plant Based on Listed Technical & Personal Reasons.Author Will Conduct Procedure 35200 After FSAR Amended to Cover Organizational Changes & in Unscheduled Bits & Pieces
IA-87-449, Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il10 July 1987Submits Daily Staff Notes for 870709.Licensee Presented Results of Investigations & Proposed Corrective Action Re 870626 Unplanned Heatup Event Resulting in Operating Mode Change from Cold to Hot Shutdown on 870707 in Chicago,Il
IA-87-535, Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct23 January 1986Forwards Ofc of Inspector & Auditor Rept Documenting Investigation of Alleged Misconduct by Two NRC Employees. Investigation Did Not Identify Any Misconduct
IA-87-557, Forwards List of Major Accomplishments by Site Ofc of Special Projects Staff for Jul 19877 August 1987Forwards List of Major Accomplishments by Site Ofc of Special Projects Staff for Jul 1987
IA-87-558, Informs of Establishment of Allegation Review Committee Charged W/Reviewing All New Allegations & Setting Forth Course of Action for Evaluation,Followup & Final Disposition15 June 1987Informs of Establishment of Allegation Review Committee Charged W/Reviewing All New Allegations & Setting Forth Course of Action for Evaluation,Followup & Final Disposition
IA-87-562, Concurs w/870120 Proposal to Establish Ofc of Special Projects W/Authority & Responsiblity for Licensing & Insp for Comanche Peak & TVA Projects.Commissioners Roberts & Bernthal Believe Subj Ofc Existence Should Be Limited6 February 1987Concurs w/870120 Proposal to Establish Ofc of Special Projects W/Authority & Responsiblity for Licensing & Insp for Comanche Peak & TVA Projects.Commissioners Roberts & Bernthal Believe Subj Ofc Existence Should Be Limited
IA-87-596, Discusses Actions Planned Re Rept of Comanche Peak Rept Review Group.Review Will Be Used to Establish Actions Which Will Improve Region IV Operations26 August 1987Discusses Actions Planned Re Rept of Comanche Peak Rept Review Group.Review Will Be Used to Establish Actions Which Will Improve Region IV Operations
IA-87-677, Forwards Complete Ofc of Inspector & Auditor Rept on Region IV Mgt Actions Re Facility.W/O Encl9 December 1986Forwards Complete Ofc of Inspector & Auditor Rept on Region IV Mgt Actions Re Facility.W/O Encl
IA-87-830, Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o Encl19 November 1986Forwards Assessment of Radiologicals Controls Program at Facility for Period from 860501-1031.W/o EnclSystematic Assessment of Licensee Performance
IA-88-129, Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR21 March 1988Forwards Advanced Copy of SECY-88-82 - Updated Staff Action for TVA Sequoyah Unit 2 Restart. Document Available in PDR
IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl9 March 1988Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted MatlStroke time
IA-88-322, Submits Input to Plan for Implementing Recommendations from Facility Rept Review Group Project Rept.Definitive & Documented Regulatory Position Does Not Exist on Controls During Transfer Between Organizations Re Shipping Records14 January 1988Submits Input to Plan for Implementing Recommendations from Facility Rept Review Group Project Rept.Definitive & Documented Regulatory Position Does Not Exist on Controls During Transfer Between Organizations Re Shipping Records
IA-88-356, Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl4 May 1987Forwards SER Supporting Util 870311 & 0407 Requests for Proposed Mods to MSIV Actuation Control Sys.Mods Comply W/ 10CFR50.55a(h) & GDC 21.SALP Input Also Encl
IA-88-444, Informs That D Jew Authorized to & Worked on 880716.Time Sheets Encl3 August 1988Informs That D Jew Authorized to & Worked on 880716.Time Sheets Encl
IA-88-472, Informs of Closure to Allegation Because Person Calling in Allegation Did Not Expect to Receive Response & Did Not Leave Address1 September 1988Informs of Closure to Allegation Because Person Calling in Allegation Did Not Expect to Receive Response & Did Not Leave AddressSafe Shutdown
Boric Acid
Coatings
Nondestructive Examination
Condition Adverse to Quality
Earthquake
Backfit
IA-88-497, Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl24 June 1988Forwards Safety Evaluation Accepting Proposed Reracking of Spent Fuel Storage Pools from Criticality Standpoint.Fuel Enrichment May Be in Conflict W/Table 54 of 10CFR51 & Data Used by Util to Assess Environ Effects.Salp Input Also Encl
IA-89-226, Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 251416 September 1987Forwards Info Re Preparedness for Full Power License, Including Open Items Including Allegations & License Conditions,Preoperational & Acceptance Testing Status,Const Status & Status of Insps Required by MC-2512,2513 & 2514
IA-96-492, Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants25 November 1996Forwards Proposed Notice of Violation & Proposed Imposition of Civil Penalities Based on Six Violations of Security Program at Mentioned Plants
IR 05000117/200401525 July 1985Updates Operating Experience for Plant for 850415-0715. Review Updates Encl 850129 & 0426 Reviews for 841026-850117 & 850117-0415,respectively
IR 05000275/198400721 June 1984Forwards Special Insp Rept 50-275/84-07 Re Performance of Plant Operating Crews,Conducted by Region V,Lll & Eg&G Idaho,Inc.Performance Above Average Compared to Similar Licensed Facilities