Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000344/LER-1979-013, Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl18 January 1980Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl
05000344/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl22 June 1982Forwards LER 82-008/03L-0.Detailed Event Analysis Encl
05000344/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl28 June 1982Forwards LER 82-009/03L-0.Detailed Event Analysis Encl
05000344/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy8 July 1982Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy
05000344/LER-1982-011, Forwards LER 82-011/03T-0.Detailed Event Analysis Encl26 July 1982Forwards LER 82-011/03T-0.Detailed Event Analysis Encl
05000344/LER-1985-013, Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER24 July 1986Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER
05000344/LER-1986-003, Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-3211 September 1986Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32Safe Shutdown
05000344/LER-1987-014, Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 87110128 August 1987Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101
05000344/LER-1988-019, Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement21 April 1989Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement
05000344/LER-1988-025, Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C0117 February 1989Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01
05000344/LER-1988-046, Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 89031528 February 1989Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315
05000344/LER-1988-049, Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-04914 April 1989Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049
05000344/LER-1989-007, Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties28 September 1989Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties
05000344/LER-1989-012, Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 8908098 September 1989Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809
05000344/LER-1990-015, Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations15 October 1990Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations
05000344/LER-1992-010, Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-1025 January 1993Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10
05000344/LER-1992-026, Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance28 December 1992Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration SurveillanceSafe Shutdown
Fire Barrier
Exemption Request
Continuous fire watch
IR 05000344/199020030 January 1992Revises Commitment Date to Resolve Svc Water Sys Water Hammer Concern,Identified in Edsfi Rept 50-344/90-200 from 920131 to 0430
ML17249A96418 October 1979Notifies of State Senate Bill 641 Requiring State Dept of Energy to Maintain Inspector at Nuclear Plant on 40-h/wk Basis.Requests NRC Comments on Training,Duties & Responsibilities & Working Relationship W/Nrc Inspector
ML17311A10430 October 1989Advises That Commitment Date for Performance of Surveillance Moved to 891130 to Allow for Incorporation in Biennial Audit Per Rev 1 to LER 89-08.NRC Resident Inspector Informed of Change on 891013
ML18036A97930 January 1992Revises Commitment Date to Resolve Svc Water Sys Water Hammer Concern,Identified in Edsfi Rept 50-344/90-200 from 920131 to 0430
ML18082A49212 May 1980Forwards Schedule for Evaluation of Westinghouse Steam Generator Row One U Bends.Requests Delay of NRC Issuance of Generic Ltrs to near-term OL Plants Requiring Plugging of Row One Tubes,In Confirmation of 800415 MeetingNondestructive Examination
ML20054F38311 June 1982Forwards Addl Info Re Implementation Schedules for NUREG-0737 Items,In Response to Generic Ltr 82-10.Items Include I.A.1.3.1,I.A.1.3.2,I.C.1,II.D.1.2,II.D.1.3, II.K.3.30,II.K.3.31,III.A.1.2,III.A.2.2 & III.D.3.4
ML20054G48214 June 1982Submits Supplemental Check for Class III License Fee for Amend 72 to License NPF-1,in Response to NRC
ML20054G8708 June 1982Responds to NRC Re Violations Noted in IE Insp Rept 50-344/82-10.Corrective Actions:Statement Prohibiting Use of Fire Hoses for Nonemergency Purposes Added to Procedure PS-3-21.Fire Brigade Training Will Be Conducted
ML20054H13715 June 1982Forwards Endorsement 47 to Maelu Policy MF-86 & Endorsement 55 to Nelia Policy NF-225
ML20054H76318 June 1982Forwards Westinghouse Evaluation of Use of Fuel Assemblies Containing Stainless Steel Fuel Rod Replacements.Stainless Steel Rods Will Not Have Significant Impact on Cycle 5 Core. Prompt Approval of License Change Application 88 Requested
ML20054H90917 June 1982Forwards Revision 2 to Security Force Training & Qualification Plan.Revision Withheld (Ref 10CFR2.790)
ML20054J53822 June 1982Forwards Revision to Design Info Questionnaires Re Fuel Pin Exchange Process Conducted at Facility
ML20054J65924 June 1982Forwards Final Response to 810508 Request for Addl Info Re Evaluation Criteria for Masonry Walls.Items 6-10 Addressed
ML20054M13010 June 1982Forwards Monthly Operating Rept for May 1982
ML20055A1419 July 1982Forwards Monthly Operating Rept for June 1982
ML20055A3441 July 1982Forwards Conservative Calculation of Enthalpy Rise Factor W/Power Level & Tech Specs Limits
ML20055A3466 July 1982Forwards FEMA Region X Evaluation of Potential Effects Upon Response Capabilities W/Respect to Volcanic Activity Such as Ashfall Mudflow,Floods,Landslides,Earthquakes & Future EruptionsEarthquake
ML20055B27325 June 1982Forwards Public Version or Revision 3 to Radiological Emergency Response Plan Implementing Procedure EP-18, Fire Fighting. Receipt Form Encl
ML20055B7702 July 1982Forwards Response to 820602 Notice of Violation & Proposed Imposition of Civil Penalties.Cause of Failure Not Design Deficiency But Analytical Error Leading to Incorrect Training Info Bulletin.Revised Standing Order Issued
ML20055C1343 August 1982Advises That Main Steam Line Radiation & Containment Hydrogen Monitors Will Be Operational by 821001,per NUREG-0737 Items II.F.1.1 & II.F.1.6
ML20055C26920 February 1990Responds to NRC Re Violations Noted in Insp Rept 50-344/89-30.Corrective Actions:Administrative Order 5-8 Temporary Mods to Be Evaluated for Need to Improve Control Over Temporary Mods Issued for Both Trains of Sys
ML20055D04129 June 1990Discusses Design Verification Program Re Main Steam Support Structure.Extension of Completion Date for Project Justified Since Documentation,Not Mod of Main Steam Support Structure Is Reason for Delay
ML20055D04429 June 1990Advises That Response to Generic Ltr 90-04 Re Status of Generic Safety Issues at Facility Delayed from 900629 to 900713
ML20055D70926 June 1990Forwards Steam Generator Tube Plugging Rept,Per Inservice Insp
ML20055E0246 July 1990Responds to NRC Re Violations Noted in Insp Rept 50-344/90-11.Corrective Actions:Generic Issues That Contributed to Violation Will Be Discussed During Mgt Meetings & Quality Insp Supervisor Counseled
ML20055E0286 July 1990Informs That Actions Committed to in Util Re Replacement of Breaker During 1990 Refueling Outage & Provision of Rept Documenting Replacement of Breaker, Complete,Per NRC Bulletin 88-010
ML20055E1756 July 1990Provides Update to 891130 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Rev to Maint Procedure 12-4, Valve Air Actuators, to Include Maint Insp Completed in Apr 1990
ML20055E3406 July 1990Forwards Application for Renewal of Plant NPDES Permit
ML20055F24412 July 1990Forwards Response to SALP Evaluation for Jan 1989 - Mar 1990 Re Maint/Surveillance.Util Plans to Improve Performance in Areas of Operation Through Commitment of Support from Nuclear Div Mgt & Personal Involvement of Corporate Mgt
ML20055F2966 July 1990Forwards Addl Info Re ATWS Mitigating Sys Actuation Circuitry
ML20055F69113 July 1990Responds to Generic Ltr 90-04, Request for Info on Status of Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions