Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000344/LER-1979-013, Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl | 18 January 1980 | Forwards Confirmatory Info to NRC 791229 Question 1 Re LER 79-13 Concerning Stresses in Walls Due to Thermal Gradients. Masonry Walls Subj to Thermal Gradient Across Thickness Will Undergo Deformation.Certificate of Svc Encl | |
05000344/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | 22 June 1982 | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | |
05000344/LER-1982-009, Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | 28 June 1982 | Forwards LER 82-009/03L-0.Detailed Event Analysis Encl | |
05000344/LER-1982-010, Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy | 8 July 1982 | Forwards LER 82-010/03L-0.Detailed Event Analysis Encl. Corrected Copy | |
05000344/LER-1982-011, Forwards LER 82-011/03T-0.Detailed Event Analysis Encl | 26 July 1982 | Forwards LER 82-011/03T-0.Detailed Event Analysis Encl | |
05000344/LER-1985-013, Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER | 24 July 1986 | Forwards Comments on 860627 Draft Info Notice Re Steam Generator Hydraulic Snubber Failures,Based Primarily on LER 85-13 & Suppl 1 to LER | |
05000344/LER-1986-003, Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32 | 11 September 1986 | Forwards Clarification of Util Position Re 10CFR50.49 Compliance for 11 ECCS Valves Discussed in Rev 1 to LER 86-003,per 860905 Enforcement Conference & Concerns Raised in Insp Rept 50-344/86-32 | Safe Shutdown |
05000344/LER-1987-014, Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101 | 28 August 1987 | Advises That Results of Exam to Determine Exact Cause of Corrosion on Internal Surfaces of Both Centrifugal Charging Pumps Discussed in LER 87-014 Will Be Reported in Rev to LER 87-014 by 871101 | |
05000344/LER-1988-019, Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement | 21 April 1989 | Discusses Issues Discussed in Rev 2 to LER 88-019 Re Containment Hydrogen Vent Sys Absorber Replacement | |
05000344/LER-1988-025, Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01 | 17 February 1989 | Forwards LER 88-25 Re Event Where Archaeological Significant Area Inadvertently Disturbed by Const Excavation Activities & Portland State Univ Rept, Archaeological Evaluation of Trojan Locality 35C01 | |
05000344/LER-1988-046, Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315 | 28 February 1989 | Informs That Supplemental Rept to LER 88-46 Will Not Be Ready for Submittal Until 890315 | |
05000344/LER-1988-049, Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049 | 14 April 1989 | Responds to NRC Re Violations Noted in Insp Rept 50-344/89-01.Corrective Actions:Temporary Change to Plant Operation Test Procedure 26-2 Implemented Which Appropriately Revised Procedure as Described in LER 88-049 | |
05000344/LER-1989-007, Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties | 28 September 1989 | Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties | |
05000344/LER-1989-012, Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809 | 8 September 1989 | Advises That Rev 1 to LER 89-012 Will Be Submitted by 890920 Due to Extension of 1989 Refueling Outage & Plant Trip of 890809 | |
05000344/LER-1990-015, Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations | 15 October 1990 | Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations | |
05000344/LER-1992-010, Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10 | 25 January 1993 | Suppls 900706 Response to GL 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Failure Position of All safety-related Active Valves Tested for in IST Program.Design Defect Reported in LER 92-10 | |
05000344/LER-1992-026, Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance | 28 December 1992 | Forwards LER 92-26,rev 4 & Discusses Addl Degraded Three Hour Fire Barriers & Barrier Penetrations Discovered During 1992 Eighteen Month Fire Barrier Peneratration Surveillance | Safe Shutdown Fire Barrier Exemption Request Continuous fire watch |
IR 05000344/1990200 | 30 January 1992 | Revises Commitment Date to Resolve Svc Water Sys Water Hammer Concern,Identified in Edsfi Rept 50-344/90-200 from 920131 to 0430 | |
ML17249A964 | 18 October 1979 | Notifies of State Senate Bill 641 Requiring State Dept of Energy to Maintain Inspector at Nuclear Plant on 40-h/wk Basis.Requests NRC Comments on Training,Duties & Responsibilities & Working Relationship W/Nrc Inspector | |
ML17311A104 | 30 October 1989 | Advises That Commitment Date for Performance of Surveillance Moved to 891130 to Allow for Incorporation in Biennial Audit Per Rev 1 to LER 89-08.NRC Resident Inspector Informed of Change on 891013 | |
ML18036A979 | 30 January 1992 | Revises Commitment Date to Resolve Svc Water Sys Water Hammer Concern,Identified in Edsfi Rept 50-344/90-200 from 920131 to 0430 | |
ML18082A492 | 12 May 1980 | Forwards Schedule for Evaluation of Westinghouse Steam Generator Row One U Bends.Requests Delay of NRC Issuance of Generic Ltrs to near-term OL Plants Requiring Plugging of Row One Tubes,In Confirmation of 800415 Meeting | Nondestructive Examination |
ML20054F383 | 11 June 1982 | Forwards Addl Info Re Implementation Schedules for NUREG-0737 Items,In Response to Generic Ltr 82-10.Items Include I.A.1.3.1,I.A.1.3.2,I.C.1,II.D.1.2,II.D.1.3, II.K.3.30,II.K.3.31,III.A.1.2,III.A.2.2 & III.D.3.4 | |
ML20054G482 | 14 June 1982 | Submits Supplemental Check for Class III License Fee for Amend 72 to License NPF-1,in Response to NRC | |
ML20054G870 | 8 June 1982 | Responds to NRC Re Violations Noted in IE Insp Rept 50-344/82-10.Corrective Actions:Statement Prohibiting Use of Fire Hoses for Nonemergency Purposes Added to Procedure PS-3-21.Fire Brigade Training Will Be Conducted | |
ML20054H137 | 15 June 1982 | Forwards Endorsement 47 to Maelu Policy MF-86 & Endorsement 55 to Nelia Policy NF-225 | |
ML20054H763 | 18 June 1982 | Forwards Westinghouse Evaluation of Use of Fuel Assemblies Containing Stainless Steel Fuel Rod Replacements.Stainless Steel Rods Will Not Have Significant Impact on Cycle 5 Core. Prompt Approval of License Change Application 88 Requested | |
ML20054H909 | 17 June 1982 | Forwards Revision 2 to Security Force Training & Qualification Plan.Revision Withheld (Ref 10CFR2.790) | |
ML20054J538 | 22 June 1982 | Forwards Revision to Design Info Questionnaires Re Fuel Pin Exchange Process Conducted at Facility | |
ML20054J659 | 24 June 1982 | Forwards Final Response to 810508 Request for Addl Info Re Evaluation Criteria for Masonry Walls.Items 6-10 Addressed | |
ML20054M130 | 10 June 1982 | Forwards Monthly Operating Rept for May 1982 | |
ML20055A141 | 9 July 1982 | Forwards Monthly Operating Rept for June 1982 | |
ML20055A344 | 1 July 1982 | Forwards Conservative Calculation of Enthalpy Rise Factor W/Power Level & Tech Specs Limits | |
ML20055A346 | 6 July 1982 | Forwards FEMA Region X Evaluation of Potential Effects Upon Response Capabilities W/Respect to Volcanic Activity Such as Ashfall Mudflow,Floods,Landslides,Earthquakes & Future Eruptions | Earthquake |
ML20055B273 | 25 June 1982 | Forwards Public Version or Revision 3 to Radiological Emergency Response Plan Implementing Procedure EP-18, Fire Fighting. Receipt Form Encl | |
ML20055B770 | 2 July 1982 | Forwards Response to 820602 Notice of Violation & Proposed Imposition of Civil Penalties.Cause of Failure Not Design Deficiency But Analytical Error Leading to Incorrect Training Info Bulletin.Revised Standing Order Issued | |
ML20055C134 | 3 August 1982 | Advises That Main Steam Line Radiation & Containment Hydrogen Monitors Will Be Operational by 821001,per NUREG-0737 Items II.F.1.1 & II.F.1.6 | |
ML20055C269 | 20 February 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-344/89-30.Corrective Actions:Administrative Order 5-8 Temporary Mods to Be Evaluated for Need to Improve Control Over Temporary Mods Issued for Both Trains of Sys | |
ML20055D041 | 29 June 1990 | Discusses Design Verification Program Re Main Steam Support Structure.Extension of Completion Date for Project Justified Since Documentation,Not Mod of Main Steam Support Structure Is Reason for Delay | |
ML20055D044 | 29 June 1990 | Advises That Response to Generic Ltr 90-04 Re Status of Generic Safety Issues at Facility Delayed from 900629 to 900713 | |
ML20055D709 | 26 June 1990 | Forwards Steam Generator Tube Plugging Rept,Per Inservice Insp | |
ML20055E024 | 6 July 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-344/90-11.Corrective Actions:Generic Issues That Contributed to Violation Will Be Discussed During Mgt Meetings & Quality Insp Supervisor Counseled | |
ML20055E028 | 6 July 1990 | Informs That Actions Committed to in Util Re Replacement of Breaker During 1990 Refueling Outage & Provision of Rept Documenting Replacement of Breaker, Complete,Per NRC Bulletin 88-010 | |
ML20055E175 | 6 July 1990 | Provides Update to 891130 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Rev to Maint Procedure 12-4, Valve Air Actuators, to Include Maint Insp Completed in Apr 1990 | |
ML20055E340 | 6 July 1990 | Forwards Application for Renewal of Plant NPDES Permit | |
ML20055F244 | 12 July 1990 | Forwards Response to SALP Evaluation for Jan 1989 - Mar 1990 Re Maint/Surveillance.Util Plans to Improve Performance in Areas of Operation Through Commitment of Support from Nuclear Div Mgt & Personal Involvement of Corporate Mgt | |
ML20055F296 | 6 July 1990 | Forwards Addl Info Re ATWS Mitigating Sys Actuation Circuitry | |
ML20055F691 | 13 July 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions |