05000263/LER-1978-030, Forwards Revised LER 78-030/01X-1 to Correct Typographical Error in Valve Identification Number | 5 January 1979 | Forwards Revised LER 78-030/01X-1 to Correct Typographical Error in Valve Identification Number | |
05000263/LER-1979-022, Forwards LER 79-022/03L-0 | 11 January 1980 | Forwards LER 79-022/03L-0 | |
05000263/LER-1980-025, Forwards Updated LER 80-025/03L-1 | 29 June 1982 | Forwards Updated LER 80-025/03L-1 | |
05000263/LER-1981-017, Forwards Updated LER 81-017/03L-1 | 2 July 1982 | Forwards Updated LER 81-017/03L-1 | |
05000263/LER-1982-006, Forwards LER 82-006/03L-0 | 3 June 1982 | Forwards LER 82-006/03L-0 | |
05000263/LER-1982-007, Forwards LER 82-007/03L-0 | 25 August 1982 | Forwards LER 82-007/03L-0 | |
05000263/LER-1982-008, Forwards LER 82-008/03L-0 | 29 September 1982 | Forwards LER 82-008/03L-0 | |
05000263/LER-1982-016, Forwards LER 82-016/01T-0 | 12 October 1982 | Forwards LER 82-016/01T-0 | |
05000263/LER-1983-005, Forwards LER 83-005/03L-0 | 17 March 1983 | Forwards LER 83-005/03L-0 | |
05000263/LER-1983-006, Forwards LER 83-006/01T-0 | 22 April 1983 | Forwards LER 83-006/01T-0 | |
05000263/LER-1992-010, Forwards LER 92-010-01,modifying Root Cause of First Event, Based on Investigation Delineated in LER 92-012-00 | 17 November 1992 | Forwards LER 92-010-01,modifying Root Cause of First Event, Based on Investigation Delineated in LER 92-012-00 | Missed surveillance |
05000263/LER-1992-012, Forwards LER 92-012-01 Initially Re Failure to Include Manual Valves in Section XI Testing.Results of Review & Other ASME Section XI Program Discrepancies,Noted in Insp Rept 50-263/92-10 Warranted Rev to LER | 19 November 1992 | Forwards LER 92-012-01 Initially Re Failure to Include Manual Valves in Section XI Testing.Results of Review & Other ASME Section XI Program Discrepancies,Noted in Insp Rept 50-263/92-10 Warranted Rev to LER | |
05000263/LER-1993-003, Forwards Suppl 2 to LER 93-003 Re MSIVs That Exceeded TS Leakage Limit,To Reflect Results of Analysis of Sample of Film Removed from MSIV Seats Earlier This Yr | 26 October 1993 | Forwards Suppl 2 to LER 93-003 Re MSIVs That Exceeded TS Leakage Limit,To Reflect Results of Analysis of Sample of Film Removed from MSIV Seats Earlier This Yr | |
05000263/LER-1993-010, Forwards LER 93-010-00 Re Main Control Room Emergency Filtration Train Outside Design Basis Caused by in-leakage Across Inlet Dampers.Lessons Learned from Event Will Be Presented in Engineering Technical Staff Training | 23 November 1993 | Forwards LER 93-010-00 Re Main Control Room Emergency Filtration Train Outside Design Basis Caused by in-leakage Across Inlet Dampers.Lessons Learned from Event Will Be Presented in Engineering Technical Staff Training | |
05000263/LER-1994-002, Provides Suppl Rept to LER 94-002-01.Suppl Rept Corrects Error Re Labeling of Axes for Graph of Instantaneous Trip Settings Vs Actual Current to Trip | 2 August 1994 | Provides Suppl Rept to LER 94-002-01.Suppl Rept Corrects Error Re Labeling of Axes for Graph of Instantaneous Trip Settings Vs Actual Current to Trip | |
05000263/LER-1994-008, Forwards Rev 0 to Calculation CA-95-044, Estimation of Cable Spreading Room Equipment Floor Loading, in Response to 950509 Telcon Request in Support of Closure of LER 94-008 | 19 May 1995 | Forwards Rev 0 to Calculation CA-95-044, Estimation of Cable Spreading Room Equipment Floor Loading, in Response to 950509 Telcon Request in Support of Closure of LER 94-008 | |
05000263/LER-1995-007, Forwards LER 95-007-00 Re mis-positioning of Div B Drywell Spray Block Valve.Rept Contains New NRC Commitment | 13 November 1995 | Forwards LER 95-007-00 Re mis-positioning of Div B Drywell Spray Block Valve.Rept Contains New NRC Commitment | |
05000263/LER-1996-003, Forwards LER 96-003-00 Re re-analysis of High Energy Line Break,Error Found in Existing Analysis.Rept Contains Submitted New NRC Commitments | 8 May 1996 | Forwards LER 96-003-00 Re re-analysis of High Energy Line Break,Error Found in Existing Analysis.Rept Contains Submitted New NRC Commitments | |
05000263/LER-1997-004, Forwards LER 97-004-00 Re Failure to Submit Relief Requests for Limited ISI Exams.Rept Contains Two New NRC Commitments | 24 March 1997 | Forwards LER 97-004-00 Re Failure to Submit Relief Requests for Limited ISI Exams.Rept Contains Two New NRC Commitments | |
05000263/LER-1997-005, Forwards LER 97-005,which Contains One New Commitment.Diesel Fuel Surveillance Procedure Will Be Changed to Require Completion of Required Analyses Prior to Considering Surveillance Complete | 5 May 1997 | Forwards LER 97-005,which Contains One New Commitment.Diesel Fuel Surveillance Procedure Will Be Changed to Require Completion of Required Analyses Prior to Considering Surveillance Complete | |
05000263/LER-1997-010, Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments | 16 October 1997 | Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments | |
05000263/LER-1997-011, Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments | 16 October 1997 | Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments | |
05000263/LER-1997-012, Forwards LER 97-012-00 Re CST Low Level Suction Transfer Setpoint Which Did Not Provide Sufficient Submergence as Result of Design Deficiency.Commitments Made within Ltr, Submitted | 27 October 1997 | Forwards LER 97-012-00 Re CST Low Level Suction Transfer Setpoint Which Did Not Provide Sufficient Submergence as Result of Design Deficiency.Commitments Made within Ltr, Submitted | |
05000263/LER-1997-013, Forwards LER 97-013-00,re Insertion of Manual Scram Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping Recombiners.New Commitments Listed | 22 December 1997 | Forwards LER 97-013-00,re Insertion of Manual Scram Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping Recombiners.New Commitments Listed | |
05000263/LER-1997-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed | 12 January 1998 | Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed | |
05000263/LER-1998-001, Forwards LER 98-001-00 Re Containment Isolation Valve Leakage Which Exceeded Ts.Commitment Made by Util,Listed | 22 April 1998 | Forwards LER 98-001-00 Re Containment Isolation Valve Leakage Which Exceeded Ts.Commitment Made by Util,Listed | |
05000263/LER-1998-003, Forwards LER 98-003-00 Re Transgranular Stress Corrosion Cracking Identified in Control Rod Drive Lines.Rept Contains Listed New NRC Commitments | 14 May 1998 | Forwards LER 98-003-00 Re Transgranular Stress Corrosion Cracking Identified in Control Rod Drive Lines.Rept Contains Listed New NRC Commitments | |
05000263/LER-1998-004, Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment | 9 October 1998 | Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment | |
05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed | 21 October 1998 | Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed | |
05000282/LER-1978-018, Forwards LER 78-018/01T-0 | 26 September 1978 | Forwards LER 78-018/01T-0 | |
05000282/LER-1978-020, Forwards LER 78-020/03L-0 | 1 November 1978 | Forwards LER 78-020/03L-0 | |
05000282/LER-1979-009, Forwards LER 79-009/01T-0 | 26 April 1979 | Forwards LER 79-009/01T-0 | |
05000282/LER-1979-022, Forwards LER 79-022/03L-0 | 15 August 1979 | Forwards LER 79-022/03L-0 | |
05000282/LER-1981-011, Forwards LER 81-011/01T-0 | 24 August 1981 | Forwards LER 81-011/01T-0 | |
05000282/LER-1981-026, Forwards LER 81-026/03L-0 | 7 December 1981 | Forwards LER 81-026/03L-0 | |
05000282/LER-1981-031, Forwards Rept Providing Supplemental Info Re Degradation of Certain Spent Fuel Assemblies First Reported in LER 81-031 on 811230.All Region 4,5 & 6 Fuel Will Be Treated as Susceptible to Bulge Joint Cracking | 13 July 1987 | Forwards Rept Providing Supplemental Info Re Degradation of Certain Spent Fuel Assemblies First Reported in LER 81-031 on 811230.All Region 4,5 & 6 Fuel Will Be Treated as Susceptible to Bulge Joint Cracking | |
05000282/LER-1982-011, Forwards LER 82-011/03L-0 | 20 July 1982 | Forwards LER 82-011/03L-0 | |
05000282/LER-1982-015, Forwards LER 82-015/01T-0 | 10 September 1982 | Forwards LER 82-015/01T-0 | |
05000282/LER-1982-016, Forwards LER 82-016/03L-0 | 6 October 1982 | Forwards LER 82-016/03L-0 | |
05000282/LER-1982-018, Forwards LER 82-018/03L-0 | 15 October 1982 | Forwards LER 82-018/03L-0 | |
05000282/LER-1982-019, Forwards LER 82-019/03L-0 | 15 October 1982 | Forwards LER 82-019/03L-0 | |
05000282/LER-1982-020, Forwards LER 82-020/03L-0 | 24 November 1982 | Forwards LER 82-020/03L-0 | |
05000282/LER-1982-021, Forwards Revised LER 82-021/03X-1 | 14 March 1983 | Forwards Revised LER 82-021/03X-1 | |
05000282/LER-1982-022, Forwards LER 82-022/03L-0 | 30 November 1982 | Forwards LER 82-022/03L-0 | |
05000282/LER-1983-003, Forwards LER 83-003/03L-0 | 23 March 1983 | Forwards LER 83-003/03L-0 | Missed surveillance |
05000282/LER-1983-005, Forwards LER 83-005/03L-0 | 8 April 1983 | Forwards LER 83-005/03L-0 | |
05000282/LER-1985-005, Forwards LER 85-005-00 | 21 February 1985 | Forwards LER 85-005-00 | |
05000282/LER-1989-010, Forwards Updated LER 89-010 Re Reactor Trip Resulting from Loss of One Reactor Coolant Pump Due to Personnel Error. Update Repts Change to Corrective Action Plans | 3 May 1991 | Forwards Updated LER 89-010 Re Reactor Trip Resulting from Loss of One Reactor Coolant Pump Due to Personnel Error. Update Repts Change to Corrective Action Plans | |
05000282/LER-1992-012, Forwards LER 92-012-01 Re auto-start of DG D1 Due to Failure to Use Operating Procedure.Encl Corrects Original LER to Add Word Not to Third Sentence of Cause of Event | 14 December 1992 | Forwards LER 92-012-01 Re auto-start of DG D1 Due to Failure to Use Operating Procedure.Encl Corrects Original LER to Add Word Not to Third Sentence of Cause of Event | |
05000282/LER-1993-002, Forwards LER 93-002-00.Administrative Procedures Will Include Specific Instructions to Establish Fire Watches When Fire Door Between CR & Records Room or Between CR & Operator Study Area,Blocked Open | 4 February 1993 | Forwards LER 93-002-00.Administrative Procedures Will Include Specific Instructions to Establish Fire Watches When Fire Door Between CR & Records Room or Between CR & Operator Study Area,Blocked Open | |