Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
05000263/LER-1978-030, Forwards Revised LER 78-030/01X-1 to Correct Typographical Error in Valve Identification Number5 January 1979Forwards Revised LER 78-030/01X-1 to Correct Typographical Error in Valve Identification Number
05000263/LER-1979-022, Forwards LER 79-022/03L-011 January 1980Forwards LER 79-022/03L-0
05000263/LER-1980-025, Forwards Updated LER 80-025/03L-129 June 1982Forwards Updated LER 80-025/03L-1
05000263/LER-1981-017, Forwards Updated LER 81-017/03L-12 July 1982Forwards Updated LER 81-017/03L-1
05000263/LER-1982-006, Forwards LER 82-006/03L-03 June 1982Forwards LER 82-006/03L-0
05000263/LER-1982-007, Forwards LER 82-007/03L-025 August 1982Forwards LER 82-007/03L-0
05000263/LER-1982-008, Forwards LER 82-008/03L-029 September 1982Forwards LER 82-008/03L-0
05000263/LER-1982-016, Forwards LER 82-016/01T-012 October 1982Forwards LER 82-016/01T-0
05000263/LER-1983-005, Forwards LER 83-005/03L-017 March 1983Forwards LER 83-005/03L-0
05000263/LER-1983-006, Forwards LER 83-006/01T-022 April 1983Forwards LER 83-006/01T-0
05000263/LER-1992-010, Forwards LER 92-010-01,modifying Root Cause of First Event, Based on Investigation Delineated in LER 92-012-0017 November 1992Forwards LER 92-010-01,modifying Root Cause of First Event, Based on Investigation Delineated in LER 92-012-00Missed surveillance
05000263/LER-1992-012, Forwards LER 92-012-01 Initially Re Failure to Include Manual Valves in Section XI Testing.Results of Review & Other ASME Section XI Program Discrepancies,Noted in Insp Rept 50-263/92-10 Warranted Rev to LER19 November 1992Forwards LER 92-012-01 Initially Re Failure to Include Manual Valves in Section XI Testing.Results of Review & Other ASME Section XI Program Discrepancies,Noted in Insp Rept 50-263/92-10 Warranted Rev to LER
05000263/LER-1993-003, Forwards Suppl 2 to LER 93-003 Re MSIVs That Exceeded TS Leakage Limit,To Reflect Results of Analysis of Sample of Film Removed from MSIV Seats Earlier This Yr26 October 1993Forwards Suppl 2 to LER 93-003 Re MSIVs That Exceeded TS Leakage Limit,To Reflect Results of Analysis of Sample of Film Removed from MSIV Seats Earlier This Yr
05000263/LER-1993-010, Forwards LER 93-010-00 Re Main Control Room Emergency Filtration Train Outside Design Basis Caused by in-leakage Across Inlet Dampers.Lessons Learned from Event Will Be Presented in Engineering Technical Staff Training23 November 1993Forwards LER 93-010-00 Re Main Control Room Emergency Filtration Train Outside Design Basis Caused by in-leakage Across Inlet Dampers.Lessons Learned from Event Will Be Presented in Engineering Technical Staff Training
05000263/LER-1994-002, Provides Suppl Rept to LER 94-002-01.Suppl Rept Corrects Error Re Labeling of Axes for Graph of Instantaneous Trip Settings Vs Actual Current to Trip2 August 1994Provides Suppl Rept to LER 94-002-01.Suppl Rept Corrects Error Re Labeling of Axes for Graph of Instantaneous Trip Settings Vs Actual Current to Trip
05000263/LER-1994-008, Forwards Rev 0 to Calculation CA-95-044, Estimation of Cable Spreading Room Equipment Floor Loading, in Response to 950509 Telcon Request in Support of Closure of LER 94-00819 May 1995Forwards Rev 0 to Calculation CA-95-044, Estimation of Cable Spreading Room Equipment Floor Loading, in Response to 950509 Telcon Request in Support of Closure of LER 94-008
05000263/LER-1995-007, Forwards LER 95-007-00 Re mis-positioning of Div B Drywell Spray Block Valve.Rept Contains New NRC Commitment13 November 1995Forwards LER 95-007-00 Re mis-positioning of Div B Drywell Spray Block Valve.Rept Contains New NRC Commitment
05000263/LER-1996-003, Forwards LER 96-003-00 Re re-analysis of High Energy Line Break,Error Found in Existing Analysis.Rept Contains Submitted New NRC Commitments8 May 1996Forwards LER 96-003-00 Re re-analysis of High Energy Line Break,Error Found in Existing Analysis.Rept Contains Submitted New NRC Commitments
05000263/LER-1997-004, Forwards LER 97-004-00 Re Failure to Submit Relief Requests for Limited ISI Exams.Rept Contains Two New NRC Commitments24 March 1997Forwards LER 97-004-00 Re Failure to Submit Relief Requests for Limited ISI Exams.Rept Contains Two New NRC Commitments
05000263/LER-1997-005, Forwards LER 97-005,which Contains One New Commitment.Diesel Fuel Surveillance Procedure Will Be Changed to Require Completion of Required Analyses Prior to Considering Surveillance Complete5 May 1997Forwards LER 97-005,which Contains One New Commitment.Diesel Fuel Surveillance Procedure Will Be Changed to Require Completion of Required Analyses Prior to Considering Surveillance Complete
05000263/LER-1997-010, Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments16 October 1997Forwards LER 97-010-00 Re Failure to Include Some Supports on Reactor Head Vent Line in ISI Program in 2nd 10-Yr Interval.Rept Contains Two New NRC Commitments
05000263/LER-1997-011, Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments16 October 1997Forwards LER 97-011-00 Re Error in Procedure Causes Failure to Transfer HPCI & RCIC Suctions to Suppression Pool.Rept Contains Four New NRC Commitments
05000263/LER-1997-012, Forwards LER 97-012-00 Re CST Low Level Suction Transfer Setpoint Which Did Not Provide Sufficient Submergence as Result of Design Deficiency.Commitments Made within Ltr, Submitted27 October 1997Forwards LER 97-012-00 Re CST Low Level Suction Transfer Setpoint Which Did Not Provide Sufficient Submergence as Result of Design Deficiency.Commitments Made within Ltr, Submitted
05000263/LER-1997-013, Forwards LER 97-013-00,re Insertion of Manual Scram Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping Recombiners.New Commitments Listed22 December 1997Forwards LER 97-013-00,re Insertion of Manual Scram Due to Loss of Condenser Vacuum.Caused by Electrical Fault Tripping Recombiners.New Commitments Listed
05000263/LER-1997-014, Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed12 January 1998Forwards LER 97-014-00 Re Div II ADS Inhibit Switch Which Was Not Tested as Required by Ts.Commitment,Listed
05000263/LER-1998-001, Forwards LER 98-001-00 Re Containment Isolation Valve Leakage Which Exceeded Ts.Commitment Made by Util,Listed22 April 1998Forwards LER 98-001-00 Re Containment Isolation Valve Leakage Which Exceeded Ts.Commitment Made by Util,Listed
05000263/LER-1998-003, Forwards LER 98-003-00 Re Transgranular Stress Corrosion Cracking Identified in Control Rod Drive Lines.Rept Contains Listed New NRC Commitments14 May 1998Forwards LER 98-003-00 Re Transgranular Stress Corrosion Cracking Identified in Control Rod Drive Lines.Rept Contains Listed New NRC Commitments
05000263/LER-1998-004, Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment9 October 1998Forwards LER 98-004-00 Re Manual Scram Inserted Following Pressure Transient Closes Air Ejector Suction Isolation Valves & Trips Offgas Recombiners.Ler Contains Listed Commitment
05000263/LER-1998-005, Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed21 October 1998Forwards LER 98-005-00,re HPCI Being Removed from Service to Repair Steam Leak in Drain Trap Bypass.Commitments Made by Util Are Listed
05000282/LER-1978-018, Forwards LER 78-018/01T-026 September 1978Forwards LER 78-018/01T-0
05000282/LER-1978-020, Forwards LER 78-020/03L-01 November 1978Forwards LER 78-020/03L-0
05000282/LER-1979-009, Forwards LER 79-009/01T-026 April 1979Forwards LER 79-009/01T-0
05000282/LER-1979-022, Forwards LER 79-022/03L-015 August 1979Forwards LER 79-022/03L-0
05000282/LER-1981-011, Forwards LER 81-011/01T-024 August 1981Forwards LER 81-011/01T-0
05000282/LER-1981-026, Forwards LER 81-026/03L-07 December 1981Forwards LER 81-026/03L-0
05000282/LER-1981-031, Forwards Rept Providing Supplemental Info Re Degradation of Certain Spent Fuel Assemblies First Reported in LER 81-031 on 811230.All Region 4,5 & 6 Fuel Will Be Treated as Susceptible to Bulge Joint Cracking13 July 1987Forwards Rept Providing Supplemental Info Re Degradation of Certain Spent Fuel Assemblies First Reported in LER 81-031 on 811230.All Region 4,5 & 6 Fuel Will Be Treated as Susceptible to Bulge Joint Cracking
05000282/LER-1982-011, Forwards LER 82-011/03L-020 July 1982Forwards LER 82-011/03L-0
05000282/LER-1982-015, Forwards LER 82-015/01T-010 September 1982Forwards LER 82-015/01T-0
05000282/LER-1982-016, Forwards LER 82-016/03L-06 October 1982Forwards LER 82-016/03L-0
05000282/LER-1982-018, Forwards LER 82-018/03L-015 October 1982Forwards LER 82-018/03L-0
05000282/LER-1982-019, Forwards LER 82-019/03L-015 October 1982Forwards LER 82-019/03L-0
05000282/LER-1982-020, Forwards LER 82-020/03L-024 November 1982Forwards LER 82-020/03L-0
05000282/LER-1982-021, Forwards Revised LER 82-021/03X-114 March 1983Forwards Revised LER 82-021/03X-1
05000282/LER-1982-022, Forwards LER 82-022/03L-030 November 1982Forwards LER 82-022/03L-0
05000282/LER-1983-003, Forwards LER 83-003/03L-023 March 1983Forwards LER 83-003/03L-0Missed surveillance
05000282/LER-1983-005, Forwards LER 83-005/03L-08 April 1983Forwards LER 83-005/03L-0
05000282/LER-1985-005, Forwards LER 85-005-0021 February 1985Forwards LER 85-005-00
05000282/LER-1989-010, Forwards Updated LER 89-010 Re Reactor Trip Resulting from Loss of One Reactor Coolant Pump Due to Personnel Error. Update Repts Change to Corrective Action Plans3 May 1991Forwards Updated LER 89-010 Re Reactor Trip Resulting from Loss of One Reactor Coolant Pump Due to Personnel Error. Update Repts Change to Corrective Action Plans
05000282/LER-1992-012, Forwards LER 92-012-01 Re auto-start of DG D1 Due to Failure to Use Operating Procedure.Encl Corrects Original LER to Add Word Not to Third Sentence of Cause of Event14 December 1992Forwards LER 92-012-01 Re auto-start of DG D1 Due to Failure to Use Operating Procedure.Encl Corrects Original LER to Add Word Not to Third Sentence of Cause of Event
05000282/LER-1993-002, Forwards LER 93-002-00.Administrative Procedures Will Include Specific Instructions to Establish Fire Watches When Fire Door Between CR & Records Room or Between CR & Operator Study Area,Blocked Open4 February 1993Forwards LER 93-002-00.Administrative Procedures Will Include Specific Instructions to Establish Fire Watches When Fire Door Between CR & Records Room or Between CR & Operator Study Area,Blocked Open