Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20054L940 | 23 June 1982 | Consents to Ga Technologies,Inc Filing of Application for Transfer of Licenses R-38 & R-67 from Ga Co | |
ML20055G995 | 19 July 1990 | Responds to Re Results of NRC Review of 10CFR50.59 Safety Analysis. Safety Evaluation Under 10CFR50.59 Microprocessor-Based Instrumentation & Control Sys for Ga Co Triga Mark I Reactor, Encl | |
ML20056B326 | 21 August 1990 | Responds to Comment Re Precautions to Prevent Radioactive Contamination from Feed Conveyor from Spreading/Airborne. Feed Conveyor Equipped W/Side Barriers & Bottom Pan to Contain & Minimize Contamination Spread | |
ML20056F243 | 24 August 1993 | Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 70-0734/93-03 on 930726.Emergency Svc Procedure ES-2 Also Encl | |
ML20056F302 | 23 August 1993 | Forwards Soil Sampling Plan for Phase II of Sva Decommissioning Project | |
ML20057B379 | 30 September 1993 | Forwards Semiannual Effluent Rept for Jan-June 1993, Including Data on Radiological Gaseous & Particulate Effluent Released to Unrestricted Areas & Radiological Liquid Effluents Released to Sewerage Treatment Plant | |
ML20058E829 | 9 November 1993 | Forwards Final Rept, Radiological Survey of General Atomics Sva Facility,San Diego,Ca | |
ML20058K208 | 6 December 1993 | Forwards Proprietary SNM & Source Matl Physical Inventory Summary Rept, Reflecting Plant Activity for Period Ending 931108.Rept Withheld | |
ML20058M605 | 1 October 1993 | Requests Two Week Extension from 931012-26 in Closing Plant II (Triga Fabrication) Less than 20% Enriched Uranium Physical Inventory | |
ML20058N711 | 13 October 1993 | Responds to NRC Bulletin 91-001,suppl 1, Reporting Loss of Criticality Safety Controls | |
ML20058P595 | 13 October 1993 | Forwards Proprietary SNM Physical Inventory Summary Rept for Plant Enriched Uranium,Reflecting Activity for Period Ending 930913.Rept Withheld | |
ML20058P609 | 12 October 1993 | Forwards SNM Physical Inventory Summary Repts Reflecting Plant Activity for Period Ending 930913.Rept Withheld | |
ML20058P701 | 14 June 1990 | Forwards SNM Physical Inventory Summary Rept for Period Ending 900521.Encl Withheld | |
ML20059A769 | 22 October 1993 | Responds to Request for Addl Info on 930820 Submittal of Soil Sampling Plan for Phase II of Sva Decommissioning Project | |
ML20059E768 | 4 September 1990 | Forwards Revs to Semiannual Effluent Rept for Jan-June 1990 | |
ML20059H598 | 11 September 1990 | Responds to Requesting Rev to Ga Radiological Contingency Plan to Address Onsite Presence of Tenants & Nonpersonnel.Ga Proposes to Submit Revs within 45 Days | |
ML20062B301 | 15 September 1978 | Forwards RO on 780831 | |
ML20062G314 | 25 October 1990 | Forwards Comments Re Administration of Reactor Operator & Senior Reactor Operator Exams at General Atomics | |
ML20125D373 | 9 December 1992 | Submits 30-day Written Rept Re Detection of Trace Levels of Fission Product Activity in Pit Water & Surrounding Areas of Mark F Reactor.Increased Surveillance Will Continue Until Next Scheduled Reactor Shutdown Planned on 921223 | |
ML20125E454 | 1 May 1985 | Requests That Forwarding Safeguards Amend SG-1 Be Withheld (Ref 10CFR2.790) | |
ML20126D727 | 22 December 1992 | Forwards Change Pages to Radiological Contingency Plan, Initially Submitted Via ,In Response to NRC 921125 Request | |
ML20126F338 | 7 December 1992 | Forwards SNM Physical Inventory Summary Repts Reflecting Plant Activity for Period Ending 921109.W/o Encl | |
ML20126J835 | 29 April 1981 | Forwards Endorsement 53 to Maelu Policy MF-59 | |
ML20127M649 | 20 January 1993 | Forwards Response to NOV Issued on 921222.W/o Stated Encl | |
ML20128A729 | 25 April 1985 | Forwards Revised Chapter 21 to Category I Fixed Site Physical Protection Plan.Chapter 21 Will Be Distributed on 850424 for Inclusion in Plan.Encl Withheld | |
ML20128E906 | 20 May 1985 | Forwards Spec Pages II 4-16 & II 4-17 for Incorporation Into 850423 Application for Renewal of License SNM-696.Pages Include Addl Info Re Testing,Calibr & Maint of Criticality Alarms | |
ML20128F619 | 28 August 1996 | Forwards Semiannual Effluent Rept Required for Period 960101-0630,data on Radiological Gaseous & Particulate Effluent Released to Unrestricted Areas,Backup Info & Calculation Worksheet for Releases Into Sanitary Sewage Sys | |
ML20128G779 | 30 September 1996 | Forwards General Atomics Site Decommissioning Plan, Dtd Sept 1996,per 10CFR70.38.Decommissioning Plan & Activities, Discussed | |
ML20128K045 | 9 February 1993 | Suppls Reporting That Trace Levels of Fission Product Releases Detected in Pit Water & Air Surrounding Mark F Reactor.After Startup on 930105,trace Levels Again Detected.Graphic of Mark F CAM Activity Encl | |
ML20128Q552 | 7 October 1996 | Forwards Proprietary SNM Physical Inventory Summary Reports Which Reflec Plant Activity for Period Ending 960916. Rept Withheld | |
ML20128Q738 | 20 June 1985 | Forwards Results of Wipe & Meter Survey of Fuel Fabrication Facility,Bldg 37 | |
ML20129B790 | 15 October 1996 | Forwards Section 4, Radiological Safety of Part II License Specifications of SNM-696 & Significant Changes to Chapter 4 of License & Justification | |
ML20129C205 | 11 October 1996 | Forwards Corrected General Atomics Site Decommissioning Plan | |
ML20132A396 | 30 August 1985 | Forwards Addl Info Re Planned Reorganization in Response to 850815 Request.Planned Changes Will Not Decrease Effectiveness in Implementing License Conditions & Protecting Employees | |
ML20132A923 | 11 December 1996 | Requests Authorization to Release Soil,Asphalt & Gravel to Unrestricted Use So It Can Be Disposed of as Debris at Local Landfill.Table Which Presents Summary of Results of Gamma Spectroscopy Analysis Completed on Each Sample,Encl | |
ML20133C563 | 5 December 1996 | Forwards General Atomics' Site Decommissioning Plan, Dtd Sept 1996 Which Has Been Revised to Include Section on Fire Protection, Per Request | |
ML20133F947 | 10 September 1985 | Advises of Intent to Remove Contaminated Soil or Vegetation Until Residuals Meet NRC Policy (SECY-81-576),Option 1 Criteria.Revised Plan for Releasing Certain Portions of Site to Unrestricted Use Will Be Sent for NRC Review | |
ML20133K399 | 1 October 1985 | Forwards Plan for Obtaining Approval to Release Portions of Site for Unrestricted Use.W/Two Oversize Maps Encl |