Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20012E926 | 20 March 1990 | Forwards SP/90 Position on Severe Accident Policy Issues Presented by NRC During 900209 ACRS Full Committee Meeting | |
ML20084P651 | 30 November 1983 | Forwards Nonproprietary & Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance. Application for Withholding Proprietary Info (Ref 10CFR2.790) Encl | |
ML20084P657 | 30 November 1983 | Application for Withholding Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance (Ref 10CFR2.790) | |
ML20090D282 | 11 July 1984 | Forwards Nonproprietary & Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 4, Rcs. Proprietary Rept Withheld (Ref 10CFR2.790) | |
ML20090D287 | 11 July 1984 | Requests Withholding of Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 4, RCS, (Ref 10CFR2.790). Affidavit AW-82-57 Encl | |
ML20090H858 | 23 July 1984 | Forwards Application for Withholding Proprietary Info from Public Disclosure & Errata to Proprietary Version of Westinghouse Advanced PWR RESAR-SP/90,Preliminary Design Approval,Module 4,RCS. Errata Withheld (Ref 10CFR2.790) | |
ML20090H942 | 23 July 1984 | Submits Application to Withhold Proprietary Errata to Westinghouse Advanced PWR RESAR-SP/90,Preliminary Design Approval,Module 4,RCS, from Public Disclosure | |
ML20090J835 | 16 May 1984 | Forwards Nonproprietary & Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site. Application for Withholding Proprietary Info (Ref 10CFR2.790) Encl | |
ML20090J839 | 16 May 1984 | Application for Withholding Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site (Ref 10CFR2.790) | |
ML20094D159 | 31 July 1984 | Forwards Proprietary & Nonproprietary Vols 1 & 2 of RESAR-SP/90 Westinghouse Advanced Pwr,Module 5, Reactor Sys. Proprietary Rept Withheld (Ref 10CFR2.790) | |
ML20094D173 | 31 July 1984 | Requests Withholding Proprietary Vols 1 & 2 of RESAR-SP/90 Westinghouse Advanced Pwr,Module 5, Reactor Sys (Ref 10CFR2.790).Affidavit AW-82-57 Encl | |
ML20094J286 | 2 August 1984 | Forwards Table of Contents Illustrating Integrated Modules 6 & 8 Re Secondary Side Safeguards Sys & Steam & Power Conversion Sys | Incorporated by reference |
ML20097A090 | 24 August 1984 | Forwards Outline of Proposed Scope & Schedule for PRA to Be Submitted as Part of Application for Preliminary Design Approval of Advanced PWR Power Block Design | Probabilistic Risk Assessment |
ML20099G576 | 9 November 1984 | Application for Withholding Proprietary RESAR-SP/90 Westinghouse Advanced PWR Preliminary Design Approval Modules 6 & 8, Secondary Side Safeguards Sys / Steam Power..., (Ref 10CFR2.790) | |
ML20099H953 | 27 February 1985 | Requests Withholding of Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power (Ref 10CFR2.790) | |
ML20101C653 | 1 May 1984 | FOIA Request for Five Categories of Documents,Including Comments on Draft NUREG-1070,RESAR-SP/90 & Sandia Rept Entitled, Accident Sequence Evaluation Program Plant Survey & Initial Plant Grouping Ltr Rept | Probabilistic Risk Assessment |
ML20102A467 | 9 February 1984 | Requests That NRC Reconsider Position Re Future Role of Preliminary Design Approval (Pda) Application Requirements. Pda Considered Incentive for New Programs in Industry & Accreditation Important to Marketing Aspect | |
ML20106E138 | 30 January 1985 | Submits Application for Withholding Proprietary Amend 1 to Wapwr RESAR-SP/90 Pda Module 3, Introduction & Site, from Public Disclosure,Per 10CFR2.790 | |
ML20106E638 | 31 January 1984 | Requests Withholding of Proprietary RESAR-SP/90 Westinghouse Advanced PWR Preliminary Design Approval Module 7, Structural/Equipment Design (Ref 10CFR2.790) | |
ML20108F217 | 30 November 1984 | Requests Withholding Proprietary Version of Amend 1 to Westinghouse Advanced PWR RESAR-SP/90,Preliminary Design Approval,Module 5, Reactor Sys, Per 10CFR2.790 | |
ML20116E269 | 16 April 1985 | Requests Withholding of Proprietary Amend 3 to Westinghouse Advanced PWR RESAR-SP/90 Module 5, Reactor Sys, Section 4.5, Reactor Matls (Ref 10CFR2.790) | |
ML20128L802 | 28 June 1985 | Requests Withholding of Proprietary Westinghouse Advanced PWR RESAR-SP/90,PDA Module 16, Probabilistic Safety Study, Vols 1 & 2 Per 10CFR2.790.Affidavit Encl | |
ML20128P639 | 12 July 1985 | Requests Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Be Withheld (Ref 10CFR2.790) | |
ML20135J070 | 20 September 1985 | Submits Application for Withholding Proprietary Westinghouse Advanced PWR RESAR-SP/90,Module 12, Waste Mgt, Per 10CFR2.790 | |
ML20135J094 | 13 September 1985 | Requests Withholding of Proprietary Vols 3 & 4 to RESAR-SP/90 Westinghouse Advanced Pwr,Pda Module 16, Probabilistic Safety Study, Per 10CFR2.790.Affidavit Encl | |
ML20148G987 | 7 January 1988 | Requests That Encl Info Re Response to NRC Questions 252.1-14 & 220.1-9,in Review of Wapwr RESAR-Sp/90 Pda Be Withheld (Ref 10CFR2.790 & 9.5(4)) | |
ML20148H233 | 22 March 1988 | Application for Withholding Proprietary Amend 1 to RESAR-SP/90 Pda Module 12, Waste Mgt, from Public Disclosure Per 10CFR2.790(b)(1) | |
ML20148N687 | 24 March 1988 | Requests That Encl Proprietary Amend 2 to RESAR-SP/90 Pda Module 13, Auxiliary Sys, Be Withheld (Ref 10CFR2.790) | Safe Shutdown Safe Shutdown Earthquake Emergency Lighting Incorporated by reference Earthquake Fire Protection Program |
ML20150C901 | 23 June 1988 | Requests Withholding of Addendum 10 to Wapwr RESAR-SP-90 Pda Re Westinghouse Response to NRC Outstanding SEB Questions from Public Disclosure (Ref 10CFR2.790) | |
ML20150E612 | 23 March 1988 | Requests That Proprietary Amend 2 to RESAR-SP/90 Pda Module 2, Regulatory Conformance Be Withheld from Public Disclosure (Ref 10CFR2.790) | Safe Shutdown |
ML20151L926 | 4 April 1988 | Requests Withholding Proprietary Version of Westinghouse 880406 Presentation of SP/90 PRA to ACRS Subcommittee on Westinghouse Advanced Plants (Ref 10CFR2.790(b)(1)). Affidavit & Nonproprietary Version of Presentation Encl | |
ML20151N428 | 27 July 1988 | Requests That Proprietary Amend 2 to Westinghouse Advanced PWR RESAR-SP/90 Pda Module 11, Radiation Protection & Amend 2 to RESAR-SP/90 Pda Module 12, Waste Mgt, Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20151T861 | 5 August 1988 | Requests That Proprietary Amend 4 to Westinghouse Advanced PWR RESAR-SP/90 Pda Module 13, Auxiliary Sys Be Withheld from Public Disclosure (10CFR2.790) | |
ML20151Y006 | 20 April 1988 | Requests That Amend 2 to RESAR-SP/90 Pda Module 13, Auxiliary Sys, Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20153F713 | 25 August 1988 | Requests Withholding of Amend 3 to Wapwr RESAR-SP/90 Pda Module 3, Radiation Protection (Ref 10CFR2.790) | |
ML20154E947 | 13 May 1988 | Requests That Proprietary Amend 3 to RESAR-SP/90 Pda Module 13, Auxiliary Sys, Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20154F051 | 13 May 1988 | Requests That Amends 1a & 3 to Proprietary Wapwr RESAR-SP/90 Pda Module 1, Primary Side Safeguards Sys Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20154H494 | 13 May 1988 | Requests Withholding of Proprietary Version of Amend 1 to Wapwr RESAR-SP/90 Pda Module 4, RCS, Per 10CFR2.790 | |
ML20154H656 | 13 May 1988 | Requests That Proprietary Amend 1a to RESAR-SP/90 Pda Module 3, Introduction & Site, Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20154J809 | 23 May 1988 | Requests That Proprietary Addendum 7 to RESAR-SP/90,PDA Module 2, Regulatory Conformance, Including Responses to Outstanding Safety Issues,Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20154K884 | 13 May 1988 | Requests That Proprietary Addendum 4 to RESAR-SP/90, Request for Addl Info Be Withheld from Public Disclosure Per 10CFR2.790(a) | |
ML20154R948 | 14 March 1986 | Requests That Proprietary Amend 1 to RESAR-SP/90 Pda Module 11, Radiation Protection Be Withheld from Public Disclosure Per 10CFR2.790(b)(1).Affidavit AW-82-57 Encl | |
ML20155C259 | 27 May 1988 | Submittal of Westinghouse Response to Staff Questions 470.1 to 470.2 in Review of Wapwr RESAR-SP/90 Pda & Application for Withholding Proprietary Info from Public Disclosure | |
ML20195C787 | 26 October 1988 | Requests Withholding of Amend 2 to Westinghouse Advanced PWR RESAR-SP/90 Pda Module 4, RCS from Public Disclosure (Ref 10CFR2.790) | |
ML20195H113 | 14 June 1988 | Requests That Westinghouse Submittal Re Response to Outstanding NRC Questions Be Treated as Proprietary Info Per 10CFR2.790(a) | |
ML20198T014 | 30 May 1986 | Requests That Encl Proprietary Amend 1 to RESAR-SP/90 Preliminary Design Approval Module 7, Structural/Equipment Design, Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20199B600 | 4 June 1986 | Requests Withholding Proprietary Amend 3 to RESAR-SP/90 Pda Module s, Reactor Sys, from Public Disclosure (Ref 10CFR2.790) | |
ML20199L163 | 9 June 1986 | Requests Withholding of Proprietary Amend 1 to Westinghouse Advanced PWR RESAR-SP/90 Preliminary Design Approval Module 1, Primary Side Safeguards Sys, (Ref 10CFR2.790).Affidavit Supporting Request Encl | |
ML20206F868 | 8 November 1988 | Requests Withholding Proprietary Rept from Public Disclosure Per 10CFR2.790 | |
ML20207F036 | 14 July 1986 | Requests Proprietary Amend 1 to RESAR-SP/90 Preliminary Design Approval Module 9, Instrumentations & Controls & Electric Power, Be Withheld from Public Disclosure,Per 10CFR2.790 |