ML20090J835

From kanterella
Jump to navigation Jump to search
Forwards Nonproprietary & Proprietary RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site. Application for Withholding Proprietary Info (Ref 10CFR2.790) Encl
ML20090J835
Person / Time
Site: 05000601
Issue date: 05/16/1984
From: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19269A137 List:
References
NS-EPR-2908, NUDOCS 8405230315
Download: ML20090J835 (2)


Text

w ..,

~

L

> \v/

Westinghouse Water Reactor Boxass PittsburghPemsylvania 15230 Electric Corporation Divisions NS-EPR-2908 May 16, 1984 Docket No. STN 50-601 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission i Washington, D. C. 20555

SUBJECT:

Westinghouse Advanced Pressurized Water Reactor (WAPWR) Reference Safety Analysis Report, RESAR-SP/90, PDA Module 3, " Introduction and Site".

Dear Mr. Denton:

Enclosed are:

I 1. Forty-one (41) copies of a Westinghouse document entitled, " Westinghouse Advanced Pressurized Water Reactor RESAR-SP/90, PDA Module 3, Introduction and Site" (Proprietary).

2. Four (4) copies of a Westinghouse document entitled, " Westinghouse Advanced Pressurized Water Reactor BESAR-SP/90, PDA Module 3, Introduction and Site" (Non-Proprietary).
3. One (1) copy of an Application for Withholding Proprietary Information from Public Disclosure, AW-84-40 (Non-Proprietary).

4 One (1) copy of an original affidavit, AW-82-57 (Non-Proprietary).

The enclosed document; HAPWR RESAR-SP/90, PDA Module 3, " Introduction and 4

Site"; is the third in a series of modular PDA documents planned for submittal L throughout 1984 and early 1985. In total, these modules will fully descrite the Westinghouse Advanced Pressurized Water Reactor Nuclear Power Block design.

This submittal contains proprietary information of Westinghouse Electric .

Corporatien. In conformance with the requirements of 10CFR 2.790, as amended, of the Comission's regulations, we are enclosing with this submittal an application for withholding proprietary information from public disclosure and e an affidavit. The affidavit sets forth the basis on which the information may -

l be withheld from public disclosure by the Commission.

\

1

, a e

  • m ne dwf s

e6 {cih6~

a. =

ip..(f 4g pris

(; . p

7-Mr. H. R. Denton Page 2 Correspondence with respect to the affidavit or application for withholding should .eference AW-84-40 and should be addressed to R. A. Wiesemann, Manager of Regulatory and Legislative Affairs, Westinghouse Electric Corporation, P. O.

Box 355, Pittsburgh, PA 15230.

Very truly yours, M

gt P. Rahe, Jr., Manager Nuclear Safety Department MDB/dr Enclosures cc: D. G. Eisenhut R. J. Mattson F. R. Miraglia, Jr.

C. O. Thomas K. T. Eccleston