i Wastinghouse Water Reactor g
bectric Corporation Divisions NS.-EPR-2862 Noveber 30, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Docket No. STN-50-601 U.S. Nuclear Regulatory Cons 11ssion Washington, D.C.
20555 SlJBJECT:
Westinghouse Advanced Pressurized Water Reactor (MAPWR) Reference Safety Analysis Report, RESAR SP/90, PDA Module 2, " Regulatory Conformance" REF:
1.
Westinghouse letter (NS-EPR-2675) dated Nov aber 1, 1983, E. P. Rahe, Jr. to F. Miraglia
Dear Mr. Denton:
Enclosed are:
1.
Forty-one (41) copies of a Westinghouse document entitled, " Westinghouse Advanced Pressurized Water Reactor RESAR SP/90, FDA Module 2, Regulatory Conformance" (Proprietary).
2.
Four (4) copies of a Westinghouse document entitled, " Westinghouse Advanced Pressurized Water Reactor RESAR SP/90, PDA Module 2, Regulatory Conformance" (Non-Proprietary).
3 One (1) copy of an Application for Withholding Proprietary Infonnation From Public Disclosure, AW-83-109 (Non-Proprietary).
4.
One (1) copy of an original affidavit, AW-82-57 (Non-Proprietary).
The enclosed document; MAPWR RESAR SP/90, PDA Modale 2, " Regulatory Confonnance"; is the second in a series of modular PDA documents planned for submittal over the next thirteen months. The number of copies submitted were agreed to via discussion with the NRC Special Projects Branch (Mr. G. C. Meyer).
8*
This Regulatory Conformance module is an updated version of the " Licensing Control Document" submitted via reference 1.
It has been prepared to ensure a
S that both current and anticipated licensing requirments and guidance are O
considered as an integral part of the MAPWR design in response to new or 8
potential fbture licensing requirements, and indicates Westinghouse design, l
analysis / evaluation, and licensing documentation intentions for the MAPWR.
.R
~*
Westinghouse requests that the NRC staff review this document from the standpoint of (1) completeness in addressing new or potential future licensing requirments, and (2) adequacy'of the Westinghouse interpretation and response to these licensing requirements.
on
'h
[68I h
- 4 aris5
> i>r e
. Mr. H. R. Denton Pcge Two This submittal contains proprietary information of Westinghouse Electric Corporation. In conformance with the requirenents of 10CFR 2.790, as amended,
)
of the Consnission's regulations, we are enclosing with this submittal an j
application for withholding proprietary information from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission.
Correspondence with respect to the affidavit or application for withholding should reference AW-83-109 and should be addressed to R. A. Wiesemann, Manager of Regulatory and Legislative Affairs, Westinghouse Electric Corporation, P.O.
Box 355, Pittsburgh, Pennsylvania 15230.
Very truly yours, W
E. P. Rahe, Jr