Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML14083A62026 March 2014Nuclear Regulatory Commission Audits of Licensee Responses to Reliable Spent Fuel Pool Instrumentation Order EA-12-051Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
ML14338A1109 December 2014Plant for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051FLEX
Spent Fuel Pool Instrumentation
ML14356A00310 February 2015Audit of Licensee Responses to the Expedited Seismic Evaluation Process to Support Implementation of Near-Term Task Force Recommendation 2.1, SeismicSafe Shutdown
ML15083A54631 March 2015Requests for Additional Information for the Environmental Review of LaSalle County Station, Units 1 and 2, License Renewal Application (TAC Nos. MF5567 and MF5568)Internal Flooding
Probabilistic Risk Assessment
B.5.b Mitigating Strategies
ML15105A3664 May 2015Environmental Audit Needs ListZebra Mussel
ML15105A3814 May 2015Environmental Audit Plan
ML15196A11522 September 2015Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2,Half scram
Ultimate heat sink
Fire Barrier
Coatings
Nondestructive Examination
VT-2
B.5.b
Aging Management
Operability Determination
Moisture barrier
Pressure Boundary Leakage
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
ML16259A1895 December 2016Nuclear Regulatory Commission Plan for the Audit of Mitigation Strategies Assessment Submittals Related to Order EA-12-049, Order to Modify Licenses With Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML17220A32810 August 2017Nuclear Regulatory Commission Audits of Licensee Responses to Phase 2 of Order EA-13-109 to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
ML20159A00311 June 2020Supplement to the Audit Plan in Support of Staff Review of LAR to Adopt 10 CFR 50.69High winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Tornado Generated Missile
Large early release frequency
Turbine Missile
Very Early Warning Fire Detection
ML20160A16411 June 2020Supplement to the Audit Plan in Support of Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion TimesHigh winds
Ultimate heat sink
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Feedwater Controller Failure
Large early release frequency
Maintenance Rule Program
Turbine Missile
Very Early Warning Fire Detection
ML22214A0042 August 2022Audit Plan to Support the Review of Amendments to Revise Criticality Safety Analysis Methodologies (Epids L-2022-LLA-0085, L-2021-LLA-0124, and L-2021-LLA-0159)