Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML032940098 | 27 March 2003 | Riv Backfit Status | Backfit |
ML032940104 | 7 October 2003 | Riv Backfit Status | Backfit |
ML040410492 | 20 February 2004 | Order EA-03-009 Service List | |
ML040410657 | 18 February 2004 | Meeting Summary of January 21, 2004 with STPNOC- Enclosure 4 - Stpnoc'S Response to NRC Staff'S Comments | |
ML040770589 | 13 April 2004 | Draft Information Request Response to RAI - Attachment 7 | Finite Element Analysis |
ML040770593 | 23 December 2003 | Draft Information Request PRA Analysis Assessment PRA-03-024, Rev. 0 - Attachment 6 | |
ML042610072 | 13 September 2004 | Plant Engineering Branch Closed Items Interim Safety Basis | |
ML050340022 | 7 February 2005 | OPGP03-ZA-0091 | Offsite Dose Calculation Manual Probabilistic Risk Assessment Maintenance Rule Program Scaffolding |
ML050340025 | 7 February 2005 | 0POP01-ZO-0006, Rev. 13, Extended Allowed Outage Time | Offsite Dose Calculation Manual Grace period |
ML060330617 | 24 January 2006 | Safety Culture Survey with Slides | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML072110433 | 25 July 2007 | Questions from 1 Through 8 | Ultimate heat sink Fuel cladding |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML080800036 | 13 March 2008 | List of Attendees, 03/13/2008 Summary of Meeting with Eight Operating Nuclear Power Plant Licensees to Discuss Emerging Metallurgical Issues Certain Welds in Reactor Coolant System for Pressurized-Water Reactors | |
ML083510257 | 24 November 2008 | FEMA Region VI, Radiological Emergency Preparedness (Rep), South Texas Project (REP) Combined License Review, List of 55 RAIs | |
ML092570692 | 2 September 2009 | Draft Request from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue | Fitness for Duty |
ML092680190 | 24 September 2009 | Comments, Draft Request for Exemption from Certain Requirements of Revised 10 CFR 26.205(c) and (D) During Severe Weather Conditions | Fitness for Duty |
ML110880049 | 31 March 2011 | 03/02/2011 List of Participants STP, Units 1 and 2, License Renewal Environmental Scoping Meetings | |
ML11256A057 | 31 August 2011 | Documents to Support Review of the South Texas Project License Renewal Application, List of Transmitted Documents Including Copy of Each Document, Enclosure to NOC-AE-11002720 | |
ML112630676 | 20 September 2011 | NRC Staff Questions, Loss-of-Coolant Accident Frequency Analysis, Resolution Approach for Risk-Informed GSI-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance. | Probabilistic Risk Assessment |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results | Time of Discovery Mission time Significance Determination Process |
ML112770251 | 3 October 2011 | STP Responses to Questions Associated with LOCA Frequency Analysis | Weld Overlay Probabilistic Risk Assessment Earthquake Dissimilar Metal Weld |
ML113060606 | 2 November 2011 | Questions Associated with Loss-of-Coolant Accident (LOCA) Frequency Analysis | Weld Overlay Probabilistic Risk Assessment Earthquake Dissimilar Metal Weld |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML120610063 | 29 February 2012 | Intro for March 8, 2012 Public Meeting to Discuss GSI-191 | Exemption Request |
ML12145A466 | 18 May 2012 | Loca-Hybrid-Final | |
ML13140A269 | 20 May 2013 | NRC Slides for 5/23/13 Meeting Regarding Risk - Informed GSI-191 Pilot Application Initial Review Insights | Mission time Probabilistic Risk Assessment |
ML14086A386 | 17 March 2014 | STP Risk-Informed GSI-191 Aadb RAI 3 Response, Attachment 2 | Boric Acid |
ML15182A228 | 30 June 2015 | Supplemental Information for 7/2/15 Public Phone Call | Boric Acid Coatings Surveillance Frequency Control Program Large early release frequency Exemption Request |
ML15246A129 | 20 August 2015 | Attachment 2 - Requests for Exemptions for STP Piloted Risk-Informed Approach to Closure for GS1-191 Through 3-3 Technical Specifications Bases Page Markups (Information Only) | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Operating Basis Earthquake Surveillance Frequency Control Program Large early release frequency Exemption Request Maintenance Rule Program Fuel cladding Scaffolding |
ML16033A011 | 8 February 2016 | Attendance List for the January 19, 2016, Public Meeting with STP to Discuss the Plant-Specific Aging Management Program, Selective Leaching of Aluminum Bronze, Associated with STP's License Renewal Application | Aging Management |
ML16175A021 | 25 July 2016 | June 21, 2016, Attendance List | |
ML16347A325 | 6 December 2016 | ASP Analysis-Reject-South Texas Manual Reactor Trip and Valid Auxiliary Feedwater System Actuation-LER 498-2015-001 | |
ML17005A102 | 18 January 2017 | Attendance List for January 4, 2016, Meeting to Discussion STP - Response to Request for Additional Information the Revised Aluminum Bronze Selective Leaching Aging Management Program for All Potentially Susceptible Welds Throughout the Fac | Aging Management |
ML20135H170 | 14 May 2020 | Public Notice of Application for Amendment to Renewed Facility Operating License | |
ML22034A395 | 16 February 2022 | Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion | |
ML22034A397 | 16 February 2022 | Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion | |
ML22034A399 | 16 February 2022 | Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion | |
NOC-AE-13003043, Enclosure 5 - Response to NRC Supplemental Information Items | 13 November 2013 | Enclosure 5 - Response to NRC Supplemental Information Items | Boric Acid Time of Discovery Mission time Grab sample Weld Overlay Coatings Exemption Request Fuel cladding Scaffolding |