Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML051240323 | 18 July 2005 | Attachment to Comment Letter No. 2 - Comments/Suggestions Regarding NEI 04-01 | |
ML051720199 | 18 July 2005 | Table - Comments/Suggestions Regarding NEI 04-01 | Safe Shutdown Boric Acid Ultimate heat sink Anticipated operational occurrence Emergency Lighting Incorporated by reference Fire Protection Program |
ML051930012 | 18 July 2005 | Table - Comments/Suggestions Regarding NEI 04-01 | Safe Shutdown Incorporated by reference Large early release frequency Exemption Request Power-Operated Valves |
ML073110278 | 21 November 2007 | Enclosure - Revised Content Guide for Generic Letter 2004-02 Supplemental Responses November 2007 | Coatings Foreign Material Exclusion Exemption Request |
ML13268A342 | 5 December 2013 | NRC Staff Comments NEI 96-07 App C Revision 0D | Probabilistic Risk Assessment Incorporated by reference B.5.b Mitigating Strategies Exemption Request |
ML14031A159 | 23 April 2014 | NEI 08 01 Revision 5 Comments - 2014-01-30 | Hydrostatic Coatings Squib Earthquake |
ML15014A153 | 14 January 2015 | Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML15014A160 | 14 January 2015 | Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML17013A156 | 13 January 2017 | Improving the Efficiency of the Regulatory Framework for Dry Storage of Spent Nuclear Fuel | |
ML17013A157 | 12 January 2017 | Improving the Efficiency of the Regulatory Framework for Dry Storage of Used Nuclear Fuel | |
ML17079A379 | 7 March 2017 | Endorsement of Addendum 1 to NEI 08-09, Revision 6, Dated April 2010, Attachment 1 | Cyber Security |
ML17095A595 | 5 April 2017 | NEI Proposed Edits to Draft EPFAQ 2016-002 (April 4, 2017 Public Meeting) | Safe Shutdown High winds Earthquake |
ML17096A388 | 6 April 2017 | Proposed EPFAQ 2016-002 | Safe Shutdown High winds Earthquake |
ML17097A488 | 7 April 2017 | Attachment 1 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Summary List of Significant Industry Comments | Aging Management Subsequent License Renewal EVT-1 Dissimilar Metal Weld |
ML17097A489 | 7 April 2017 | Attachment 2 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Mechanical Comments | Nondestructive Examination Aging Management License Renewal |
ML17097A490 | 7 April 2017 | Attachment 3 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Structural Comments | Coatings Aging Management EVT-1 Dissimilar Metal Weld |
ML17097A491 | 7 April 2017 | Attachment 4 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Electrical Comments | Aging Management License Renewal Subsequent License Renewal |
ML17108A616 | 29 March 2017 | NEI 96-07 Appendix D Draft Revision 0b - Proposed Revisions - March 29 2017 | Anticipated operational occurrence Post Accident Monitoring Incorporated by reference |
ML17171A410 | 20 June 2017 | Attachment - Industry Comments on EPFAQ 2017-001 | Offsite Dose Calculation Manual |
ML17195A299 | 14 July 2017 | EPFAQ 2016-002 Clarification of Equipment Damage (Completed) | Safe Shutdown High winds Earthquake |
ML17209A021 | 14 July 2017 | 07-14-17 Anchor Darling Valve Industry Resolution Plan Attachment | Anchor Darling |
ML17214A699 | 5 July 2017 | Attachment 1: Method of Evaluation Guidance Extract - Clean Copy (7/05/2017, E-Mail from K. Cummings/Nei to R. Wharton/Nmss/Dsfm 72.48 and Method of Evaluation) | Aging Management |
ML17214A700 | 5 July 2017 | Attachment 2: Method of Evaluation Guidance Extract - Track Changes (7/05/2017, E-Mail from K. Cummings/Nei to R. Wharton/Nmss/Dsfm 72.48 and Method of Evaluation) | Aging Management |
ML17230A309 | 16 February 2017 | Attachment - Background and Industry Position on Revision 3 of Regulatory Guide 8.7 | High Radiation Area Backfit |
ML17241A028 | 29 August 2017 | NEI 16-16, Draft 2, Staff Comments (Jul 13, 2017) and NEI Discussion Points (Aug 10, 2017) | |
ML17249A100 | 30 September 2017 | NEI Response to NRC Comment Set 1 | Fitness for Duty Incorporated by reference B.5.b Mitigating Strategies |
ML17268A106 | 19 September 2017 | NEI 96-07, App Edits from September 19-21, 2017 Meeting | Post Accident Monitoring Incorporated by reference |
ML17271A200 | 16 May 2017 | NEI 96-07, Appendix D with Hsi Edits from Sep 19-21, 2017 Meeting | |
ML17312A795 | 8 November 2017 | NEI 96-07 Appendix D Section 4.3.6 Revised | Safe Shutdown Anticipated operational occurrence |
ML18016A125 | 11 January 2018 | White Paper Addressing the Impact of CCF and Application of Qualitative R1 | Significance Determination Process |
ML18030A771 | 23 January 2018 | Ensuring the Future of Us Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment | |
ML18065A041 | 14 February 2018 | List of Attendees List for 2/14/2018 Public Meeting | |
ML18068A406 | 12 March 2018 | NEI Examples- Use of COL License Conditions to Address Significant Errors in a Referenced Design Certification | Incorporated by reference |
ML18068A609 | 5 March 2018 | Resolutions to 11/30/17 NRC Comments on NEI 12-04, Revision 1A | Earthquake |
ML18081A288 | 22 March 2018 | EPFAQ 2018-001 RCS Barrier Loss Clarification | Pressure Boundary Leakage |
ML18081A302 | 22 March 2018 | EPFAQ 2018-002 BWR Unisolable Leak Question | |
ML18081A309 | 22 March 2018 | EPFAQ 2018-003 Containment Detector | |
ML18142A248 | 16 May 2018 | Attendees List for Summary of May 16, 2018, Meeting with Nuclear Energy Institute and Industry to Discuss Anchor Darling Fate Valve Draft Temporary Instruction | Anchor Darling |
ML18157A142 | 31 May 2018 | EPFAQ 2018-04 Hazardous Events Effects on Safety Systems Clarification | |
ML18176A178 | 31 December 2017 | Draft NEI 96-07, Appendix D Rev 0e | Anticipated operational occurrence |
ML18178A586 | 27 June 2018 | Draft NEI 18-03, Rev. F | Mission time Anticipated operational occurrence Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality Tornado Generated Missile Pressure Boundary Leakage |
ML18338A064 | 11 December 2018 | Session 2 Biographies for M. Billone, R. Montgomery, and B. Hanson | |
ML18338A290 | 4 December 2018 | Completed EPFAQ 2018-01 RCS Barrier Loss Clarification | Pressure Boundary Leakage |
ML18338A308 | 4 December 2018 | Completed EPFAQ 2018-02 BWR Unisolable Leak | Grace period |
ML18338A397 | 4 December 2018 | Completed EPFAQ 2018-03 Single Containment Fire Detector Alarm | |
ML19149A472 | 9 January 2019 | EPFAQ 2019-01 CU1 and CA1 IC Clarification Public Comment | |
ML19196A274 | 31 January 2019 | Attachment 1: Evaluation of Depletion Reactivity Decrement Bias and Uncertainty Values Using Linear Versus Quadratic Weighted Least Squares Regression Models | |
ML19196A275 | 31 January 2019 | Attachment 2: Comments on Draft SER, Revision 2 | |
ML19196A276 | 31 January 2019 | Attachment 3: Proposed Changes for EPRI Utilization Report & NEI 12-16, Revision 3 | |
ML19196A302 | 19 July 2019 | Disposition Table for NEI and EPRI Comments Draft Safety Evaluations for EPRI Depletion TRs 3002010613 and 3002010614 |