NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304)
December 2, 2013 Staff Comment 1 Section
1.1 Purpose and Scope
Delete reference to applicant Page C-1, second paragraph because all aspects specifically applicable to applicants are not The main body of NEI 96-07, Revision 1, was written to provide guidance for adequately covered.
developing effective and consistent processes for implementing 10 CFR 50.59. This appendix was developed by starting with the NEI 96-07, Revision 1, guidance and providing additional guidance / clarification only as needed to ensure that applicant-and licensee-initiated changes and departures are properly controlled, documented, and reported to the NRC in accordance with the Part 52 requirements.
To encompass all of the change processes that may be needed by a Part 52 COL applicant, this This appendix also provides guidance for changes to early site permits (ESPs), per 10 CFR 52.39(e).
In general, this appendix has been written for applicants and holders of combined licenses (COLs).
2 Section 1.2.3 Relationship to the UFSAR Replace FSARs outside with Page C-3 FSAR information outside because the FSAR is not outside New plant change processes identified in 10 CFR 52.98 are the processes that the plant-specific DCD. However, identify when a license amendment is required prior to implementing departures from there is FSAR information outside the plant-specific DCD, other changes to the facility or procedures described in the the scope of the plant-specific FSAR (as updated, or UFSAR), or tests and experiments not described in the DCD.
UFSAR. As such, it is important that the FSAR be properly maintained and updated in accordance with 10 CFR 50.71(e) and Section X of the design certification rules.
Guidance for updating FSARs information outside the scope of the plant-specific DCD is provided by Regulatory Guide 1.181, which endorses NEI 98-03, Revision 1.
Enclosure 1
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 3 Section 1.3 10 CFR Part 52 Change Process Overview The AIA change process is not Page C-6 Figure 1, 10 CFR Part 52 Change Process, Note at top of page discussed here and is also in Section VIII.B.5.
Note: For both site-specific FSAR and plant-specific DCD information, other regulations may apply in addition to 10 CFR 50.59 and VIII.B.5 those discussed here.
See Section 4.2 4 Section 1.3 10 CFR Part 52 Change Process Overview Yes branches need to proceed Page C-6 Figure 1, 10 CFR Part 52 Change Process from the YES point of the logical decision diamond.
On the decision diamonds, the YES branch process lines are depicted as emanating from the NO branch 5 Section 1.3 10 CFR Part 52 Change process Overview, Figure 1 (continued)
Consider introducing the concept of Page C-7 Figure 1 (Continued) first process block the simplified evaluation process within this figure.
Perform VIII.B.5 Screen Simplified Evaluation NOTE:
Section 3.19 does equate the VIII.B.5 screen to the VIII.B.5 simplified evaluation.
2
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 6 Section 1.3 10 CFR Part 52 Change process Overview, Figure 1 (continued)
Consistent with the following Page C-6, second decision block, output of the No leg decision diamond later on the page which, with a negative result, states Document simplified evaluation, implement the activity, and report to the NRC as Document evaluation, implement appropriate. activity, and report to NRC as appropriate.
Section X.A.3 of the design certification rules states that An applicant or licensee who references this appendix shall prepare and maintain written evaluations which provide the bases for the determinations required by Section VIII of this appendix. These evaluations must be retained The reporting obligation is governed by Section X.B of the design certification rules.
7 Section 3.4 Change/Departure (Plant Specific)
Page C-18, Discussion section, third paragraph The NRC has given this further consideration, and determined that Consistent with the treatment of changes to an SSAR by an ESP (72 FR 49360), the policy basis for the ESP typographical or administrative corrections that are not substantive deviations from exception does not apply to Tier 2 the Tier 2 information are not considered a departure and need not be evaluated information since there is a change through the Section VIII criteria. However, even typographical corrections to Tier 1 process for Tier 2 information and Tier 2* that are sought by a licensee require NRC approval.
Any change or departure from the plant specific information contained in the UFSAR requires an evaluation. This concept is further 3
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) described in the following Section 4.4.2.1, second paragraph.
8 Section 3.14 Methods of Evaluation Page C-24, Discussion section Correct reference.
The discussion in Section 3.10 of the main body of NEI 96-07, Revision 1, also applies to Part 52 licensees for changes under 10 CFR 50.59 or departures under Section VIII of the design certification rule(s) with the clarification that, with respect to the consequences of accidents, the dose limits for members of the public for Part 52 licensees are found in 10 CFR 52.47(a)(2) and 52.9779(a)(1) rather than 10 CFR 100 for Part 50 licensees.
9 Section 3.19 Screening Page C-27, Definition The proposed edit improves the definition because a simplified Screening or simplified evaluation is the process for determining whether a proposed evaluation is an evaluation under activity requires a 10 CFR 50.59 or Section VIII.B.5 evaluation to be performed. Section VIII.B.5, while the original Screening may be considered a simplified evaluation for purposes of meeting the text implies that it is not.
requirements of Section VIII.B.5.a.
4
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 10 Section 4.1.1 Construction Change Applicability The use of the term directly may Page C-33 Construction change activities that do not directly affect the CLB confuse licensees applying the change and departure screening This is expected to be the largest category because construction change activities and evaluation processes, by typically affect detailed design information that does not impact the CLB or require an omitting a change or departure that LAR. (Thus, these construction change activities are not changes/departures as affects the CLB.
defined in Section 3.4.) This includes various emerging unanticipated conditions or conflicts that may require an engineering change, e.g. interferences (recognized but not yet installed), conflicts with field routing, accumulation of acceptable field tolerances, etc. Licensees should manage these construction changes in accordance with 10 CFR Part 50, Appendix B, and should document the basis for concluding that the construction change does not directly affect the CLB (and thus does not require an LAR). Construction may proceed/continue while this type of change is dispositioned and documented.
11 Section 4.1.1 Construction Change Applicability See NRC Comment #12 OK as written Rev 0D August 31, 2012 Page 9 Page C-33 Construction changes/departures that affect the CLB A licensee must complete and If the change/departure is determined to affect the CLB, the licensee should apply the document the screening or 10 CFR 50.59, Section VIII.B.5, or other applicable change process in accordance simplified evaluation prior to with this appendix to determine if an LAR is required. If the change/departure does constructing the change/departure not require an LAR, the licensee shall document the screening/evaluation results, that is determined not to require may construct the change/departure (i.e., construction may proceed/continue) and prior NRC approval.
should update the UFSAR or other affected CLB documents in accordance with applicable requirements and licensee procedures.
5
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 12 Section 4.1.1 Construction Change Applicability LAR guidance is not constrained to Page C-34, Top of the page first and second paragraph LARs during the construction Construction changes/departures that require an LAR phase. LAR guidance is applicable throughout the life of the plant.
In particular, construction LARs should provide and other NRC guidance when preparing construction LARs Changes/departures that require a construction LAR may affect
- ALTERNATIVELY -
In particular construction LARs during construction should and other NRC guidance when preparing construction LARs during construction Changes/departures that require a construction LAR during construction may affect 13 Section 4.1.1 Construction Change Applicability Maintenance of the CLB is the Page C-34 responsibility of the licensee.
Licensee or the responsible design authority should track individual construction The licensee may delegate the changes via their design configuration control processes to monitor the effect of development and processing of cumulative impacts and to supplement CLB information when necessary CLB change documents, retaining responsibility for the results of any change to the CLB documents.
6
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 14 Section 4.1.1.1 Nonconforming Conditions during Construction Maintenance of the current Page C-35 licensing basis assures that the physical plant corresponds with the Nonconforming conditions are placed in the CAP (or other tracking process for Updated Final Safety Analysis nonconformances) and dispositioned by licensees as requiring rework, repair or use- Report (UFSAR).
as-is. Licensees will establish and maintain processes for review of corrective actions for nonconformances that are dispositioned as repair or use-as-is to determine the impact, if any, on the CLB and whether an LAR is required. Licensee NRC inspection activities are processes will assure configuration management during construction and verifications of a licensee transparency of pending licensing basis changes. in support of NRCs continuing conformance with the AEA, and the inspection activities. If and when the licensee determines that corrective actions for Commissions regulations.
nonconformances require an LAR, the licensee should stop the work that requires prior NRC approval and submit the required LAR without delay.
A licensee may continue with construction activities to resolve emergent the Construction activities progress nonconforming conditions by repair or a use-as-is determination, based on an toward constructing the facility as approved engineering solution and an assessment of its impact on the licensing basis specified in the current licensing
- provided this assessment does not determine that an LAR is required the basis. When the licensee changes determination that prior NRC approval is not required. This work is considered at-risk the current licensing basis and because it is performed in parallel with any required change to the licensing basis, determines that prior NRC approval including completion and documentation of the change/departure review. If at any is not required for the change, point it is determined that a proposed change/departure requires prior NRC approval, construction continues towards the, the licensee must submit an LAR. If a required LAR is ultimately denied by the NRC, then changed, new current the licensee must return the facility to its current licensing basis. licensing basis. There is no exception for emergent Until the change/departure review is completed and documented, licensees should conditions.
not perform any irreversible/unrecoverable work. Examples of irreversible/unrecoverable work include covering or blocking SSCs such that they cannot be accessed or inspected, or any activity that would preclude returning the facility to its CLB.
If the licensee wishes to proceed with work that is the subject of an LAR, it should first request and receive a Preliminary Amendment Request (PAR) Notification of No Objection from the NRC as discussed Section 4.7.1.1.
7
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 15 Section 4.3.5 Changes to Operational Requirements Page C-40 In accordance with Section VI.C of the design certification rules, operational Clarifying the applicability of requirements in the generic DCD do not have finality.Section VIII.C of the design Section VIII.C to ISI and IST certification rules discusses the processes for changes and departures to operational programs.
requirements. As specified in Section VIII.C.4 of the design certification rules, if a COL applicant departs from the operational requirements specified in the DCD, the applicant must request an exemption in accordance with 10 CFR 52.7. However, the Section VIII.C processes only apply to specific operational requirements that were completely reviewed and approved in the design certification rulemaking (72 FR at 49365). For example, the Section VIII.C processes do not apply to the NRCs acceptance of portions of the inservice testing (IST) and inservice inspection (ISI) operational programs in the review of a design certification application because these portions of the operational programs were not completely reviewed and approved.
The Tier 2 portion of a generic DCD includes information considered as other operational requirements which are addressed for COL applicants in Section VIII.C of the design certification rules. The NRC will approve plant-specific operational requirements as part of the COL proceeding. Therefore, after issuance of a COL, the operational requirements in the generic DCD are not applicable to that licensee, except to the extent that the FSAR incorporates by reference those operational requirements. Changes to operational requirements in an FSAR are governed by 10 Use 50.55a for Code and CFR 50.59 or 10 CFR 50.55a, whether or not the FSAR has incorporated by Standards Operational reference the operational requirements from the generic DCD. Requirements.
Examples: 10 CFR Part 52 Appendices,Section VIII.C.6.
- A change to the plant-specific Technical Specifications requires a license Specifically identify changes to the amendment under 10 CFR 50.90. TS as requiring a license amendment request.
- The DCD states that in-service testing (IST) will be performed in accordance with a specific edition and addendum of the ASME Code. The COL applicant 8
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) desires to use a subsequently issued code case for IST that has been Remove example pertaining to endorsed by the NRC. Such a change constitutes a departure from an applicants.
operational requirement in the DCD. As a result, the COL applicant must request an exemption from the DCD to use the code case.
- The DCD Tier 2 states that IST will be performed in accordance with a specific Modified examples to identify the edition and addendum addenda of the ASME OM Code. The UFSAR application of 10 CFR 50.55a.
incorporates by reference this particular provision from the DCD. The NRC regulations in 10 CFR 50.55a(f)(4)(i) require that the ISTs that are conducted Second example is an operational by a COL holder during the initial 120-month interval to verify the operational requirement change required by readiness of pumps and valves, whose function is required for safety, must the regulations.
comply with the requirements in the latest edition and addenda of the Code incorporated by reference in 10 CFR 50.55a(b) (or the optional ASME Code cases listed in RG 1.192 that is incorporated by reference in 10 CFR 50.55a(b)), on the date 12 months before the date scheduled for initial fuel loading, subject to the limitations and modifications listed in 10 CFR 50.55a(b).
Regulatory Guide (RG) 1.192, Operation and Maintenance of Code Case Acceptability, ASME OM Code, is incorporated by reference in 10 CFR 50.55a identifying the most current set of NRC-approved ASME OM Code Cases with any applicable conditions. The change need not be evaluated in accordance with 10 CFR 50.59.
- After issuance of the COL, the If a COL holder desires to use a subsequently Third example is an operational issued edition and addenda to the ASME OM Code that is incorporated by requirement change desired by the reference in 10 CFR 50.55a, the COL holder may submit a letter to the NRC licensee.
requesting approval to use that later edition or addenda to the OM Code pursuant to 10 CFR 50.55a(f)(4)(iv). In addition, a COL holder may implement an ASME code case for IST that has been endorsed by the NRC in RG 1.192 that has been incorporated by reference in 10 CFR 50.55a without submitting an alternative request provided all conditions in RG 1.192 are implemented.
Such a change constitutes a change to an operational requirement in the UFSAR, and must be evaluated in accordance with 10 CFR 50.59. The change need not be evaluated in accordance with 10 CFR 50.59. Additional information on the use of later editions and addenda of the ASME Code for preservice and inservice testing programs (as well as ISI programs) is discussed in Revision 1 to RIS 2012-08, Developing Inservice Testing and 9
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304)
Inservice Inspection Programs under 10 CFR Part 52.
16 Section 4.3.2 Evaluation of Changes to Plant-Specific Facilities or Procedures Described in the UFSAR Delete as updated These are extraneous words.
Page C-38 The 10 CFR 50.59 evaluation process and guidance contained in the main body of NEI 96-07, Revision 1, is applicable to changes to plant-specific facilities or procedures described in the UFSAR outside the scope of the plant-specific DCD, except as updated as identified in Section 4.4.2.2 of this appendix 17 Section 4.4.2.2 Evaluation of Departures from Tier 2 Information That Do Not Affect Ex-Vessel Severe Accident Criteria The proposed edit is to conform to the NEI 96-07 textual description Page C-48 graphic because the do not exceed language in the preceding NEI 96-Change the symbol between proposed value and SRP guideline value from < 07 text would imply less than or (less than) to < (less than or equal to) equal to the SRP guideline value.
18 Section 4.4.2.3 Evaluation of Departures from Tier 2 Information That Affect Ex-Vessel Severe Accident Criteria Delete superfluous the.
Page C-50, last paragraph Severe accident mitigation features are design specific and are discussed primarily in the Chapter 19 of the DCD. However, EVSA features may be described elsewhere in the DCD, and the location of the EVSA design 19 Section 4.4.3.1 Changes to Probabilistic Risk Assessment (PRA) Information Page C-59 Tier 2 is defined in Section 3.23 to include, among other things, the PRA summary information required by 10 CFR 52.47(a). A description of the design-specific PRA 10
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) and its results is Tier 2 information contained in Chapter 19 of the UFSAR as required by 52.47(a)(27) and 52.79(d)(1). A change to either the description of the PRA or its results is a departure from Tier 2 information, requiring a Section VIII.B.5 review to Include the evaluation for changes determine if prior NRC approval is required; however, such departures will screen out to ex-vessel severe accident of further review because they will not meet the eight criteria of Section VIII.B.5.b or design features.
the two criteria of Section VIII.B.5.c. Thus, as a general matter, the VIII.B.5 review conclusion for departures from either the description of the PRA or its results will be Agree that further evaluation is not that no prior NRC approval is required. required; however a generic evaluation must be included in the
[Include, at this location, a generic evaluation for a departure from either the guidance document to demonstrate description of the PRA or its results to substantiate that the eight criteria of Section why further 50.59 screenings and VIII.B.5.b and the two criteria of Section VIII.B.5.c will not require prior NRC approval.Section VIII.B.5 evaluations are not This generic evaluation is necessary to support the conclusion carried throughout the required.
remainder of this section that the simplified evaluation is not required for the departure from either the description of the PRA or its results. Also explain that the Section VIII.B.5 evaluation shows that no license amendment is required by 10 CFR 50.59.] PRA models include both design basis and beyond design basis Changes to the description and results of the PRA as provided in Chapter 19 of the events. However, a generic UFSAR are not subject to 10 CFR 50.59. This is because 10 CFR 50.59 controls evaluation can show that no changes within the plants design basis, while the PRA models beyond design basis license amendment is required events. under 10 CFR 50.59.
The plant-specific PRA itself is subject to maintenance and upgrade requirements specified in 10 CFR 50.71(h). The initial PRA required by 50.71(h) PRA must be Clarification of which PRA is being developed prior by the scheduled date of to the initial fuel load. Changes in discussed.
accordance with 10 CFR 50.71(h) are not considered departures as these activities are specifically directed by rule. Therefore, the development of the PRA under 10 CFR 50.71(h)(1) and the maintenance and upgrade of this PRA throughout the life of the plant are not subject to the Section VIII departure process. While guidance on PRA maintenance and upgrade is outside the scope of this appendix, changes to the PRA information are governed by the processes discussed below:
11
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 20 Section 4.4.3.1 Changes to Probabilistic Risk Assessment (PRA) Information Page 60 It is beyond the scope of this appendix to provide detailed guidance for PRA changes for a COL application that references a design certification. Suffice it to state, a COL Not a valid conclusion for an applicant does not need to update the PRA information in the DCD to account for applicants departures from the relatively minor changes; SRP 19.0 provides NRC staff reviewer guidance on the DCD.
content of the PRA summary information in the FSAR.
21 Section 4.4.3.1 Changes to Probabilistic Risk Assessment (PRA) Information Page C-61 As indicated by the structure of required by 10 CFR 50.71(h), the development of a The UFSAR should reflect the PRA meeting RG 1.200, which endorses consensus standards on PRA, is due by current plant design when updated initial prior to fuel load. The requirements for maintenance and periodic upgrades of as required by 10 CFR 50.71(e).
the PRA apply after the initial RG 1.200 PRA is developed prior to fuel load. During The licensee can update the FSAR construction, a licensee is not required to maintain or upgrade the PRA provided in the to reflect current plant information, COL application, but it is recommended that licensees maintain the PRA as necessary including discussion about design to support other programs (e.g., reliability assurance program). Licensees may also change impacts on the PRA wish find it beneficial to update the plant-specific PRA to reflect significant design summary in chapter 19 without changes during construction. PRA maintenance includes updating the PRA model to performing PRA maintenance or reflect plant changes, such as modifications or procedure changes, while PRA upgrade.
upgrade includes incorporating into the PRA model a new methodology or significant changes in scope or capability such as human error analysis methodology or new treatment of common cause failures. However, the licensee must still satisfy the While not required by regulation, a requirements of 10 CFR 50.71(e) to update the FSAR annually. In particular, if If there method of tracking and compiling are changes to the PRA summary or results presented in Chapter 19 of the UFSAR, plant changes that impact the the licensee is required to should provide updates to update the FSAR, as plant-specific PRA may facilitate appropriate, in accordance with 10 CFR 50.71(e). In scenarios where design changes the completion of the 10 CFR or departures may impact or change the PRA information in FSAR Chapter 19, the 50.71(h) PRA that is required by licensee needs to update the FSAR accordingly. One way for a licensee to comply the initial fuel load.
with 10 CFR 50.71(e) is to discuss the impact of the design changes or departures on the PRA information in FSAR Chapter 19. For example, if a methodology, SSC attribute, operator action or procedure in Chapter 19 is affected by a design change or 12
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) departure, the licensee would discuss this in Chapter 19 of the updated FSAR.
As stated discussed in the SOC, the NRC intends that PRA maintenance and upgrades be consistent with the guidance for those processes in PRA standards endorsed by RG 1.200 American Society of Mechanical Engineers (ASME) Standard for Probabilistic Risk Assessment for Nuclear Power Plant Applications (ASME-RA-Sb-2005). In particular, the SOC state:
22 Section 4.4.3.1 Changes to Probabilistic Risk Assessment (PRA) Information Page C-62 and 63 In addition, the periodic updates to Chapter 19 of the FSAR should account for the following types of changes related to the PRA updates:
- Changes to the PRA models and methodologies as described in Chapter 19.
- A description of any new PRA models and methodologies needed to comply with 10 CFR 50.71(h), including a description of the results. Change to reflect the language in 10 CFR 52.47(a)(27) and A licensee is not required to seek NRC approval for changes to the PRA information 52.79(a)(46).
in Chapter 19. As a result, a licensee does not need to perform screening or prepare and evaluation per 10 CFR 50.59 or Section VIII.B.5 of the design certification rules for changes in the PRA information in Chapter 19. However, any changes to the PRA information in Chapter 19 should be reported to the NRC in accordance with 10 CFR 50.71(e).
To the extent that changes in the PRA information are attributable to changes in design or procedures, described elsewhere within the DCD or FSAR, the applicable The DCD is the plant-specific DCD change process should be followed for such changes/departures (including, as and the plant-specific DCD is part necessary, requesting NRC approval for the change). As a general matter, it is of the FSAR.
expected that any change that significantly impacts the results of the PRA (e.g., a significant design change) would be subject to the other change control processes discussed in Section 4.4.2 above. For example, Tier 1 of the plant-specific DCD Clarify which DCD.
typically includes information regarding risk-significant systems, structures, and 13
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) components (SSC). Any departure from such information would require an exemption from Tier 1 and would therefore be subject to NRC review and approval.
Similarly, departures from Tier 2 of the plant-specific DCD that result in substantial increases in the probability or consequences of design basis accidents or ex-vessel severe accidents would require NRC approval per Section VIII.B.5 of the design certification rules. Consequently, while NRC approval is not directly required for changes to the PRA information in Chapter 19, NRC approval would likely be required for departures from other portions of the plant-specific DCD that have a significant impact on the results of the PRA.
23 Section 4.4.3.2 Changes to Other Severe Accident Information Add necessary parenthesis.
Page C-66 first bullet
- Needs to assess the departure against Criterion 1 in Section VIII.B.5.c of the design certification rule, because the ADS is used to eliminate (i.e., make not credible) a particular ex-vessel severe accident (direct containment heating (DCH));
14
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 24 Section 4.4.3.1 Changes to Probabilistic Risk Assessment (PRA) Information Page C-63 Examples 1)
Changes during Construction - Early during construction, the licensee decides to make a number of plant modifications to enable it eventually to request a power uprate. The modifications affect a number of chapters of the FSAR, including the PRA information in Chapter 19. The licensee:
o must review the modifications in accordance with the change processes Reordered bullets to reflect the described in Sections 4.1 and 4.4.2 and update the FSAR, as necessary, at expected sequence of events.
the next regulatory scheduled interval; and Proposed an acceptable method of o may defer any changes to the PRA information in Chapter 19 pending updating FSAR Chapter 19 PRA development of the PRA upgrade required by 10 CFR 50.71(h)(1). However, information.
the licensee must update its FSAR, including Chapter 19, at the next regularly scheduled interval to reflect the modification. The licensee may describe the results of a PRA screening and/or the impact on the PRA information in Chapter 19; and o must review the modifications in accordance with the change processes described in Sections 4.1 and 4.4.2 and update the FSAR, as necessary, at the next regulatory scheduled interval.
Page C-63 Examples 2)
Use of NRC-Endorsed Consensus Standard - The plant-specific DCD for a plant uses Consider modifying example from a seismic margins low power and shutdown conditions (LPSD) analysis rather than a seismic margin analysis to low seismic LPSD PRA. After issuance of the COL but more than one year prior to fuel power and shutdown conditions load, the NRC endorses a consensus standard for a seismic LPSD PRA. The analysis as the seismic PRA licensee: standard is now available.
o must upgrade its PRA to use the NRC-endorsed consensus standard within the time frames provided in 10 CFR 50.71(h), and should make the PRA available for inspection or review by the NRC staff upon request, but does not need to seek NRC approval for the upgrade; and o following the PRA upgrade, must update its FSAR at the next regularly scheduled interval to replace the discussion of the seismic margins LPSD analysis with a description of the seismic LPSD PRA and the results of the seismic LPSD PRA, including an identification of any risk insights.
15
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 25 Section 4.6 Changes to Early Site Permits The exception for Typographic Page C-68, first paragraph and administrative corrections applies to the SSAR but not to the As described in 10 CFR 52.39(e), the holder of an early site permit may not make ESP since the ESP is a license and changes to the ESP, including the Site Safety Analysis Report (SSAR), without prior any changes to a license require Commission approval, with the exception of other than typographic and NRC approval.
administrative corrections to the SSAR (see 72 FR 49360, Aug. 28, 2007). without prior Commission approval.
26 Section 4.7.1 Evaluations performed during construction (before the 10 CFR 52.103(g) finding) Clarification of when construction activities may proceed in Page C-69 accordance with proposed changes to the licensing basis.
Licensees must comply with applicable change processes in accordance with Section 52.98 (e.g., 10 CFR 50.59, 50.54, design certification, etc.), including the requirements governing submittal of LARs and exemption requests when necessary.
Changes during construction Licensing basis changes that require prior NRC approval may not be implemented constructed until after the required LARs/exemptions are approved by the NRC or a PAR No Objection Letter is received.
Because SSCs are not considered in service during construction, and technical Clarification of the definition of specifications are not in effect until after the 10 CFR 52.103(g) finding, additional implemented in the context of the criteria are needed for determining when a change is implemented during the current licensing basis.
construction phase. During both construction and operation, the emphasis is on when SSCs can provide their intended function. During construction, a change or departure is considered implemented when the change is credited in the current licensing basis of the plant. an ITAAC closure notification (ICN) for the affected SSC is submitted under 10 CFR 52.99 (e.g., after the change/departure is installed and tested). NRC approval of ITAAC related LAR/exemption requests is required before the ITAAC closure notification for affected ITAAC are submitted.
LARs that do not involve ITAAC construction would need to be approved before associated Technical Specification (if any) become applicable, the implementation 16
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) date of the program, or the ITAAC ICN is submitted.
27 Section 4.7.1.1 Preliminary Amendment Request During Construction Page C-71 The primary purpose of the PAR is to maintain licensing basis configuration control Clarify document title.
and avoid unnecessary construction delays related to changes during construction arising after the issuance of the COL and before the 10 CFR 52.103(g) finding. This process will enable the NRC to assess and ensure that inspectability of SSCs affected by the proposed change and adjust its inspection activities as necessary.
Based on the information provided in the licensees PAR, the NRC may issue the licensee a PAR Notice No Objection Letter stating that the NRC has no objection to the licensee proceeding at its own risk with installation and testing of the proposed plant change pending the outcome of the NRCs technical review of the licensee amendment/exemption request.
28 Section 4.7.1.1 Preliminary Amendment Request During Construction Early and frequent verbal Page C-76 communications are important, however it cannot replace a written PARs should be submitted in writing in accordance with 10 CFR 52.3. Less formal record.
(e.g. verbal) communications may precede proceed and/or supplement the required written submittal; this type of interaction may be especially important for Replace proceed with precede.
communicating emergent situations.
29 Section 4.7.1.1 Preliminary Amendment Request During Construction ISG-025 revision 0A relies upon Page C-76 the related License Amendment Request to provide these two A licensees PAR should contain the following information: pieces of information for NRC 4 Preliminary assessment of whether or not the proposed change involves no review.
significant hazards consideration 5 Preliminary assessment of whether or not the proposed change qualifies for exclusion from environmental review 17
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) 6 Renumber to 4 7 Renumber to 5 30 Section 4.7.1.1 Preliminary Amendment Request During Construction Revise template for Page C-77 ISG-025 revision 0A.
A template for submittal of PAR requests by licensees is provided at the end of this section. PAR requests should be submitted to the Office of New Reactors in accordance with COL-ISG-025.
31 Section 5.2 RECORDS AND REPORTING FOR CHANGES SUBJECT TO 10 CFR 50.59 Comment to correctly constrain the applicability of 10 CFR 50.59(d)(2).
Page C-81, First paragraph The Part 50 processes are applicable from the issuance of the Per 10 CFR 50.59(d)(2), for combined licenses, the report must be submitted at license until the license is intervals not to exceed 6 months during the period from the date of application for a rescinded.
combined license to the date the Commission makes its findings under 10 CFR 52.103(g). Since 10 CFR 50.59(d)(2) only applies to licensees, the effective application of this requirement is only from issuance of the combined license until the 10 CFR 52.103(g) finding.
32 Section 5.3 RECORDS AND REPORTING FOR CHANGES SUBJECT TO A DESIGN CERTIFICATION RULE Editorial correction.
Page C-81, Last paragraph Documenting Change Process Evaluations The guidance provided in Section 5.0 of the main body of NEI 96-07, Revision 1, for documenting a 10 CFR 50.59 evaluation of a proposed activity is similarly applicable for plant-specific departures under Section VIII of the design certification rule appendices including Tier 2 changes under Section VIII.B.5.b, ex-vessel severe 18
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) accident changes under Section VIII.B.5.c and aircraft impact assessment changes under 10 CFR 50.150(c) and Section VIII.B.5.d, when applicable.
33 Section 5.3 RECORDS AND REPORTING FOR CHANGES SUBJECT TO A DESIGN CERTIFICATION RULE Page C-82, lettered list
- a. On the date that an application for a license referencing a design certification rule Clarification of change type appendix is submitted, the application must include the VIII.B.5 summary report and any updates to generic changes to, or plant-specific departures from, the generic DCD.
34 Section 5.3 RECORDS AND REPORTING FOR CHANGES SUBJECT TO A DESIGN CERTIFICATION RULE Section 1.2.3 of this Appendix Page C-82, last paragraph provides guidance for updating the UFSAR, however neither Section As discussed in Section 1.2.3 of this appendix, licensees may apply the UFSAR 1.2.3 of this appendix nor NEI 98-update guidance in NEI 98-03, Revision 1, to information outside the scope of the 03 provides guidance for reporting plant-specific DCD. Such modifications should be reported to NRC in accordance requirements for the UFSAR for with NEI 98-03, Revision 110 CFR 50.71(e)(3)(iii) prior to the Part 52.103(g) finding Part 52 plants.
and 10 CFR 50.71(e)(4) thereafter. In addition to Section VIII.B.5 reviews, NEI 98-03, Revision 1, guidance may be considered when a departure from information in As the NRC staff explained in its the plant-specific DCD involves removal, reformatting and simplification of August 31, 2012 comments on NEI information, as appropriate. 96-07, Appendix C, Revision 0C, The guidance in NEI 98-03 relative to FSAR updates may be appropriate for the site-specific information in FSARs for Part 52 licensees but the guidance is not appropriate for the plant-specific DCD information in these FSARs.
By deliberately including different 19
NRC Staff Comments NEI 96-07 Appendix C, Revision 0D (ADAMS Accession No. ML13010A304) changes process for Part 52 plants (i.e.,Section VIII for COLs referencing DCDs vs. 50.59) the NRC sought to achieve a higher level of control of the design information associated with certified standard designs in order to preserve standardization. This level of control carries forward to the updating of information in the FSAR and the guidance in NEI 98-03 does not reflect this unique type of design control treatment. This NRC staff comment applies to NEI 98-03, Revision 1, guidance on removing, reformatting, and simplifying information, and NEI has given no regulatory basis for why a licensee may be permitted to remove, reformat, or simplify Tier 2 information without NRC approval.
20