Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000254/FIN-2000008-01 | Corrective Action for Delinquent ASME Code Work Packages | ||
05000254/FIN-2000008-02 | N/A | ||
05000254/FIN-2000016-03 | Technical Errors in Appendix R Safe Shutdown Procedures | Safe Shutdown | |
05000254/FIN-2000016-04 | Associated Circuits Issue. Single spurious operation, including effect of automatic depressurization system failures on the time line. | Safe Shutdown | |
05000254/FIN-2006014-01 | Failure to Establish Measures to Ensure That the Unit 1 ERV Actuators Remained Suitable for Operation While Operating at EPU Power Levels | ||
05000254/FIN-2007003-01 | Aerosol Can Found in Cable Spreading Room | ||
05000254/FIN-2007003-02 | Implementation of External Flooding Methodology | ||
05000254/FIN-2007003-03 | Failure to Complete Qualified Reactor Vessel Shell Welds | ||
05000254/FIN-2007003-06 | Review of Unit 1 4 kV Breaker Failures | ||
05000254/FIN-2007003-09 | Licensee-Identified Violation | Substantial potential for overexposure | |
05000254/FIN-2007004-02 | Review of Ultimate Heat Sink Surveillance Requirements and Emergency Action Levels | Ultimate heat sink | |
05000254/FIN-2007008-01 | Inadequate 10 CFR 50.59 Evaluations for the Main Steam Line Tunnel High Temperature Instrumentation and the Electrohydraulic Control System Pressure Regulator | ||
05000254/FIN-2008002-01 | Risk Assessment of Reactor Core Isolation Cooling Flow Controller Failure | ||
05000254/FIN-2008002-02 | Safe Shutdown Makeup Pump Low Discharge Pressure | Safe Shutdown | |
05000254/FIN-2008002-03 | Unit 2 Isolation of Reactor Building Ventilation and Auto Start of Standby Gas Treatment | ||
05000254/FIN-2008002-04 | 1/2 \"A\" Diesel Fire Pump Oil Leak and Fire | Fire Protection Program | |
05000254/FIN-2008002-05 | Licensee-Identified Violation | ||
05000254/FIN-2008002-06 | Licensee-Identified Violation | ||
05000254/FIN-2008003-01 | Unit 2 Restart of 2A Recirculation Pump in Mode 1 | ||
05000254/FIN-2008003-02 | Units 1 and 2 Response to Earthquake on April 18, 2008 | Earthquake | |
05000254/FIN-2008003-03 | Licensee-Identified Violation | ||
05000254/FIN-2008004-01 | 2D Vault Door Work Order Instructions Not Followed | Significance Determination Process | |
05000254/FIN-2008004-02 | Inadvertent Initiation of the Unit 1 Feedwater Regulating Vavle Fire Protection Deluge | ||
05000254/FIN-2008004-03 | Licensee Failure to Adequately Assess and Manage Risk Associated with work on U1 SBO | Significance Determination Process Incremental Core Damage Probability Deficit | |
05000254/FIN-2008005-01 | Failure to Remove FME Device | Foreign Material Exclusion | |
05000254/FIN-2008005-02 | Explosion of the FDSgT Vestibule | ||
05000254/FIN-2008005-03 | Licensee-Identified Violation | Commercial Grade Dedication | |
05000254/FIN-2008007-01 | Use of Non-Conservative Inputs and Methodologies in Calculating Terminal Voltages to Safety-Related MOV Motors During Design Basis Events. | ||
05000254/FIN-2008007-02 | Inadeequate Calculations/Analyses and Testing for Thermal Overload Relays (TOLs) on Safety-Related MOVs. | ||
05000254/FIN-2008007-03 | Seismic Qualification of 250 VDC Batteries | ||
05000254/FIN-2008007-04 | Inaccurate RCIC Instrument Setpoints. | ||
05000254/FIN-2009002-01 | Broken latch on Fire Door 145 | Fire Barrier Fire impairment Significance Determination Process | |
05000254/FIN-2009002-02 | Failure to Follow Work Instructions for 2A Core Spray Check Valve | ||
05000254/FIN-2009002-03 | Unit 1F Drywell Cooler Improper Restoration From Maintenance | ||
05000254/FIN-2009002-04 | Failure to Comply With Technical Specification And Radiation Work Permit Requirements During Work In A Locked High Radiation Area | High Radiation Area Locked High Radiation Area Substantial potential for overexposure | |
05000254/FIN-2009002-05 | Failure of the Unit 2 Emergency Diesel Generator Cooling Water Pump | ||
05000254/FIN-2009002-06 | Licensee-Identified Violation | ||
05000254/FIN-2009003-01 | Inadequate Procedural Adherence During Unit 1 TIP PM Testing | ||
05000254/FIN-2009003-02 | Inadequate Procedural Guidance for Shutdown After Operating Basis Earthquake | Operating Basis Earthquake Earthquake | |
05000254/FIN-2009003-03 | 1/2 EDGCWP Failed to Swap Feeds | ||
05000254/FIN-2009003-04 | Trip of Unit 2 Fuel Pool Cooling Water Pumps During Scorpion Platform Removal | ||
05000254/FIN-2009004-01 | Failure of Licensee to Properly Translate TS OPERABLE-OPERABILITY | Safe Shutdown Internal Flooding | |
05000254/FIN-2009004-02 | Adequacy of 10 CFR 50.59 Evaluation and Dose Consequence Assessment for Catastrophic Fire in the Interim Radwaste Storage Facility | ||
05000254/FIN-2009004-03 | Inop RCIC Primary Containment Isolation Valves | Nondestructive Examination | |
05000254/FIN-2009005-01 | Changes to EAL HU6 Potentially Decrease the Effectiveness of the Plans without Prior NRC Approval | ||
05000254/FIN-2009005-02 | Darley Pump Leaking Gasoline from the Fuel Pump | Significance Determination Process | |
05000254/FIN-2009005-03 | Temperature Indicating Probe Found Broken in the Unit 2 Diesel Generator Coolant System | ||
05000254/FIN-2009005-04 | Failure of RHR Torus Spray Isolation Valve to Open Due to Declutch Mechanism Problems | Significance Determination Process | |
05000254/FIN-2009005-05 | Licensee-Identified Violation | Grab sample Offsite Dose Calculation Manual | |
05000254/FIN-2009006-01 | Failure to Evaluate Lack of Water Spray System Piping |