Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML14217A338 | 6 August 2014 | Arkansas Nuclear | Project Manager Assignment to Andrea E. George Effective August 10, 2014 |
ML14217A343 | 6 August 2014 | Diablo Canyon | Project Manager Assignment to Balwant K. Singal Effective August 10, 2014 |
ML14234A451 | 4 September 2014 | Callaway | Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval |
ML14239A097 | 4 September 2014 | Callaway | Request for Relief I3R-15, ASME Code Class 1 Pressure-Retaining Piping/Components Leakage Testing at Full Pressure, Third 10-Year Inservice Inspection Interval |
ML14251A468 | 16 September 2014 | Diablo Canyon | Relief Request NDE-SFW-13, ASME Code Section XI, Request for Alternative to Allow Use of Alternate Examination Requirements, Third 10-Year Inservice Inspection Interval |
ML14295A733 | 17 November 2014 | Diablo Canyon | 9/24/14 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 |
ML14297A490 | 24 October 2014 | Cooper | NRR E-mail Capture - Info: Acceptance Review of Cooper Nuclear Station License Amendment Request Regarding Deletion of Condensate Storage Tank as Alternate Source of Makeup Water |
ML14309A156 | 12 November 2014 | Diablo Canyon | Request for Withholding Information from Public Disclosure - 7/29/2014 Affidavit Executed by James Gresham, Westinghouse SFAD-14-79, Attachment 1 |
ML14321A864 | 10 December 2014 | Wolf Creek | Relief Requests 13R-08, Reactor Pressure Vessel (RPV) Interior Attachments and 13R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval |
ML14323A599 | 2 December 2014 | Fort Calhoun | Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage |
ML14330A207 | 23 December 2014 | Arkansas Nuclear | Relief Request ANO1-ISI-024, Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1, Fourth 10-year Inservice Inspection Interval |
ML14337A449 | 9 December 2014 | Columbia | Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the Fourth 10-Year Inservice Testing Interval (TAC MF3847-MF3849, MF3851-MF3858) |
ML14343A533 | 9 December 2014 | Diablo Canyon | LTR-14-0393-1 - Jack Wada Ltr. Shutdown of the Diablo Canyon Power Plant |
ML15006A012 | 7 January 2015 | South Texas | Project Manager Assignment to Lisa M. Regner Effective 1/11/2015 |
ML15023A220 | 28 January 2015 | Wolf Creek | Relief Request 13R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220 for the Third 10-Year Inservice Inspection Interval |
ML15030A232 | 9 February 2015 | Columbia | Correction to 10 CFR 50.55a Citation and Administrative Changes - Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the 4th 10-Year Inservice Testing Interval |
ML15035A148 | 10 February 2015 | Callaway | Relief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year Interval |
ML15036A220 | 13 February 2015 | Columbia | Relief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection Interval |
ML15037A005 | 13 February 2015 | Columbia | Relief Request 3ISI-15 - Reactor Pressure Vessel Head Flange Leak-off Line, for the Third 10-Year Inservice Inspection Interval |
ML15040A020 | 12 February 2015 | Wolf Creek | Relief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code, Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval |
ML15089A155 | 25 March 2015 | Diablo Canyon | NRR E-mail Capture - Diablo Units 1 and 2 - (Round 2) Requests for Additional Information (Rais) for License Amendment Request 14-01 Associated with Revision to TS 3.8.1, AC Sources - Operating |
ML16098A530 | 14 April 2016 | North Anna | Audit Plan - Application for Amendment North Anna Power Station, Units 1 and 2. the Proposed License Amendment Revises the Issues Identified in Westinghouse Documents NSAL-09-5, Rev 1 and NSAL-15-1 |
ML16344A219 | 12 December 2016 | Limerick | Safety Evaluation for Limerick, Units 1 and 2, Proposed License Amendment to Revise the Technical Specifications to Address the High-Pressure Coolant Injection Operability Requirement Under Low Reactor Pressure Conditions |
ML17004A295 | 5 January 2017 | Perry | Safety Evaluation Report- Application for Amendment Perry Nuclear Power Plant |
ML17319A503 | 27 November 2017 | River Bend | Summary of the License Renewal Environmental Audit |
ML17324A506 | 6 December 2017 | River Bend | Summary of the License Renewal Application Review Severe Accident Mitigation Alternatives Site Audit |
ML17333A077 | 7 November 2017 | PROJ0694 | Infogram 14-1 November 7, 2017 Meeting |
ML17360A054 | 25 April 2018 | Turkey Point | Subsequent License Renewal Application Online Reference Portal |
ML18038A691 | 3 April 2018 | Turkey Point | Request for Withholding Information from Public Disclosure |
ML18087A433 | 20 April 2018 | Turkey Point | Change in Determination for Withholding Information from Public Disclosure |
ML18093A117 | 17 April 2018 | Diablo Canyon | Request for Withdrawal FRN |
ML18094A902 | 4 June 2018 | Indian Point | Letter to the Environmental Protection Agency Announcing the Issuance of Supplement 2 of the Final Supplemental Environmental Impact Statement for the Renewal of Licenses for Indian Point Generating Unit Nos. 2 and 3 |
ML18096B397 | 16 May 2018 | Indian Point | Federal Register Notice for Issuance of Supplement 2 to the Indian Point Final Environmental Impact Statement for License Renewal |
ML18109A517 | 16 May 2018 | Turkey Point | Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement for the Turkey Point SLR |
ML18127A116 | 17 May 2018 | Seabrook | Project Manager Change for the License Renewal of Seabrook Station, Unit 1 |
ML18131A016 | 4 June 2018 | River Bend | Notice of Availability of the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1 |
ML18131A097 | 4 June 2018 | River Bend | Notice of Availability of the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1 |
ML18155A580 | 28 November 2018 | Waterford | Issuance of Scoping Summary Report Associated with License Renewal Application Environmental Review (CAC No. MF7493; EPID No. L-2016-LNE-0001) |
ML18165A140 | 16 August 2018 | Waterford | Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3 |
ML18165A399 | 20 August 2018 | Waterford | FRN Draft SEIS Availability |
ML18165A424 | 16 August 2018 | Waterford | Notice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford |
ML18198A273 | 7 August 2018 | NRC Presentation on Subsequent License Renewal at 2018 ANS-Utility Working Conference | |
ML18214A383 | 5 September 2018 | Peach Bottom | Subsequent License Renewal Application Online Reference Portal |
ML18232A438 | 10 September 2018 | Peach Bottom | Letter - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Peach Bottom Atomic Power Station, Units 2 and 3 |
ML18232A439 | 4 September 2018 | Peach Bottom | Federal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Peach Bottom Atomic Power Station, Units 2 and 3 |
ML18233A182 | 23 August 2018 | River Bend | License Renewal Application Review Updated Budget Estimate and Status Letter (CAC Nos. MF9747 and MF9778) |
ML18257A038 | 23 November 2018 | Waterford | Communications Plan Regarding the Renewal of the Waterford Steam Electric Station, Unit 3, Renewed Operating License |
ML18261A214 | 22 October 2018 | River Bend | Response to Comments on the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1 |
ML18270A380 | 27 September 2018 | Seabrook | Project Manager Change for the License Renewal of Seabrook Station Unit 1, License Renewal Application |
ML18296A643 | 8 November 2018 | River Bend | Notice of Availability of the Final Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1 |