Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateSiteTitle
ML14217A3386 August 2014Arkansas NuclearProject Manager Assignment to Andrea E. George Effective August 10, 2014
ML14217A3436 August 2014Diablo CanyonProject Manager Assignment to Balwant K. Singal Effective August 10, 2014
ML14234A4514 September 2014CallawayRelief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval
ML14239A0974 September 2014CallawayRequest for Relief I3R-15, ASME Code Class 1 Pressure-Retaining Piping/Components Leakage Testing at Full Pressure, Third 10-Year Inservice Inspection Interval
ML14251A46816 September 2014Diablo CanyonRelief Request NDE-SFW-13, ASME Code Section XI, Request for Alternative to Allow Use of Alternate Examination Requirements, Third 10-Year Inservice Inspection Interval
ML14295A73317 November 2014Diablo Canyon9/24/14 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2
ML14297A49024 October 2014CooperNRR E-mail Capture - Info: Acceptance Review of Cooper Nuclear Station License Amendment Request Regarding Deletion of Condensate Storage Tank as Alternate Source of Makeup Water
ML14309A15612 November 2014Diablo CanyonRequest for Withholding Information from Public Disclosure - 7/29/2014 Affidavit Executed by James Gresham, Westinghouse SFAD-14-79, Attachment 1
ML14321A86410 December 2014Wolf CreekRelief Requests 13R-08, Reactor Pressure Vessel (RPV) Interior Attachments and 13R-09, RPV Pressure-Retaining Welds, Exam Interval Extensions, Third 10-year Inservice Inspection Interval
ML14323A5992 December 2014Fort CalhounRelief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage
ML14330A20723 December 2014Arkansas NuclearRelief Request ANO1-ISI-024, Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1, Fourth 10-year Inservice Inspection Interval
ML14337A4499 December 2014ColumbiaRelief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the Fourth 10-Year Inservice Testing Interval (TAC MF3847-MF3849, MF3851-MF3858)
ML14343A5339 December 2014Diablo CanyonLTR-14-0393-1 - Jack Wada Ltr. Shutdown of the Diablo Canyon Power Plant
ML15006A0127 January 2015South TexasProject Manager Assignment to Lisa M. Regner Effective 1/11/2015
ML15023A22028 January 2015Wolf CreekRelief Request 13R-11, Alternative from Pressure Test Requirements of ASME Code Section XI IWC-5220 for the Third 10-Year Inservice Inspection Interval
ML15030A2329 February 2015ColumbiaCorrection to 10 CFR 50.55a Citation and Administrative Changes - Relief Request Nos. RV-03, RV-02, RV-01, RP-06, RP-05, RP-04, RP-03, PV-04, RP-02, RP-01, RG-01, for the 4th 10-Year Inservice Testing Interval
ML15035A14810 February 2015CallawayRelief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year Interval
ML15036A22013 February 2015ColumbiaRelief Request 3ISI-14 - Use of Code Case N-702 for Nozzle-Vessel Weld and Inner Radius Exams for the Third 10-Year Inservice Inspection Interval
ML15037A00513 February 2015ColumbiaRelief Request 3ISI-15 - Reactor Pressure Vessel Head Flange Leak-off Line, for the Third 10-Year Inservice Inspection Interval
ML15040A02012 February 2015Wolf CreekRelief Request I3R-10, Alternative from Pressure Test Requirements of ASME Code, Section XI, IWC-5220, Third 10-Year Inservice Inspection Interval
ML15089A15525 March 2015Diablo CanyonNRR E-mail Capture - Diablo Units 1 and 2 - (Round 2) Requests for Additional Information (Rais) for License Amendment Request 14-01 Associated with Revision to TS 3.8.1, AC Sources - Operating
ML16098A53014 April 2016North AnnaAudit Plan - Application for Amendment North Anna Power Station, Units 1 and 2. the Proposed License Amendment Revises the Issues Identified in Westinghouse Documents NSAL-09-5, Rev 1 and NSAL-15-1
ML16344A21912 December 2016LimerickSafety Evaluation for Limerick, Units 1 and 2, Proposed License Amendment to Revise the Technical Specifications to Address the High-Pressure Coolant Injection Operability Requirement Under Low Reactor Pressure Conditions
ML17004A2955 January 2017PerrySafety Evaluation Report- Application for Amendment Perry Nuclear Power Plant
ML17319A50327 November 2017River BendSummary of the License Renewal Environmental Audit
ML17324A5066 December 2017River BendSummary of the License Renewal Application Review Severe Accident Mitigation Alternatives Site Audit
ML17333A0777 November 2017PROJ0694Infogram 14-1 November 7, 2017 Meeting
ML17360A05425 April 2018Turkey PointSubsequent License Renewal Application Online Reference Portal
ML18038A6913 April 2018Turkey PointRequest for Withholding Information from Public Disclosure
ML18087A43320 April 2018Turkey PointChange in Determination for Withholding Information from Public Disclosure
ML18093A11717 April 2018Diablo CanyonRequest for Withdrawal FRN
ML18094A9024 June 2018Indian PointLetter to the Environmental Protection Agency Announcing the Issuance of Supplement 2 of the Final Supplemental Environmental Impact Statement for the Renewal of Licenses for Indian Point Generating Unit Nos. 2 and 3
ML18096B39716 May 2018Indian PointFederal Register Notice for Issuance of Supplement 2 to the Indian Point Final Environmental Impact Statement for License Renewal
ML18109A51716 May 2018Turkey PointFederal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement for the Turkey Point SLR
ML18127A11617 May 2018SeabrookProject Manager Change for the License Renewal of Seabrook Station, Unit 1
ML18131A0164 June 2018River BendNotice of Availability of the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1
ML18131A0974 June 2018River BendNotice of Availability of the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1
ML18155A58028 November 2018WaterfordIssuance of Scoping Summary Report Associated with License Renewal Application Environmental Review (CAC No. MF7493; EPID No. L-2016-LNE-0001)
ML18165A14016 August 2018WaterfordNotice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford 3
ML18165A39920 August 2018WaterfordFRN Draft SEIS Availability
ML18165A42416 August 2018WaterfordNotice of Availability of the Draft Plant-Specific Supplement 59 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Waterford
ML18198A2737 August 2018NRC Presentation on Subsequent License Renewal at 2018 ANS-Utility Working Conference
ML18214A3835 September 2018Peach BottomSubsequent License Renewal Application Online Reference Portal
ML18232A43810 September 2018Peach BottomLetter - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Peach Bottom Atomic Power Station, Units 2 and 3
ML18232A4394 September 2018Peach BottomFederal Register Notice - Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for Peach Bottom Atomic Power Station, Units 2 and 3
ML18233A18223 August 2018River BendLicense Renewal Application Review Updated Budget Estimate and Status Letter (CAC Nos. MF9747 and MF9778)
ML18257A03823 November 2018WaterfordCommunications Plan Regarding the Renewal of the Waterford Steam Electric Station, Unit 3, Renewed Operating License
ML18261A21422 October 2018River BendResponse to Comments on the Draft Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1
ML18270A38027 September 2018SeabrookProject Manager Change for the License Renewal of Seabrook Station Unit 1, License Renewal Application
ML18296A6438 November 2018River BendNotice of Availability of the Final Plant-Specific Supplement 58 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding River Bend Station, Unit 1